TE10.26adopted
315-325 Spadina Avenue - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. 315 Spadina LP is constructing a 13-storey residential condominium building at 315-325 Spadina Avenue. The site is located on the north-east corner of Spadina Avenue and D'Arcy Street. Transportation Services is requesting approval to close the north sidewalk on D'Arcy Street for a period of 26 months, from February 1, 2024 to March 31, 2026 to facilitate construction staging operations. Pedestrian movements on the north side of D'Arcy Street abutting the site will be restricted and pedestrians will be directed to the south side sidewalk of D'Arcy Street. Additionally, approval is being requested to close the public laneway east of Spadina Avenue north of D'Arcy Street in various degrees for a period of 26 months, from February 1, 2024 to March 31, 2026 to facilitate construction staging operations.
The Toronto and East York Community Council: 1. Authorized the closure of the north sidewalk on D'arcy Street, between a point 8 metres east of Spadina Avenue and a point 48 metres further east, from February 1, 2024 to March 31, 2026 inclusive, to accommodate construction staging operations. 2. Authorized the full closure of the public laneway east of Spadina Avenue north of D'Arcy Street, between D'Arcy Street and a point 54 metres further north, from February 1, 2024 to April 31, 2025 inclusive, to accommodate construction staging operations. 3. Authorized the closure of a 3.5 metre wide portion of the public laneway east of Spadina Avenue north of D'Arcy Street, between D'Arcy Street and a point 54 metres further north from January 1, 2026 to March 31, 2026 inclusive, to accommodate construction staging operations. 4. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 5. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 6. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 8. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. Directed the applicant to cooperate with and provide all necessary assistance to the City engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and to remove any staging to accommodate the necessary municipal infrastructure work at no cost to the City. 15. Directed that D'Arcy Street, and the public laneway east of Spadina Avenue north of D'Arcy Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the closure of the north sidewalk on D'arcy Street, between a point 8 metres east of Spadina Avenue and a point 48 metres further east, from February 1, 2024 to March 31, 2026 inclusive, to accommodate construction staging operations. 2. Toronto and East York Community Council authorize the full closure of the public laneway east of Spadina Avenue north of D'Arcy Street, between D'Arcy Street and a point 54 metres further north, from February 1, 2024 to April 31, 2025 inclusive to accommodate construction staging operations. 3. Toronto and East York Community Council authorize the closure of a 3.5 metre wide portion of the public laneway east of Spadina Avenue north of D'Arcy Street, between D'Arcy Street and a point 54 metres further north from January 1, 2026 to March 31, 2026 inclusive, to accommodate construction staging operations. 4. Toronto and East York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 5. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 6. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 7. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 12. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 13. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 14. Toronto and East York Community Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and to remove any staging to accommodate the necessary municipal infrastructure work at no cost to the City. 15. Toronto and East York Community Council direct that D'Arcy Street, and the public laneway east of Spadina Avenue north of D'Arcy Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE10.27amended
20-26 Maitland Street - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. TMG Builders is constructing a 40-storey residential building with two levels of underground parking. The site is located on the north side of Maitland Street between Yonge Street and Church Street. Transportation Services is requesting approval to temporarily close a portion of the westbound lane on Maitland Street and a portion of the sidewalk on the north side of Maitland Street for a period of 36 months, from January 25, 2024 to December 31, 2026 to accommodate a construction staging area. Pedestrian operations on the north side of Maitland Street will be maintained in a covered and protected walkway within the closed portion of the existing westbound lane. One-way westbound traffic movement will be maintained on Maitland Street. The construction staging area will result in the loss of seven on-street parking machine spaces on the south side of Maitland Street.
The Toronto and East York Community Council: 1. Authorized the closure of the north sidewalk and a 4 metre wide portion of the westbound north curb lane on Maitland Street, between a point 77.9 metres east of Yonge Street and a point 89.6 metres further east, and provision of a temporary pedestrian walkway within the closed portion of Maitland Street, from January 25, 2024 to January 31, 2025. 2. Rescinded the existing parking prohibition in effect all times, on the north side of Maitland Street, between a point 77.9 metres east of Yonge Street and a point 89.6 metres further east. 3. Prohibited stopping at all times on the north side of Maitland Street, between a point 77.9 metres east of Yonge Street and a point 89.6 metres further east. 4. Rescinded the existing parking prohibition in effect at all times on the south side of Maitland Street, between a point 78.6 metres east of Yonge Street and a point 12.8 metres further east. 5. Rescinded the existing parking machine regulation on the south side of Maitland Street, between a point 91.4 metres east of Yonge Street and a point 37.5 metres further east, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $5.25 per hour. 6. Rescinded the existing permit parking regulation in effect from 10:00 p.m. to 7:00 a.m. daily on the odd (south) side of Maitland Street, from a point 78.6 metres east of Yonge Street to a point 64.5 metres further east. 7. Prohibited stopping at all times on the south side of Maitland Street, between a point 78.6 metres east of Yonge Street and a point 64.5 metres further east. 8. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act. 10. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 11. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 12. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 14. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 15. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 16. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 17. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 18. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 19. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 20. Directed the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 21. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 22. In areas where no cycling lanes exist, directed the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 23. Directed the Director, Traffic Management, Transportation Services and the applicant to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Building, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 24. Directed the applicant to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management. 25. Directed that Maitland Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the north sidewalk and a 4 metre wide portion of the westbound north curb lane on Maitland Street, between a point 77.9 metres east of Yonge Street and a point 89.6 metres further east, and provision of a temporary pedestrian walkway within the closed portion of Maitland Street, from January 25, 2024 to December 31, 2026. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect all times, on the north side of Maitland Street, between a point 77.9 metres east of Yonge Street and a point 89.6 metres further east. 3. Toronto and East York Community Council prohibit stopping at all times on the north side of Maitland Street, between a point 77.9 metres east of Yonge Street and a point 89.6 metres further east. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the south side of Maitland Street, between a point 78.6 metres east of Yonge Street and a point 12.8 metres further east. 5. Toronto and East York Community Council rescind the existing parking machine regulation on the south side of Maitland Street, between a point 91.4 metres east of Yonge Street and a point 37.5 metres further east, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $5.25 per hour. 6. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 10:00 p.m. to 7:00 a.m. daily on the odd (south) side of Maitland Street, from a point 78.6 metres east of Yonge Street to a point 64.5 metres further east. 7. Toronto and East York Community Council prohibit stopping at all times on the south side of Maitland Street, between a point 78.6 metres east of Yonge Street and a point 64.5 metres further east. 8. Toronto and East York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 10. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 11. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 14. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 15. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 16. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 17. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 18. Toronto and East York Community Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 19. Toronto and East York Community Council direct that Maitland Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE10.28adopted
90-104 Queen Street East and 3 Mutual Street - Construction Staging Area Time Extension
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Citi-Core Construction Management Ltd is constructing a 34-storey mixed-use residential building with ground floor retail space at 90-104 Queen Street East and 3 Mutual Street. The site is located at the northeast corner of Queen Street East and Mutual Street. The east sidewalk and a portion of the northbound curb lane on Mutual Street is currently closed for construction staging operations. A section of Mutual Street abutting the site is temporarily designated as one-way northbound. At its meeting on February 23, 2023, Toronto and East York Community Council approved the subject construction staging area on Mutual Street from February 24, 2023 to March 1, 2024. At the time, the developer indicated they would require the staging area for a total of 34 months, from February 24, 2023 to November 30, 2025. As the previous permit was only approved for a 13 month period, the developer has requested an extension of the duration of the construction staging area on Mutual Street. Transportation Services is requesting authorization to extend the duration of the construction staging area on Mutual Street for an additional 21 months, from March 2, 2024 to November 30, 2025, to allow for the construction of the development to be completed.
The Toronto and East York Community Council: 1. Authorized the continuation of the closure of the east side sidewalk and an 8.2 metre wide portion of the northbound curb lane on Mutual Street, between Queen Street East and Richard Bigley Lane, and provision of a temporary pedestrian walkway within the closed portion of Mutual Street, from March 2, 2024 to November 30, 2025. 2. Authorized the continuation to designate Mutual Street, between Queen Street East and Richard Bigley Lane, as one-way for northbound traffic only. 3. Authorized the continuation to prohibit westbound left turns anytime, from Richard Bigley Lane onto Mutual Street. 4. Authorized the continuation to rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the east side of Mutual Street, between Queen Street East and Richard Bigley Lane. 5. Authorized the continuation to prohibit stopping at all times on the east side of Mutual Street, between Queen Street East and Richard Bigley Lane. 6. Directed the applicant to continue pressure washing or sweeping (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Directed the applicant to continue constructing (as per the City's engineer approved specifications) and maintaining a fully covered, protected and unobstructed walkway, compliant with the Accessibility for Ontarians with Disabilities Act, for all pedestrians, including for those with mobility devices for the entire duration of the construction staging area permit 8. Directed the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Directed the applicant to continue clearly consulting and communicating all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 10. Directed the applicant to continue installing appropriate signage and request the applicant to continue installing converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Directed the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to continue providing a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Directed the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Directed the applicant to continue, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. Directed the applicant to continue establishing a Construction Management Working Group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas, and local school administration. 18. Directed that the occupation permit for construction staging on Mutual Street continue to be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Directed that Mutual Street be returned to its pre-construction traffic and parking regulations when the project is complete. 20. Directed the applicant to continue creating a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Directed the applicant to continue mitigating light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 22. Directed the applicant to continue emailing monthly construction progress reports to the local Councillor, local residents' association and the Business Improvement Area Board of Management.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the continuation of the closure of the east side sidewalk and an 8.2 metre wide portion of the northbound curb lane on Mutual Street, between Queen Street East and Richard Bigley Lane, and provision of a temporary pedestrian walkway within the closed portion of Mutual Street, from March 2, 2024 to November 30, 2025. 2. Toronto and East York Community Council authorize the continuation to designate Mutual Street, between Queen Street East and Richard Bigley Lane, as one-way for northbound traffic only. 3. Toronto and East York Community Council authorize the continuation to prohibit westbound left turns anytime, from Richard Bigley Lane onto Mutual Street. 4. Toronto and East York Community Council authorize the continuation to rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the east side of Mutual Street, between Queen Street East and Richard Bigley Lane. 5. Toronto and East York Community Council authorize the continuation to prohibit stopping at all times on the east side of Mutual Street, between Queen Street East and Richard Bigley Lane. 6. Toronto and East York Community Council direct the applicant to continue pressure washing or sweeping (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Toronto and East York Community Council direct the applicant to continue constructing (as per the City's engineer approved specifications) and maintaining a fully covered, protected and unobstructed walkway, compliant with the Accessibility for Ontarians with Disabilities Act, for all pedestrians, including for those with mobility devices for the entire duration of the construction staging area permit 8. Toronto and East York Community Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 9. Toronto and East York Community Council direct the applicant to continue clearly consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. Toronto and East York Community Council direct the applicant to continue installing appropriate signage and request the applicant to continue installing converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 11. Toronto and East York Community Council direct the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to continue providing a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 13. Toronto and East York Community Council direct the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 15. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 16. Toronto and East York Community Council direct the applicant to continue, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. Toronto and East York Community Council direct the applicant to continue establishing a construction management working group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas, and local school administration. 18. Toronto and East York Community Council direct that the occupation permit for construction staging on Mutual Street continue to be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Toronto and East York Community Council direct that Mutual Street be returned to its pre-construction traffic and parking regulations when the project is complete. 20. Toronto and East York Community Council direct the applicant to continue creating a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Toronto and East York Community Council direct the applicant to continue mitigating light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 22. Toronto and East York Community Council direct the applicant to continue emailing monthly construction progress reports to the local Councillor, local residents' association and the Business Improvement Area Board of Management.
TE10.29adopted
To obtain Toronto and East York Community Council approval for the amendment of the Fire Route By-law to designate certain locations as fire routes within the meaning of City of Toronto Municipal Code Chapter 880, as amended. Fire Services uses designated fire routes as a key mechanism in regulating fire prevention, including the prevention of spreading of fires and the delivery of fire protection services.
The Toronto and East York Community Council: 1. Designated that part or those parts of the private road or roads shown on the site plans filed with the Fire Chief and General Manager, Toronto Fire Services in respect of the municipal addresses set out below, as fire routes pursuant to Municipal Code Chapter 880 - Fire Routes: 15 Baseball Place; 25 Baseball Place; 30 Baseball Place; and 45 Baseball Place. 2. Authorized the Fire Chief and General Manager, Toronto Fire Services and the City Solicitor to take the appropriate action to make a designated Fire Route.
Staff recommendation as filed
The Fire Chief and General Manager, Toronto Fire Services, recommends that: 1. Toronto and East York Community Council designate that part or those parts of the private road or roads shown on the site plans filed with the Fire Chief in respect of the municipal addresses set out below, as fire routes pursuant to Municipal Code Chapter 880 - Fire Routes: - 15 Baseball Place; - 25 Baseball Place; - 30 Baseball Place; and - 45 Baseball Place. 2. Toronto and East York Community Council authorize the Fire Chief and City Solicitor to take the appropriate action to make a designated Fire Route.
TE10.30adopted
Honda Indy Toronto Race 2024 - Temporary Street Closures
As the proposed street closures involve a motor vehicle race and takes place on a major arterial road, City Council approval is required. Transportation Services is requesting approval to temporarily close and amend the necessary traffic regulations on Lake Shore Boulevard West, between Strachan Avenue and Ontario Drive and on Strachan Avenue, between Fleet Street and Lake Shore Boulevard West from July 17, 2024 to July 22, 2024. In the event of a delay or cancellation of the race on Sunday, July 21, 2024, the final race will be held on Monday, July 22, 2024. This temporary closure to vehicular traffic is required to facilitate the Honda Indy Toronto hosted by Green Savoree Toronto, ULC.
The Toronto and East York Community Council recommends that: 1. City Council grant authority to enter into a new one-year agreement with Green Savoree Toronto ULC, to permit the holding of the Honda Indy Toronto event in 2024 on terms and conditions satisfactory to the General Manager, Transportation Services, and in a form satisfactory to the City Solicitor. 2. City Council amend Section 937-3.1 of City of Toronto Municipal Code Chapter 937, Temporary Closing of Highways, subject to the City's execution of the agreement between the City and Green Savoree Toronto ULC described in Recommendation 1 above, to delegate authority to the General Manager, Transportation Services to temporarily close to vehicular and pedestrian traffic any highway or portion of a highway for such periods as required for the purposes of the Honda Indy Toronto automobile race in 2024. 3. City Council authorize and direct the appropriate City Officials to take the necessary action to give effect to City Council's decision, including the introduction in City Council of any Bills that may be required.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. City Council grant authority to enter into a new one-year agreement with Green Savoree Toronto ULC, to permit the holding of the Honda Indy Toronto event in 2024 on terms and conditions satisfactory to the General Manager of Transportation Services, and in a form satisfactory to the City Solicitor. 2. City Council amend Section 937-3.1 of City of Toronto Municipal Code Chapter 937, Temporary Closing of Highways, subject to the City's execution of the agreement between the City and Green Savoree Toronto ULC described in Recommendation 1, to delegate authority to the General Manager of Transportation Services to temporarily close to vehicular and pedestrian traffic any highway or portion of a highway for such periods as required for the purposes of the Honda Indy Toronto automobile race in 2024. 3. City Council authorize and direct the appropriate City Officials to take the necessary action to give effect to the above, including the introduction in Council of any Bills that may be required.
TE10.31adopted
Accessible Loading Zone - Dundas Street West
As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West, City Council approval of this report is required. Transportation Services is requesting approval for the installation of a designated on-street accessible loading zone on the south side of Dundas Street West, between Keele Street and Indian Grove, to operate at all times except from 7:00 a.m. to 9:00 a.m., Monday to Friday. The establishment of this accessible loading zone will provide unimpeded curbside access for the Wheel-Trans users and accessible permit holders visiting the Toronto Orthopedic Services at 2829 Dundas Street West. During the investigation, Transportation Services discovered a discrepancy between the by-lawed parking regulations and the posted signage on the south side of Dundas Street West, between Keele Street and Indian Grove. Recommendation 5 will rectify this inconsistency.
The Toronto and East York Community Council recommends that: 1. City Council designate an accessible loading zone to be in effect at all times, except from 7:00 a.m. to 9:00 a.m., Monday to Friday, on the south side of Dundas Street West, between a point 56 metres east of Keele Street and a point 11 metres further east. 2. City Council rescind the existing parking machine regulation in effect from 9:00 a.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.75 per hour and for a maximum period of three hours, on the south side of Dundas Street West, between Quebec Avenue and Indian Grove. 3. City Council authorize the installation of parking machines on the south side of Dundas Street West, between Quebec Avenue and a point 56 metres east of Keele Street, to be in effect from 9:00 a.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.75 per hour and for a maximum period of three hours. 4. City Council authorize the installation of parking machines on the south side of Dundas Street West, between a point 67 metres east of Keele Street and Indian Grove, to be in effect from 9:00 a.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.75 per hour and for a maximum period of three hours. 5. City Council rescind the existing maximum one-hour parking regulation in effect from 9:00 a.m. to 6:00 p.m., daily, on the south side of Dundas Street West, between a point opposite Heintzman Avenue and Indian Grove.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council designate an accessible loading zone to be in effect at all times, except from 7:00 a.m. to 9:00 a.m., Monday to Friday, on the south side of Dundas Street West, between a point 56 metres east of Keele Street and a point 11 metres further east. 2. City Council rescind the existing parking machine regulation in effect from 9:00 a.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.75 per hour and for a maximum period of three hours, on the south side of Dundas Street West, between Quebec Avenue and Indian Grove. 3. City Council authorize the installation of parking machines on the south side of Dundas Street West, between Quebec Avenue and a point 56 metres east of Keele Street, to be in effect from 9:00 a.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.75 per hour and for a maximum period of three hours. 4. City Council authorize the installation of parking machines on the south side of Dundas Street West, between a point 67 metres east of Keele Street and Indian Grove, to be in effect from 9:00 a.m. to 9:00 p.m., Monday to Friday, from 8:00 a.m. to 9:00 p.m., Saturday, and from 1:00 p.m. to 9:00 p.m., Sunday, at a rate of $2.75 per hour and for a maximum period of three hours. 5. City Council rescind the existing maximum one-hour parking regulation in effect from 9:00 a.m. to 6:00 p.m., daily, on the south side of Dundas Street West, between a point opposite Heintzman Avenue and Indian Grove.
TE10.32adopted
Accessible Loading Zone - Kingston Road
As the Toronto Transit Commission (TTC) operates a transit service on Kingston Road East, City Council approval of this report is required. Transportation Services is recommending the designation of an on-street accessible loading zone to operate at all times except from 3:00 p.m. to 7:00 p.m., Monday to Friday, on the south side of Kingston Road, between Beech Avenue and Balsam Avenue. The establishment of this accessible loading zone will provide unimpeded curbside access for the Wheel-Trans users and accessible permit holders, visiting the YMCA located at 907 Kingston Road.
The Toronto and East York Community Council recommends that: 1. City Council designate an accessible loading zone to operate at all times except from 3:00 p.m. to 7:00 p.m., Monday to Friday, on the south side of Kingston Road, between a point 54 metres east of Beech Avenue and a point 11 metres further east. 2. City Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 3:00 p.m., Monday to Friday, from 8:00 a.m. to 6:00 p.m., Saturday, at a rate of $2.75 per hour and for a maximum period of three hours, on the south side of Kingston Road, between Beech Avenue and Balsam Avenue. 3. City Council authorize the installation of parking machines on the south side of Kingston Road, between Beech Avenue and a point 54 metres east and between a point 65 metres east of Beech Avenue and Balsam Avenue, to be in effect from 8:00 a.m. to 3:00 p.m., Monday to Friday, for a maximum period of three hours and at a rate of $2.75 per hour. 4. City Council authorize the installation of parking machines on the south side of Kingston Road, between Beech Avenue and Balsam Avenue, to be in effect from 8:00 a.m. to 6:00 p.m., Saturday, for a maximum period of three hours and at a rate of $2.75 per hour.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council designate an accessible loading zone to operate at all times except from 3:00 p.m. to 7:00 p.m., Monday to Friday, on the south side of Kingston Road, between a point 54 metres east of Beech Avenue and a point 11 metres further east. 2. City Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 3:00 p.m., Monday to Friday, from 8:00 a.m. to 6:00 p.m., Saturday, at a rate of $2.75 per hour and for a maximum period of three hours, on the south side of Kingston Road, between Beech Avenue and Balsam Avenue. 3. City Council authorize the installation of parking machines on the south side of Kingston Road, between Beech Avenue and a point 54 metres east and between a point 65 metres east of Beech Avenue and Balsam Avenue, to be in effect from 8:00 a.m. to 3:00 p.m., Monday to Friday, for a maximum period of three hours and at a rate of $2.75 per hour. 4. City Council authorize the installation of parking machines on the south side of Kingston Road, between Beech Avenue and Balsam Avenue, to be in effect from 8:00 a.m. to 6:00 p.m., Saturday, for a maximum period of three hours and at a rate of $2.75 per hour.
TE10.33adopted
Accessible Parking Spaces - January 2024 (Delegated)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation/removal of on-street accessible parking spaces for persons with disabilities.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 to the report (January 8, 2024) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 and attached to the report entitled "Accessible Parking Spaces-January 2024 (Delegated)", dated January 8, 2024 from the Director, Traffic Management, Transportation Services.
TE10.34adopted
Accessible Parking Space - January 2024 (Non-Delegated)
As the Toronto Transit Commission (TTC) operates a transit service on Donlands Avenue, City Council approval of this report is required. Transportation Services is requesting approval for the removal of an on-street accessible parking space on the east side of Donlands Avenue.
The Toronto and East York Community Council recommends that: 1. City Council authorize the removal of an on-street accessible parking space at the location identified in Attachment 1 to the report (January 8, 2024) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the removal of an on-street accessible parking space at the location identified in Attachment 1, attached to the report entitled "Accessible Parking Space-January 2024 (Non-Delegated)", dated January 8, 2024 from the Director, Traffic Management, Transportation Services.
TE10.35adopted
Parking Amendments - Donlands Avenue
As the Toronto Transit Commission (TTC) operates a transit service on Donlands Avenue, City Council approval of this report is required. Transportation Services is recommending that the existing alternate side parking on Donlands Avenue, between Mortimer Avenue and Sammon Avenue, be rescinded and affixed to both sides of the street. This is in response to a petition, received from the Ward Councillor's office, signed by the residents of Donlands Avenue, requesting the discontinuation of the alternate side parking between Mortimer Avenue and Sammon Avenue. During the course of the investigation, it was noted that there is a discrepancy between posted signs and the existing parking regulations. Recommendations 7 and 8 will correct this inconsistency.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of May, July, September, and November, on the even (west) side of Donlands Avenue from Sammon Avenue to Milverton Boulevard. 2. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of January, February, March, April, June, August, October, and December, on the odd (east) side of Donlands Avenue from Sammon Avenue to Milverton Boulevard. 3. City Council rescind the existing parking prohibition in effect at all times during the months of May, July, September, and November, on the east side of Donlands Avenue, between Mortimer Avenue and a point 420 metres north of Danforth Avenue. 4. City Council rescind the existing parking prohibition in effect at all times during the months of January, February, March, April, June, August, October, and December, on the west side of Donlands Avenue, between Mortimer Avenue and a point 420 metres north of Danforth Avenue. 5. City Council authorize permit parking to be in effect from 11:00 p.m. to 5:00 a.m., daily, on the odd (east) side of Donlands Avenue, from Milverton Boulevard to Mortimer Avenue. 6. City Council authorize permit parking to be in effect from 11:00 p.m. to 5:00 a.m., daily, on the even (west) side of Donlands Avenue, from Milverton Boulevard to Mortimer Avenue. 7. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of May, July, September, and November, on the even (west) side of Donlands Avenue from Mortimer Avenue to Sammon Avenue. 8. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of January, February, March, April, June, August, October, and December, on the odd (east) side of Donlands Avenue from Mortimer Avenue to Sammon Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of May, July, September, and November, on the even (west) side of Donlands Avenue from Sammon Avenue to Milverton Boulevard. 2. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of January, February, March, April, June, August, October, and December, on the odd (east) side of Donlands Avenue from Sammon Avenue to Milverton Boulevard. 3. City Council rescind the existing parking prohibition in effect at all times during the months of May, July, September, and November, on the east side of Donlands Avenue, between Mortimer Avenue and a point 420 metres north of Danforth Avenue. 4. City Council rescind the existing parking prohibition in effect at all times during the months of January, February, March, April, June, August, October, and December, on the west side of Donlands Avenue, between Mortimer Avenue and a point 420 metres north of Danforth Avenue. 5. City Council authorize permit parking to be in effect from 11:00 p.m. to 5:00 a.m., daily, on the odd (east) side of Donlands Avenue, from Milverton Boulevard to Mortimer Avenue. 6. City Council authorize permit parking to be in effect from 11:00 p.m. to 5:00 a.m., daily, on the even (west) side of Donlands Avenue, from Milverton Boulevard to Mortimer Avenue. 7. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of May, July, September, and November, on the even (west) side of Donlands Avenue from Mortimer Avenue to Sammon Avenue. 8. City Council rescind the existing permit parking regulation in effect from 11:00 p.m. to 5:00 a.m., daily, during the months of January, February, March, April, June, August, October, and December, on the odd (east) side of Donlands Avenue from Mortimer Avenue to Sammon Avenue.
TE10.36adopted
Parking Amendments - Sammon Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that stopping be prohibited at all times on three short sections of the north side of Sammon Avenue, between Pape Avenue and Dewhurst Boulevard North, to accommodate three mid-block curb extensions. Currently there is permit parking along these blocks and the change will result in the loss of two permit parking spaces in Area 8A. This parking zone, 8A, has ample availability to absorb the loss. The proposed changes align with and support other safety improvements that will be constructed as part of the road reconstruction of Sammon Avenue planned in 2024.
The Toronto and East York Community Council: 1. Prohibited stopping at all times on the north side of Sammon Avenue, between a point 82.6 metres east of Pape Avenue and a point 5.4 metres further east. 2. Prohibited stopping at all times on the north side of Sammon Avenue, between a point 85.5 metres west of Woodycrest Avenue and a point 4.4 metres further west. 3. Prohibited stopping at all times on the north side of Sammon Avenue, between a point 89.4 metres east of Woodycrest Avenue and a point 5 metres further east.
Staff recommendation as filed
The Director, Planning, Design and Management, Transportation Services recommends that: 1. Toronto and East York Community Council prohibit stopping at all times on the north side of Sammon Avenue, between a point 82.6 metres east of Pape Avenue and a point 5.4 metres further east. 2. Toronto and East York Community Council prohibit stopping at all times on the north side of Sammon Avenue, between a point 85.5 metres west of Woodycrest Avenue and a point 4.4 metres further west. 3. Toronto and East York Community Council prohibit stopping at all times on the north side of Sammon Avenue, between a point 89.4 metres east of Woodycrest Avenue and a point 5 metres further east.
TE10.37adopted
Turn Prohibitions - Bloor Street West and Perth Avenue
As the Toronto Transit Commission (TTC) operates a transit service on Bloor Street West, City Council approval of this report is required. On July 19, 20, 21 and 22, 2022, City Council authorized the installation of traffic control signals at the intersection of Bloor Street West and Perth Avenue. With the planned installation of these traffic control signals, the close spacing to the existing signalized intersection at Sterling Road/Symington Avenue, and due to its current offset nature of the intersection, at this time Transportation Services is recommending prohibiting: · left-turns at all times and in all directions, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue; · straight-through movements at all times, bicycles excepted, in the northbound and southbound directions at the intersection of Bloor Street West and Perth Avenue; and · right-turns on red in the northbound and southbound directions, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue.
The Toronto and East York Community Council recommends that: 1. City Council rescind the eastbound left-turn prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue. 2. City Council rescind the northbound left-turn prohibition in effect from 7:00 a.m. to 7:00 p.m., Monday to Friday, except public holidays, at the intersection of Bloor Street West and Perth Avenue. 3. City Council prohibit left-turns in all directions, at all times, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue. 4. City Council prohibit northbound and southbound through movements at all times, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue. 5. City Council prohibit right-turns on a red signal at all times in the northbound and southbound directions, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue.
Staff recommendation as filed
The Deputy General Manager, Transportation Services recommends that: 1. City Council rescind the eastbound left-turn prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue. 2. City Council rescind the northbound left-turn prohibition in effect from 7:00 a.m. to 7:00 p.m., Monday to Friday, except public holidays, at the intersection of Bloor Street West and Perth Avenue. 3. City Council prohibit left-turns in all directions, at all times, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue. 4. City Council prohibit northbound and southbound through movements at all times, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue. 5. City Council prohibit right-turns on a red signal at all times in the northbound and southbound directions, bicycles excepted, at the intersection of Bloor Street West and Perth Avenue.
TE10.38adopted
Speed Bump - Public Lane west of Alhambra Avenue, south of Bloor Street West (East-West Leg)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed the feasibility and is recommending the installation of a speed bump in the public lane (east-west leg) west of Alhambra Avenue, south of Bloor Street West.
The Toronto and East York Community Council: 1. Authorized the installation of a speed bump in the public lane (east-west), west of Alhambra Avenue, south of Bloor Street West, between lane (north-south) west of Alhambra Avenue, and south of Bloor Street West and west end of lane (east-west) west of Alhambra Avenue, south of Bloor Street West, as shown on Attachment 1, Drawing 421T-0672, to the report (January 8, 2024) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of a speed bump in the public lane (east-west), west of Alhambra Avenue, south of Bloor Street West, between lane (north-south) west of Alhambra Avenue, and south of Bloor Street West and west end of lane (east-west) west of Alhambra Avenue, south of Bloor Street West, as shown on Drawing No. 421T-0672, dated December 2023 and attached to the report entitled "Speed Bump - Public Lane west of Alhambra Avenue, south of Bloor Street West (East-West Leg)", dated January 8, 2024 from the Director, Traffic Management, Transportation Services.
TE10.39adopted
Appointment of Public Members to the Ted Reeve Community Arena Board
City Council has authorized the City Clerk to shortlist, interview and recommend candidates to Community Councils for appointment to the Ted Reeve Community Arena Board. This report recommends five candidates for appointment to the board.
The Toronto and East York Community Council: 1. Appointed the following candidates to the Ted Reeve Community Arena Board, at pleasure of Council, for a term of office ending on June 25, 2028, and until successors are appointed: Paul M Casey Adrianne Johnstone Dario Gonzalez Mardjetko Jonathan O'Keefe Amanda Rachmat 2. Directed that Confidential Attachment 1 to the report (January 3, 2024) from the City Clerk remain confidential in its entirety as it relates to personal matters about identifiable individuals being considered for appointment to the Ted Reeve Community Arena.
Staff recommendation as filed
The City Clerk recommends that: 1. Toronto and East York Community Council appoint the following candidates to the Ted Reeve Community Arena Board, at pleasure of Council, for a term of office ending on June 25, 2028, and until successors are appointed: Paul M Casey Adrianne Johnstone Dario Gonzalez Mardjetko Jonathan O'Keefe Amanda Rachmat 2. Toronto and East York Community Council direct that Confidential Attachment 1 remain confidential in its entirety as it relates to personal matters about identifiable individuals being considered for appointment to the Ted Reeve Community Arena.
TE10.40amended
The purpose of this report is to provide details on the current status of the Ontario Line project within the boundaries of Toronto and East York Community Council (TEYCC), including timelines, construction mitigation plans, and community engagement milestones. On July 19, 2023, City Council adopted TM1.2 - City of Toronto Recommendations for Metrolinx's Ontario Line Construction within the Toronto and East York District to fulfill the Ontario Line Subcommittee's ('Subcommittee') mandate by consolidating City staff recommendations while incorporating public feedback provided throughout the Subcommittee's duration, reflecting on City Council directives, and providing a clear and comprehensive package of initiatives that the Province and Metrolinx should implement to construct the Ontario Line. City staff have shared the recommendations with Metrolinx and Metrolinx has responded, indicating general support for incorporating the City's recommendations. This report includes responses from Metrolinx regarding: community benefits; business supports; community engagement; traffic and construction management; affordable housing and rental replacement; real estate; and parks and neighbourhood investments. This report also includes updates on Ontario Line implementation, including the status of major contracts and other construction updates.
The Toronto and East York Community Council recommends that: 1. City Council direct the Executive Director, Transit Expansion to request Metrolinx to: a. accelerate the restoration of the southbound streetcar tracks on York Street, to match the current schedule of the City's advanced time frame for Adelaide Street construction; b. provide a comprehensive communication and marketing strategy by the second quarter of 2024 for Business Improvement Areas impacted by the construction of the Ontario Line, including necessary financial supports; c. work in conjunction with the City of Toronto's Music Office to provide support for live music venues impacted by Ontario Line construction, including, but not limited to, a detailed work schedule to ensure bookings can be adjusted in advance of disruptions; d. provide an update to the City on City Council's request to establish minimum targets for affordable rental housing in all Transit Oriented Communities; e. take all actions available to ensure that owners and tenants do not experience financial loss due to impact or displacement due to construction of the Ontario Line; f. provide a formalizing, public, workforce development program as part of the community benefits strategy for inclusion in the next quarterly update; and g. investigate supports for resident and business groups outside of the Business Improvement Area framework.
Staff recommendation as filed
The Executive Director, Transit Expansion Division, recommends that: 1. Toronto and East York Community Council receive this report for information.
TE10.41deferred
1404-1428 Yonge Street - Construction Staging Area
City Council on December 13, 14, and 15, 2023, referred Item TE9.45 to the January 24, 2024 meeting of the Toronto and East York Community Council. Summary from the report and attachment 1 (October 30, 2023) from the Director, Traffic Management, Transportation Services on 1404-1428 Yonge Street - Construction Staging Area As the Toronto Transit Commission (TTC) operates a transit service on Yonge Street, City Council approval of this report is required. YSC Development Corp is constructing a 50-storey condominium building at 1404-1428 Yonge Street. The site is located on the west side of Yonge Street between St Clair Avenue West and Farnham Avenue. Transportation Services is requesting approval to close the west sidewalk, the southbound bike lane, a portion of the southbound lane, and the northbound bike lane on Yonge Street for a period of 35 months, from November 30, 2023 to October 31, 2026 to facilitate construction staging operations. Pedestrian movements on the west side of Yonge Street, abutting the site, will be maintained in a minimum 1.8 metre-wide covered and protected walkway. The southbound and northbound bike lanes will be closed, and signage will be posted informing cyclists the bike lane ends in advance of the construction staging area and shared lane pavement markings will be installed advising cyclists and motorists to merge into a single traffic lane in the vicinity of the work zone. The construction staging area will result in the loss of four parking machine on-street spaces on the west side of Yonge Street.
The Toronto and East York Community Council: 1. Deferred consideration of the item until the February 21, 2024 meeting of the Toronto and East York Community Council.
TE10.42forwarded without recommendation
316 Bloor Street West - Request for City Solicitor to Attend at the Toronto Local Appeal Body
The applicant applied to the Committee of Adjustment requesting variances from Site Specific Zoning By-law 595-2021(OLT), as amended by City Wide By-law 569-2013 (Application Number A0597/23TEY), including variances to height, maximum permitted gross floor area, and minimum amenity space. Site Specific By-law No. 595-2021 (OLT) zones the subject property to permit a 29-storey mixed-use building of 98 metres. The applicant applied to permit a mixed-use building of 121.4 metres. On December 13, 2023, the Toronto East York Panel of the Committee of Adjustment approved the requested variances, with conditions including a cash contribution allocated towards community facilities, recreation, cultural space, and/or streetscape improvements within Ward 11 (the "Decision"). (Decision in Attachment 1). In its report dated December 4, 2023, City Planning Staff commented that they had no objections to the proposed variances. Staff recommended that the Owner make a cash contribution to the City of Toronto, should the Committee of Adjustment approve the variances. (Staff Report in Attachment 2). This letter will authorize and direct the City Solicitor to appeal and to attend the Toronto Local Appeal Body, along with appropriate City staff, in order to oppose the Committee of Adjustment's decision, on the ground that the variances were not minor. This Motion will also authorize the City Solicitor to retain outside consultants and to resolve the matter on behalf of the City in her discretion. This matter is time sensitive and urgent as the City Solicitor has already appealed the Decision to the Toronto Local Appeal Body in order to preserve the City's statutory right and requires instructions to appeal and attend the hearing for this matter.
The Toronto and East York Community Council forwards the Item to City Council without recommendations.
Staff recommendation as filed
Councillor Dianne Saxe recommends that: 1. City Council authorize the City Solicitor to both appeal and attend the Toronto Local Appeal Body, with appropriate City staff, in order to determine whether the variances approved by the Committee of Adjustment regarding the proposed development at 316 Bloor Street West (Application Number A0597/23TEY) were "minor". 2. City Council authorize the City Solicitor to retain outside consultants as necessary. 3. City Council authorize the City Solicitor to attempt to negotiate a resolution regarding Application Number A0597/23TEY respecting 316 Bloor Street West and City Council authorize the City Solicitor to resolve the matter on behalf of the City, at the City Solicitor's discretion, after consultation with the Ward Councillor and the Director, Community Planning, Toronto East York District.
TE10.43adopted
Orde Street Public School Traffic Calming
Parents of students attending Orde St Public School have expressed grave concerns about safety outside the school's main entrance. Every day, approximately 350 children enter and exit the school through its main entrance, which is located on a high-traffic laneway adjacent to a busy parking lot. Numerous vehicles speed through this laneway, posing significant risks to our children. There have already been several near-miss accidents, and it's only a matter of time before a more severe incident occurs. Transportation Services agrees that children's safety in this area can be improved by installing speed humps in the laneway close to the school entrance.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the first laneway west of University Avenue, north of Orde Street, at the locations shown on Attachment 1, Drawing No. TC-224, to the letter (December 21, 2023) from Councillor Dianne Saxe.
Staff recommendation as filed
Councillor Dianne Saxe recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the first laneway west of University Avenue, north of Orde Street, at the locations shown on Attachment 1 - Drawing No. TC-224, dated November 2023, from the Director, Traffic Management, Transportation Services, Toronto and East York District.
TE10.44adopted
The parking by-laws on Scarth Road at South Drive require amendment. Vehicles chronically stop at the north/west corner of Scarth Road, at South Drive, obstructing the pedestrian walk. This creates an unsafe crossing situation, particularly for pedestrians with accessible needs. In order to deter stopping in this area, Transportation Services recommends increasing the corner parking prohibition from its current "No Parking Anytime" regulation to a "No Stopping Anytime" regulation. This will help deter drivers from blocking the pedestrian path and improve sightlines, particularly for pedestrians with accessible needs. There will be no loss of on-street parking with this parking amendment.
The Toronto and East York Community Council: 1. Prohibited stopping at all times on the west side of Scarth Road, between South Drive and a point 12.4 metres north.
Staff recommendation as filed
Councillor Dianne Saxe recommends that: 1. Toronto and East York Community Council prohibit stopping at all times on the west side of Scarth Road, between South Drive and a point 12.4 metres north.
TE10.45adopted
There is a narrow, crooked lane west of Palmerston Avenue, between Barton Avenue and Palmerston Square, which is not suitable for wide vehicles. Wayfinding apps have been directing an increasing number of large vehicles to attempt to traverse this lane. These attempts have a significant risk of scraping the vehicle against the concrete side walls, causing public and private damage. To reduce such damage, vehicles greater than two metres in width should be prohibited from travelling on this lane.
The Toronto and East York Community Council: 1. Prohibited vehicles over two metres in width from travelling on the first lane west of Palmerston Avenue, between Barton Avenue and Palmerston Square.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council prohibit vehicles over two metres in width from travelling on the first lane west of Palmerston Avenue, between Barton Avenue and Palmerston Square.
TE10.46adopted
759-763 Queen Street East Permit Parking Realignment
I am writing to ask that you support a request for Transportation Services to report on realigning the permit parking area to exclude the development at 759-763 Queen Street East from the on-street permit parking program. The local permit parking area is in high demand already. Considering the provision of off-street parking at this development and the current permit parking pressures on local streets, I am asking for your support for this request.
The Toronto and East York Community Council recommends that: 1. City Council request the General Manager, Transportation Services to review and report back on the feasibility of amending Schedule B of the City of Toronto Municipal Code Chapter 925, Permit Parking, to exclude the development located at 759-763 Queen Street east from Permit Parking. an on-street parking permit and the building will be excluded from any on-street permit in the specified area.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. City Council request the General Manager, Transportation Services to review and report back on the feasibility of amending Schedule B of the City of Toronto Municipal Code Chapter 925, Permit Parking, to exclude the development located at 759-763 Queen Street east from Permit Parking. an on-street parking permit and the building will be excluded from any on-street permit in the specified area.
TE10.47adopted
Stop Control - Bowman Street and Carlton Street
I am writing to request your support in implementing stop control for southbound motorists on Bowman Street at Carlton Street. There are no existing traffic controls and the right-of-way rule applies at Bowman Street and Carlton Street. Following a review by the City's Vision Zero Projects, a minor street stop control was recommended at this uncontrolled three-way "T" type intersection to clearly define the right-of-way, regulate traffic flow and enhance driver and pedestrian safety.
The Toronto and East York Community Council: 1. Authorized compulsory stop control for southbound traffic on Bowman Street at Carlton Street.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize compulsory stop control for southbound traffic on Bowman Street at Carlton Street.
TE10.48amended
Reducing the speed limit on outstanding collector roads to 30 km/h within Ward 4
In 2015, a motion to reduce the speed limit of all local (residential) roads in the Toronto and East York Community Council area from 40 km/h to 30 km/h was passed. In 2021, through the direction of Vision Zero, this was expanded city wide. However, certain streets were excluded because they were classified as a collector road. Transportation staff were asked to review the collector roads in the ward. Transportation staff have completed their review of the outstanding collector roads in Ward 4 that are still 40 km/h. Reducing the speed limit from 40 km/h to 30 km/h will improve safety and provide consistency with the surrounding residential street that are 30 km/h. Vision Zero 2.0 states that higher vehicle speeds contribute to higher risk of serious injuries and fatalities by reducing driver reaction time, increasing the vehicle stopping distance, and inflicting more severe blunt force trauma on victims upon impact. Speed reduction aims to mitigating risks associated with high speeds.
The Toronto and East York Community Council: 1. Authorized the reduction in the speed limit of all roads designated as Collector roads that currently have a speed limit above 40 kilometres per hour down to 30 kilometres per hour within the confines of Ward 4 (Parkdale‐High Park), excluding any Collector roads that bound more than the Toronto and East York Community Council area, and excluding Collector roads that bound Wards 9 (Davenport), 10 (Spadina‐Fort York). 2. Amended City of Toronto Municipal Code Chapter 950, Traffic and Parking, generally as outlined in Attachment 1 to the letter (January 19, 2024) from Councillor Gord Perks.
Staff recommendation as filed
Councillor Perks recommends that: 1. Toronto and East York Community Council authorize the reduction in the speed limit of all roads designated as Collector roads that currently have a speed limit above 40 km/h down to 30 km/h within the confines of Ward 4 (Parkdale‐High Park), excluding any Collector roads that bound more than the Toronto and East York Community Council area, and excluding Collector roads that bound Wards 9 (Davenport), 10 (Spadina‐Fort York). 2. Toronto and East York Community Council amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, generally as outlined in Attachment 1 to the letter January 19, 2024 from Councillor Gord Perks. 3. Toronto and East York Community Council authorize and direct the appropriate City Officials to take the necessary action to give effect to City Council's decision, including the introduction in Council of any and all Bills that may be required.
TE10.49adopted
Reducing the speed limit on Dufferin Street, south of Queen Street West
Dufferin Street, south of Queen Street West borders Ward 4 (Parkdale-High Park) and Ward 10 (Spadina-Fort York). The speed limit is currently posted at 50 km/h. North of Queen Street West, the speed limit was previously reduced to 40 km/h: https://secure.toronto.ca/council/agenda-item.do?item=2019.TE2.55 Vision Zero 2.0 states that higher vehicle speeds contribute to higher risk of serious injuries and fatalities by reducing driver reaction time, increasing the vehicle stopping distance, and inflicting more severe blunt force trauma on victims upon impact. Speed reduction aims to mitigating risks associated with high speeds. Transportation staff have reviewed the stretch of Dufferin Street, south of Queen Street West and recommend a speed reduction to mitigate risks.
The Toronto and East York Community Council: 1. Reduced the speed limit on Dufferin Street, between Springhurst Avenue and Queen Street West from 50 kilometres per hour to 40 kilometres per hour. 2. Reduced the speed limit on Dufferin Street, between Springhurst Avenue and the south of end of Dufferin Street from 50 kilometres per hour to 30 kilometres per hour.
Staff recommendation as filed
Deputy Mayor Ausma Malik and Councillor Gord Perks recommend that: 1. Toronto and East York Community Council reduce the speed limit on Dufferin Street, between Springhurst Avenue and Queen Street West from 50 km/h to 40 km/h. 2. Toronto and East York Community Council reduce the speed limit between Springhurst Avenue and the south of end of Dufferin Street from 50 km/h to 30 km/h on Dufferin Street.
TE10.50adopted
Parking Amendments - Peter Street
I am writing to you today to request your support in amending the on-street parking regulations on the west side of Peter Street, between Richmond Street West and Adelaide Street West in connection to the new development at 108 Peter Street. Under current conditions, the existing motorcycle parking area on this section of Peter Street encroaches into the new driveway that services this building. Transportation Services is recommending that the existing motorcycle parking remain but must be shortened to deter parking in this area and blocking the driveway. The proposed amendment will resolve this discrepancy.
The Toronto and East York Community Council: 1. Rescinded the existing parking machine designated as a motorcycle parking zone on the west side of Peter Street, between a point 37.5 metres south of Richmond Street West and a point 11 metres further south, in effect from 8:00 a.m. to 6:00 p.m., and 6:00 p.m. to 12:00 a.m., Monday to Saturday, and 1:00 p.m. to 12:00 a.m., Sunday, from April 1 to October 31 inclusive, at a rate of $0.00 per hour and for an unlimited period. 2. Rescinded the existing parking machine designation on the west side of Peter Street, between a point 37.5 metres south of Richmond Street West and a point 11 metres further south, in effect from 8:00 a.m. to 6:00 p.m., and 6:00 p.m. to 12:00 a.m., Monday to Saturday, and 1:00 p.m. to 12:00 a.m., Sunday, from April 1 to October 31 inclusive, at a rate of $0.00 per hour and for an unlimited period. 3. Authorized the installation of parking machines designated as a motorcycle parking zone on the west side of Peter Street, between a point 37.5 metres south of Richmond Street West and a point 5.5 metres further south, in effect from 8:00 a.m. to 6:00 p.m., and 6:00 p.m. to 12:00 a.m., Monday to Saturday, and 1:00 p.m. to 12:00 a.m., Sunday, from April 1 to October 31 inclusive, at a rate of $0.00 per hour and for an unlimited period.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council rescind the existing parking machine designated as a motorcycle parking zone on the west side of Peter Street, between a point 37.5 metres south of Richmond Street West and a point 11 metres further south, in effect from 8:00 a.m. to 6:00 p.m., and 6:00 p.m. to 12:00 a.m., Monday to Saturday, and 1:00 p.m. to 12:00 a.m., Sunday, from April 1 to October 31 inclusive, at a rate of $0.00 per hour and for an unlimited period. 2. Toronto and East York Community Council rescind the existing parking machine designation on the west side of Peter Street, between a point 37.5 metres south of Richmond Street West and a point 11 metres further south, in effect from 8:00 a.m. to 6:00 p.m., and 6:00 p.m. to 12:00 a.m., Monday to Saturday, and 1:00 p.m. to 12:00 a.m., Sunday, from April 1 to October 31 inclusive, at a rate of $0.00 per hour and for an unlimited period. 3. Toronto and East York Community Council authorize the installation of parking machines designated as a motorcycle parking zone on the west side of Peter Street, between a point 37.5 metres south of Richmond Street West and a point 5.5 metres further south, in effect from 8:00 a.m. to 6:00 p.m., and 6:00 p.m. to 12:00 a.m., Monday to Saturday, and 1:00 p.m. to 12:00 a.m., Sunday, from April 1 to October 31 inclusive, at a rate of $0.00 per hour and for an unlimited period.