TE3.26adopted
Construction Staging Area Time Extension - John Street - 283 Adelaide Street West
This staff report is about a matter for which the Community Council has delegated authority from City Council to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to close the east sidewalk and curb lane on John Street to construct the condominium. Mondiale Development Ltd., is building a 48-storey condominium building with six levels of underground parking at 283 Adelaide Street West, located at the southeast corner of Adelaide Street West and John Street. In order to construct the development, Mondiale Development Ltd., requires the aforementioned closures. This closure will be in effect for 24 months. Toronto and East York Community Council, at its meeting on January 17, 2017, approved the subject construction staging area on John Street, from February 1, 2017 to January 31, 2019. Transportation Services is requesting approval to extend the duration of the subject construction staging area from March 1, 2019 to July 31, 2019 in order to complete the construction of the development.
The Toronto and East York Community Council: 1. Approved the continuation of the closure of the sidewalk and curb lane on the east side of John Street, between Pearl Street and a point 48.0 metres north, from March 1, 2019 to July 31, 2019. 2. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Directed that John Street be returned to its pre-construction traffic regulations when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the continuation of the closure of the sidewalk and curb lane on the east side of John Street, between Pearl Street and a point 48.0 metres north, from March 1, 2019 to July 31, 2019. 2. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Toronto and East York Community direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Toronto and East York Community direct that John Street be returned to its pre-construction traffic regulations when the project is completed.
TE3.27adopted
Construction Staging Area Time Extension - Phase 1 - 19 Duncan Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Westbank Projects Corp. is constructing a 57-storey high mixed-use development at 219 and 223 Adelaide Street West and 19 Duncan Street. Construction of the development will be undertaken in several phases. This report deals with matters related to Phase 1 of construction only on Duncan Street, which includes drilling, shoring and installation of façade retention steel structure. The sidewalk on the east side of Duncan Street abutting the site is currently closed to accommodate construction staging operations for the development. Pedestrians are directed to the sidewalk on the west side of Duncan Street. Toronto and East York Community Council, at its meeting on September 6, 2017, approved the subject construction staging area from October 9, 2017 to April 9, 2018, including a one-way northbound operation. A Motion from Councillor Joe Cressy dated June 5, 2018, recommended the traffic on Duncan Street to be returned to 2-way traffic operations with only the sidewalk on the east side of Duncan Street to be closed as part of the Construction Staging Area, as well as an extension until December 31, 2018. Transportation Services is requesting an approval to extend the duration of the subject construction staging area from March 1, 2019 to April 30, 2019 in order to complete the Phase 1 of construction.
The Toronto and East York Community Council: 1. Approved the continuation of the closure of the east sidewalk on Duncan Street, between Adelaide Street West and a point 31 metres south, from March 1, 2019 to April 30, 2019. 2. Directed the Acting Director, Traffic Management, Transportation Services, to add as a condition of permit, a requirement provision for a Traffic Control Person to be stationed at the intersection of Adelaide Street West and Duncan Street from March 1, 2019 to April 30, 2019. 3. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. Directed that Duncan Street be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the continuation of the closure of the east sidewalk on Duncan Street, between Adelaide Street West and a point 31 metres south, from March 1, 2019 to April 30, 2019. 2. Toronto and East York Community Council direct the Acting Director, Traffic Management, Transportation Services, to add as a condition of permit, a requirement provision for a Traffic Control Person to be stationed at the intersection of Adelaide Street West and Duncan Street from March 1, 2019 to April 30, 2019. 3. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. Toronto and East York Community Council direct that Duncan Street be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
TE3.28adopted
Construction Staging Area - Armoury Street - 11 and 33 Centre Avenue and 80 Chestnut Street
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. EllisDon Corporation is constructing a 17-storey institutional building at the lands located at 11 and 33 Centre Avenue and 80 Chestnut Street. The site is bounded by an existing commercial building (55 Centre Avenue and 108-110 Chestnut Street to the north, Chestnut Street to the east, Armoury Street to the south and Centre Avenue to the west. Operating under a monthly Street Occupation Permit, a construction staging area has been setup on the north sidewalk and a portion of the westbound curb lane on Armoury Street, between Centre Avenue and Chestnut Street. Transportation Services is requesting approval to the close of the north sidewalk and two westbound lanes on Armoury Street, in order to accommodate construction activities. As a result, of the subject construction staging area, the existing pedestrian crossover on the east leg of Armoury Street and Chestnut Street is obstructed, creating sight line issues for both motorists and pedestrians at the intersection. Therefore, Transportation Services is also requesting approval to install all-way stop controls at the intersection of Armoury Street and Centre Avenue, and for the removal of the existing pedestrian crossover. This recommendation would better serve the needs of the pedestrian crossing the roadways and address the sight line issues. The construction staging area and installation of all-way stop controls for the development is requested for a period of 12 months. A construction staging areas for the development has also been proposed within the west sidewalk and a portion of the southbound lane on Chestnut Street. Matters related to the subject construction staging areas on Chestnut Street will be discussed in a future staff report, as the project nears the phase where this street occupation is required.
The Toronto and East York Community Council: 1. Approved the closure of the north sidewalk and the two westbound lanes on Armoury Street, between Centre Avenue and Chestnut Street, from February 21, 2019 to February 21, 2020. 2. Rescinded the existing pedestrian crossover on Armoury Street, immediately east of Centre Avenue. 3. Authorized all-way compulsory stop controls at the intersection of Armoury Street and Centre Avenue. 4. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the north side of Armoury Street, between a point 23 metres west of Chestnut Street and Centre Avenue. 5. Rescinded the existing parking prohibition in effect at all times on the south side of Armoury Street, between Centre Avenue and Chestnut Street. 6. Rescinded the existing standing prohibition in effect at all times on the south side of Armoury Street, between Centre Avenue and Chestnut Street. 7. Prohibited stopping at all times on both sides of Armoury Street, between Centre Avenue and Chestnut Street. 8. Directed that Armoury Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the north sidewalk and the two westbound lanes on Armoury Street, between Centre Avenue and Chestnut Street, from February 21, 2019 to February 21, 2020. 2. Toronto and East York Community Council rescind the existing pedestrian crossover on Armoury Street, immediately east of Centre Avenue. 3. Toronto and East York Community Council authorize all-way compulsory stop controls at the intersection of Armoury Street and Centre Avenue. 4. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the north side of Armoury Street, between a point 23 metres west of Chestnut Street and Centre Avenue. 5. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the south side of Armoury Street, between Centre Avenue and Chestnut Street. 6. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the south side of Armoury Street, between Centre Avenue and Chestnut Street. 7. Toronto and East York Community Council prohibit stopping at all times on both sides of Armoury Street, between Centre Avenue and Chestnut Street. 8. Toronto and East York Community Council direct that Armoury Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.29adopted
Construction Staging Area Time Extension - 143 Avenue Road
As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required. Dash Developments is constructing a 10-storey mixed-use development at 143 Avenue Road. The site is located on the south-east quadrant of Avenue Road and Davenport Road. The sidewalk and a portion of the northbound curb lane on the east side of Avenue Road fronting the site are currently closed to accommodate construction staging operations for the development. City Council, at its meeting on January 31 and February 1, 2018, approved the subject construction staging area on Avenue Road, from February 7, 2018 to February 7, 2019. A time extension of the construction staging area on Avenue Road for an additional 8 months (i.e. from February 26, 2019 to October 13, 2019), in order to complete the construction of the development.
The Toronto and East York Community Council recommends that: 1. City Council approve the continuation of the closure of the east sidewalk on Avenue Road, between a point 20 metres south a Davenport Road and a point 61 metres further south, from February 26, 2019 to October 31, 2019. 2. City Council approve the continuation of the closure of the northbound curb lane on Avenue Road, between a point 20 metres south a Davenport Road and a point 61 metres further south and the provision of a temporary pedestrian walkway within the closed lane, from February 26, 2019 to October 31, 2019. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Avenue Road be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the continuation of the closure of the east sidewalk on Avenue Road, between a point 20 metres south a Davenport Road and a point 61 metres further south, from February 26, 2019 to October 31, 2019. 2. City Council approve the continuation of the closure of the northbound curb lane on Avenue Road, between a point 20 metres south a Davenport Road and a point 61 metres further south and the provision of a temporary pedestrian walkway within the closed lane, from February 26, 2019 to October 31, 2019. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Avenue Road be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.30adopted
Construction Staging Area - 547-555 College Street - Phase 2
As the Toronto Transit Commission (TTC) operates a transit service on College Street, City Council approval of this report is required. SKYGRiD Construction Incorporated is constructing mixed-use commercial retail and residential suites at the lands municipally known as 547, 549 and 555 College Street. This development includes 3-story building and a 6-story commercial building. The site is bounded by a public laneway to the south, existing commercial building to the east and College Street to the north, and Manning Avenue to the west. Transportation Services is requesting approval to close the sidewalk on the south side of College Street and remove 6 pay parking spots on College Street within the lay-by. This occupation is Phase 2 for development of this site and would be required for the duration of 20 months to accommodate shoring and excavation work construction staging operations for the development. With the proposed construction staging area in place, vehicular traffic operations on College Street will be maintained. Pedestrian will be directed to a covered walkway within the lay-by on College Street fronting this site. Vehicular operations on College Street will remain unchanged. A change in parking on College Street would occur as a result of the removal of 6 pay parking spots required for staging and site access.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the sidewalk approximately 30.0 metres east of Manning Avenue and a point approximately 30.0 metres further east, from March 1, 2019 to October 31, 2020. 2. City Council approve the closure of the lay-by lane on the south side of College Street from Manning Avenue to a point approximately 36.0 metres east from March 1, 2019 to October 31, 2020. 3. City Council rescind the existing parking machine regulation in effect on the south side of College Street from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m., Sundays from a point 17.0 metres east of Manning Avenue to a point approximately 91.0 metres east. 4. City Council prohibit stopping at all times on the south side of College Street, from Manning Avenue to a point 91.0 metres further east. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct that College Street be returned to its pre-construction conditions when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council approve the closure of the sidewalk approximately 30.0 metres east of Manning Avenue and a point approximately 30.0 metres further east, from March 1, 2019 to October 31, 2020. 2. City Council approve the closure of the lay-by lane on the south side of College Street from Manning Avenue to a point approximately 36.0 metres east from March 1, 2019 to October 31, 2020. 3. City Council rescind the existing parking machine regulation in effect on the south side of College Street from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m., Sundays from a point 17.0 metres east of Manning Avenue to a point approximately 91.0 metres east. 4. City Council prohibit stopping at all times on the south side of College Street, from Manning Avenue to a point 91.0 metres further east. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct that College Street be returned to its pre-construction conditions when the project is completed.
TE3.31adopted
Construction Staging Area - 20 Edward Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Lifetime Developments is constructing a 30-storey condominium at 20 Edward Street. The site is bounded by a public laneway to the north, existing commercial uses (6 - 10 Edward Street) to the east, Edward Street to the south and existing residential (633 Bay Street) uses to the west. Transportation Services is requesting approval to close the north sidewalk and a portion of the westbound lane on Edward Street abutting the north side of the site for a period of 36 months to accommodate a construction staging operations. Pedestrian operations on Edward Street will be maintained within the closed portion of the curb lane.
The Toronto and East York Community Council: 1. Approved the closure of the north sidewalk and a 2.4 metre wide portion of the westbound curb lane on Edward Street, between a point 42 metres west of Yonge Street and a point 75 metres further west, from February 21, 2019 to February 28, 2022. 2. Rescinded the existing parking prohibition in effect at all times on the north side of Edward Street, from a point 32 metres west of Yonge Street to a point 118 metres further west. 3. Prohibited stopping at all times on the north side of Edward Street, from a point 32 metres west of Yonge Street to a point 118 metres further west. 4. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and 1:00 p.m. to 9:00 p.m., Sunday, on the south side of Edward Street, between a point 36 metres west of Yonge Street and a point 88 metres further west. 5. Prohibited stopping at all times on the south side of Edward Street, from a point 36 metres west of Yonge Street to a point 88 metres further west. 6. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Directed that Edward Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the north sidewalk and a 2.4 metre wide portion of the westbound curb lane on Edward Street, between a point 42 metres west of Yonge Street and a point 75 metres further west, from February 21, 2019 to February 28, 2022. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the north side of Edward Street, from a point 32 metres west of Yonge Street to a point 118 metres further west. 3. Toronto and East York Community Council prohibit stopping at all times on the north side of Edward Street, from a point 32 metres west of Yonge Street to a point 118 metres further west. 4. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and 1:00 p.m. to 9:00 p.m., Sunday, on the south side of Edward Street, between a point 36 metres west of Yonge Street and a point 88 metres further west. 5. Toronto and East York Community Council prohibit stopping at all times on the south side of Edward Street, from a point 36 metres west of Yonge Street to a point 88 metres further west. 6. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Toronto and East York Community Council direct that Edward Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.32adopted
Construction Staging Area - 387-403 Bloor Street East
As the Toronto Transit Commission (TTC) operates a transit service on Bloor Street East, City Council approval of this report is required. SkyGrid Construction Incorporated is constructing a 54-storey residential building and a 10-story hotel building at 387-403 Bloor Street East. The development site will have frontage on both Bloor Street East and Selby Street, respectively. The development is currently in progress, operating under a monthly Street Occupation Permit. Transportation Services is requesting approval to close the sidewalk and a portion of the eastbound lane on the south side of Bloor Street East for a period of 12 months to accommodate construction staging operations. The developer originally requested a closure for 34 months but Transportation Services is seeking authority for 12 months at this time. Staff will review the need to extend the duration of the construction staging area and seek authority from City Council if necessary. Construction staging area for the development has also been proposed within the north sidewalk and boulevard on Selby Street. Matters related to the construction staging area on Selby Street will be discussed in a future staff report nearer the time when the subject occupation is required.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the south sidewalk and a 2.8 metre wide portion of the eastbound curb lane on Bloor Street East, between a point 26 metres west of Sherbourne Street and a point 41 metres further west and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from March 5, 2019 to March 5, 2020. 2. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 5. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. City Council direct that Bloor Street East be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the closure of the south sidewalk and a 2.8 metre wide portion of the eastbound curb lane on Bloor Street East, between a point 26 metres west of Sherbourne Street and a point 41 metres further west and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from March 5, 2019 to March 5, 2020. 2. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 5. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. City Council direct that Bloor Street East be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.33adopted
Construction Staging Area - Granby Street - 389 Church Street
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City Policy or by-laws. Turner Construction Company is renovating a 13-storey affordable housing building owned by the Toronto Community Housing Corporation at 389 Church Street. The site is located in the north-east corner of Church Street and Granby Street. The renovation is currently in progress, operating under a monthly Street Occupation Permit. Transportation Services is requesting approval to close the sidewalk and a portion of the westbound lane on the north side of Granby Street abutting the site to facilitate the redevelopment. The proposed construction staging area is being requested for a period of 15 months.
The Toronto and East York Community Council: 1. Approved the closure of the sidewalk and 2.1 metre wide portion of the westbound lane on the north side of Granby Street, between a point 38 metres east of Elizabeth Street and point 32 metres further east, from February 21, 2019 to May 31, 2020. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 7:00 p.m., Monday to Saturday, and from 1:00 p.m. to 7:00 p.m., Sunday, on the south side of Granby Street, between Church Street and a point 37 metres east. 3. Prohibited stopping at all times on the south side of Granby Street, between Church Street and a point 37 metres east. 4. Rescinded the existing parking prohibition in effect at all times on the north side of Granby Street, between Church Street and a point 36.6 metres east. 5. Prohibited stopping at all times on the north side of Granby Street, between Church Street and a point 41 metres east. 6. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site. 14. Direct that Granby Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the sidewalk and 2.1 metre wide portion of the westbound lane on the north side of Granby Street, between a point 38 metres east of Elizabeth Street and point 32 metres further east, from February 21, 2019 to May 31, 2020. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 7:00 p.m., Monday to Saturday, and from 1:00 p.m. to 7:00 p.m., Sunday, on the south side of Granby Street, between Church Street and a point 37 metres east. 3. Toronto and East York Community Council prohibit stopping at all times on the south side of Granby Street, between Church Street and a point 37 metres east. 4.Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the north side of Granby Street, between Church Street and a point 36.6 metres east. 5. Toronto and East York Community Council prohibit stopping at all times on the north side of Granby Street, between Church Street and a point 41 metres east. 6. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Toronto and East York Community Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Toronto and East York Community Council direct the applicant to create a publicly accessible website with regular construction updates and post the website address on the site. 14. Toronto and East York Community Council direct that Granby Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.34adopted
Construction Staging Area - 48 Power Street
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City Policy or by-laws. Tucker HiRise, is constructing a 23-storey residential condominium building with 522 units, together with ground floor retail, and a 3 level underground parking facility at 48 Power Street. The site is bounded by Adelaide Street East to the south, Richmond Street East to the north, Power Street to the east and Parliament Street to the west. Transportation Services is requesting approval to close the sidewalk and the southbound parking lane on the west side of Power Street for a period of 23 months. Pedestrian movements will be accommodated on the east side of Power Street as there is no pedestrian generators on the west side.
The Toronto and East York Community Council: 1. Approved the closure of the sidewalk and the southbound parking lane on the west side of Power Street from Richmond Street East to Adelaide Street East, from February 20, 2019 to January 31, 2021. 2. Amended the existing parking regulation in effect from 12:01 a.m. to 10:00 a.m., Monday to Friday, and from 12:01 a.m. to 7:00 a.m., Saturday and Sunday, on the (even side) west side of Power Street from King Street East to Queen Street East, to exclude the section between Adelaide Street East and Richmond Street East. 3. Prohibited stopping at all times on the west side of Power Street, from Adelaide Street East to Richmond Street East. 4. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. Directed that Power Street be returned to its pre-construction traffic regulations when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the sidewalk and the southbound parking lane on the west side of Power Street from Richmond Street East to Adelaide Street East, from February 20, 2019 to January 31, 2021. 2. Toronto and East York Community Council amend the existing parking regulation in effect from 12:01 a.m. to 10:00 a.m., Monday to Friday, and from 12:01 a.m. to 7:00 a.m., Saturday and Sunday, on the (even side) west side of Power Street from King Street East to Queen Street East, to exclude the section between Adelaide Street East and Richmond Street East. 3. Toronto and East York Community Council prohibit stopping at all times on the west side of Power Street, from Adelaide Street East to Richmond Street East. 4. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. Toronto and East York Community direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. Toronto and East York Community direct that Power Street be returned to its pre-construction traffic regulations when the project is completed.
TE3.35adopted
Construction Staging Area - Victoria Street - 15 Shuter Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. EllisDon Corporation is redeveloping the existing heritage building at 15 Shuter Street, commonly known as "Massey Hall". The redevelopment will consist of interior and exterior renovations to the existing building, as well as construction of a 9-storey commercial building adjoining the rear part of the building. The site is located on the south-west corner of Victoria Street and Shuter Street. The redevelopment is currently in progress, operating under a monthly Street Occupation Permit. Transportation Services is requesting approval to close a portion of the southbound lane on the west side of Victoria Street abutting the site to facilitate the redevelopment. The proposed construction staging area is being requested for a period of 12 months.
The Toronto and East York Community Council: 1. Approved the closure of a 3.0 metre wide portion of the southbound lane on the west side of Victoria Street, between Shuter Street and a point 55.5 metres south, from March 5, 2019 to March 5, 2020. 2. Rescinded the existing commercial loading zone regulation in effect at all times on the west side of Victoria Street, between a point 42 metres south of Shuter Street and a point 33 metres further south. 3. Rescinded the existing stopping prohibition in effect at all times on the west side of Victoria Street, between a point 20 metres south of Shuter Street and a point 45.2 metres further south. 4. Prohibited stopping at all times on the west side of Victoria Street, between Shuter Street and a point 75 metres south. 5. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 8. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 10. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site. 13. Directed that Victoria Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of a 3.0 metre wide portion of the southbound lane on the west side of Victoria Street, between Shuter Street and a point 55.5 metres south, from March 5, 2019 to March 5, 2020. 2. Toronto and East York Community Council rescind the existing commercial loading zone regulation in effect at all times on the west side of Victoria Street, between a point 42 metres south of Shuter Street and a point 33 metres further south. 3. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the west side of Victoria Street, between a point 20 metres south of Shuter Street and a point 45.2 metres further south. 4. Toronto and East York Community Council prohibit stopping at all times on the west side of Victoria Street, between Shuter Street and a point 75 metres south. 5. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 8. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 10. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 11. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 12. Toronto and East York Community Council direct the applicant to create a publicly accessible website with regular construction updates and post the website address on the site. 13. Toronto and East York Community Council direct that Victoria Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.36adopted
Accessible Loading Zone - Binswood Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to implement an accessible loading zone adjacent to No. 42 Barker Avenue, located on the west side of Binswood Avenue. The establishment of an accessible loading zone will provide unimpeded curbside access for Wheel-Trans and accessible permit holders, and will not result in the loss of any permit parking spaces.
The Toronto and East York Community Council: 1. Designated an accessible loading zone to operate at all times on the west side of Binswood Avenue, between a point 15 metres north of Barker Avenue and a point 11 metres further north. 2. Amended the existing parking prohibition in effect from 8:00 a.m. to 10:00 a.m. and from 3:00 p.m. to 5:00 p.m., Monday to Friday, on the west side of Binswood Avenue, between Barker Avenue and Holborne Avenue, to be in effect from a point 26 metres north of Barker Avenue and Holborne Avenue.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council designate an accessible loading zone to operate at all times on the west side of Binswood Avenue, between a point 15 metres north of Barker Avenue and a point 11 metres further north. 2. Toronto and East York Community Council amend the existing parking prohibition in effect from 8:00 a.m. to 10:00 a.m. and from 3:00 p.m. to 5:00 p.m., Monday to Friday, on the west side of Binswood Avenue, between Barker Avenue and Holborne Avenue, to be in effect from a point 26 metres north of Barker Avenue and Holborne Avenue.
TE3.37withdrawn
As the Toronto Transit Commission (TTC) operates a transit service on all four legs of this intersection, City Council approval of this report is required. Transportation Services is requesting approval from City Council to reconfigure the intersection of The Queensway, Queen Street West, King Street West and Roncesvalles Avenue, as well as the approaches to the intersection. Also, this report includes required traffic and parking regulation amendments associated with this project. This project will improve public transportation, pedestrian environment, the public realm and traffic circulation in this area.
Item TE3.37 was withdrawn from the Agenda.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the alteration of The Queensway, Queen Street West, King Street West and Roncesvalles Avenue intersection and its vicinity, as shown in the Drawing Nos. 421G-3297, 421G-3304, 421G-3305, 421G-3306 and 421G-3307 dated January 2019 and attached to the report from the Acting Director, Traffic Management, Transportation Services, dated January 21, 2019. 2. City Council adopt regulatory amendments listed in Appendices "A" and "B" attached to the report from the Acting Director, Traffic Management, Transportation Services, dated January 21, 2019.
TE3.38adopted
Removal of Accessible Loading Zone - Springhurst Avenue
As the Toronto Transit Commission (TTC) operates a transit service on this segment of Springhurst Avenue, City Council approval of this report is required. Transportation Services is requesting approval to remove a designated on-street accessible loading zone, located on the north side of Springhurst Avenue, between Cowan Avenue and Dunn Avenue. The accessible permit holder who originally requested the accessible loading space has moved and no longer requires the designated space.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing on-street accessible loading zone that operates from 6:00 a.m. to 4:00 p.m., Monday to Friday, on the north side of Springhurst Avenue, between a point 40.8 metres west of Cowan Avenue and a point 8 metres further west.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council rescind the existing on-street accessible loading zone that operates from 6:00 a.m. to 4:00 p.m., Monday to Friday, on the north side of Springhurst Avenue, between a point 40.8 metres west of Cowan Avenue and a point 8 metres further west.
TE3.39adopted
Designation of Fire Routes and amendment to Chapter 880 - Fire Routes - 28 Bathurst Street
To obtain Toronto and East York Community Council approval for the amendment of the Fire Route By-law to designate certain locations as fire routes within the meaning of City of Toronto Municipal Code Chapter 880, as amended. Fire Services uses designated fire routes as a key mechanism in regulating fire prevention, including the prevention of spreading of fires and the delivery of fire protection services.
The Toronto and East York Community Council: 1. Designated part or those parts of the private road or roads shown on the site plan filed with the Fire Chief, and General Manager, Toronto Fire Services in respect of the municipal addresses set out below, as a fire route pursuant to Municipal Code Chapter 880 - Fire Routes - 28 Bathurst Street.; and 2. Authorized the Fire Chief, and General Manager, Toronto Fire Services, and City Solicitor to take the appropriate action to make a designated Fire Route.
Staff recommendation as filed
The Fire Chief and General Manager, Toronto Fire Services recommends that: 1. Toronto and East York Community Council designate part or those parts of the private road or roads shown on the site plan filed with the Fire Chief in respect of the municipal addresses set out below, as a fire route pursuant to Municipal Code Chapter 880 - Fire Routes - 28 Bathurst Street.; and 2. Toronto and East York Community Council authorize the Fire Chief and City Solicitor to take the appropriate action to make a designated Fire Route.
TE3.40adopted
To obtain Toronto and East York Community Council approval for the amendment of the Fire Route By-law to designate certain locations as fire routes within the meaning of City of Toronto Municipal Code Chapter 880, as amended. Fire Services uses designated fire routes as a key mechanism in regulating fire prevention, including the prevention of spreading of fires and the delivery of fire protection services.
The Toronto and East York Community Council: 1. Designated part or those parts of the private road or roads shown on the site plan filed with the Fire Chief, and General Manager, Toronto Fire Services in respect of the municipal addresses set out below, as a fire route pursuant to Municipal Code Chapter 880 - Fire Routes - 8 York Street, 208 and 218 Queens Quay West; and 2. Authorized the Fire Chief, and General Manager, Toronto Fire Services, and City Solicitor to take the appropriate action to make a designated Fire Route.
Staff recommendation as filed
The Fire Chief and General Manager, Toronto Fire Services recommends that: 1. Toronto and East York Community Council designate part or those parts of the private road or roads shown on the site plan filed with the Fire Chief in respect of the municipal addresses set out below, as a fire route pursuant to Municipal Code Chapter 880 - Fire Routes - 8 York Street, 208 and 218 Queens Quay West; and 2. Toronto and East York Community Council authorize the Fire Chief and City Solicitor to take the appropriate action to make a designated Fire Route.
TE3.41adopted
Extension of Permit Parking Hours - Springdale Boulevard
This staff report is about a matter which Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval from Toronto and East York Community Council to extend the overnight on-street permit parking hours on Springdale Boulevard, between Coxwell Avenue and Glebemount Avenue from 11:00 p.m. to 7:00 a.m., 7 days a week to the new hours of 12:01 a.m. to 10:00 a.m., 7 days a week. By extending the overnight on-street permit parking hours residents will have improved parking flexibility and the Parking Enforcement Unit, Toronto Police Service, can effectively control long term parking by non-residents through tagging and towing operations.
The Toronto and East York Community Council: 1. Approved the extension of the overnight on-street permit parking hours on Springdale Boulevard, between Coxwell Avenue and Glebemount Avenue from 11:00 p.m. to 7:00 a.m., 7 days a week to the new hours of 12:01 a.m. to 10:00 a.m., 7 days a week.
Staff recommendation as filed
The Manager, Transportation Services, Right of Way Management, Toronto and East York recommends that: 1. Toronto and East York Community Council approve the extension of the overnight on-street permit parking hours on Springdale Boulevard, between Coxwell Avenue and Glebemount Avenue from 11:00 p.m. to 7:00 a.m., 7 days a week to the new hours of 12:01 a.m. to 10:00 a.m., 7 days a week.
TE3.42deferred
Parking Regulation Amendment - Mackay Avenue
This staff report is about a matter that Toronto and East York Community Council has delegated authority from City Council to make a final decision. The purpose of this report is to install a "No Parking Anytime" regulation on the north side of Mackay Avenue, between the first laneway west of Dufferin Street and a point 27 metres further west. The proposed parking amendment was requested by a resident whose parking pad is consistently blocked by vehicles parked in a substandard parking space.
The Toronto and East York Community Council deferred consideration of the item until its March 19, 2019 meeting.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing parking prohibition in effect from December 1 of one year to March 31 of the next following year, inclusive and from the 1st day to the 15th day of each month from April 1 to November 30, inclusive on the north side of Mackay Avenue, from the first laneway west of Dufferin Street to a point 27 metres further west. 2. Toronto and East York Community Council rescind the existing one hour parking maximum in effect from 8:00 a.m. to 6:00 p.m., Monday to Saturday, 16th day to the last day of each month from April 1 to November 30, inclusive on the north side of Mackay Avenue, from the first laneway west of Dufferin Street to a point 27 metres further west. 3. Toronto and East York Community Council prohibit parking at all times on the north side of Mackay Avenue, from the first laneway west of Dufferin Street to a point 27 metres further west.
TE3.43adopted
Additional Parking Amendments - Construction Staging Area - 77-83 Mutual Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Upon further assessment of the Traffic Management Plan at the development site, 77-83 Mutual Street, staff recommends extending the existing stopping prohibition in effect at all times on the west side of Mutual Street, in order to continue to facilitate the ease of flow along the entirety of Mutual Street.
The Toronto and East York Community Council: 1. Prohibited stopping at all times on the west side of Mutual Street, between Dundas Street East and a point 31.5 metres south during construction until June 1, 2019. 2. Directed that Mutual Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council prohibit stopping at all times on the west side of Mutual Street, between Dundas Street East and a point 31.5 metres south during construction until June 1, 2019. 2. Toronto and East York Community Council direct that Mutual Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE3.44adopted
Parking Amendments - Carlaw Avenue
As the Toronto Transit Commission (TTC) operates a transit service on Carlaw Avenue, City Council approval of this report is required. Transportation Services is requesting approval to prohibit stopping at all times on a section of Carlaw Avenue in the vicinity of the driveway that services No. 201 Carlaw Avenue. The proposed stopping prohibition is recommended in order to improve sight lines and address safety concerns expressed by residents exiting the driveway of the above-mentioned property.
The Toronto and East York Community Council recommends that: 1. City Council prohibit stopping at all times on the east side of Carlaw Avenue, between a point 85.7 metres north of Queen Street East and a point 21 metres further north. 2. City Council amend the existing parking prohibition in effect at all times on the east side of Carlaw Avenue, between Queen Street East and a point 106.7 metres north to be in effect between Queen Street East and a point 85.7 metres north. 3. City Council rescind the existing maximum two hour parking limit in effect from 8:00 a.m. to 4:00 p.m., Monday to Friday, on the east side of Carlaw Avenue, between Queen Street East and a point 93 metres south of Dundas Street East.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council prohibit stopping at all times on the east side of Carlaw Avenue, between a point 85.7 metres north of Queen Street East and a point 21 metres further north. 2. City Council amend the existing parking prohibition in effect at all times on the east side of Carlaw Avenue, between Queen Street East and a point 106.7 metres north to be in effect between Queen Street East and a point 85.7 metres north. 3. City Council rescind the existing maximum two hour parking limit in effect from 8:00 a.m. to 4:00 p.m., Monday to Friday, on the east side of Carlaw Avenue, between Queen Street East and a point 93 metres south of Dundas Street East.
TE3.45adopted
Installation/Removal of On-Street Accessible Parking Spaces - January 2019 - Non-Delegated
The purpose of this report is to obtain approval for the installation/removal of on-street accessible parking spaces for persons with disabilities. As the Toronto Transit Commission (TTC) operates transit service on the subject streets, City Council approval of this report is required.
The Toronto and East York Community Council recommends that: 1. City Council authorize the installation of installation/removal of on-street accessible parking spaces at the locations identified in Appendix A attached to the report (January 28, 2019) from the Acting Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services Division, recommends that: 1. City Council authorize the installation of installation/removal of on-street accessible parking spaces at the locations identified in Appendix A attached to the report dated January 28, 2019, from the Acting Director, Traffic Management, Transportation Services.
TE3.46adopted
Installation/Removal of On-Street Accessible Parking Spaces - January 2019 - Delegated
This staff report concerns a matter for which Community Council has delegated authority from City Council to make a final decision. The purpose is to obtain approval for the installation/removal of a number of on-street accessible parking spaces.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Appendix A attached to the report (January 28, 2019) from the Acting Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services Division, recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Appendix A attached to the report dated January 28, 2019 from the Acting Director, Traffic Management, Transportation Services.
TE3.47deferred
All-way Stop Controls - Greenwood Avenue and Strathmore Boulevard
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services staff have reviewed the need for all-way stop controls at the intersection of Greenwood Avenue and Strathmore Boulevard, to address residents' concerns regarding safety. Our assessment indicates the criteria as set out in the all-way stop warrant has been satisfied at this intersection. Therefore, the installation of all-way stop controls at the intersection of Greenwood Avenue and Strathmore Boulevard is recommended.
The Toronto and East York Community Council deferred consideration of the item until its March 19, 2019 meeting.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize all-way stop control at the intersection of Greenwood Avenue and Strathmore Boulevard.
TE3.48adopted
All-way Stop Control - Lawton Boulevard and Lonsdale Road
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services staff have reviewed the need for all-way stop control at the intersection of Lawton Boulevard and Lonsdale Road, to address concerns regarding safety of pedestrians, cyclists and motorists using this intersection. Our assessment indicates the criteria as set out in the all-way stop warrant has been satisfied at this intersection. Therefore, the installation of all-way stop control at the intersection of Lawton Boulevard and Lonsdale Road is recommended.
The Toronto and East York Community Council: 1. Authorized the installation of all-way stop control at the intersection of Lawton Boulevard and Lonsdale Road.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the installation of all-way stop control at the intersection of Lawton Boulevard and Lonsdale Road.
TE3.49deferred indefinitely
Traffic Calming - Speed Humps - Howland Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services staff have reviewed the need for traffic calming on Howland Avenue, between Dupont Street and Bloor Street West, to address residents' concerns regarding the speed of vehicles. Our assessment indicates the criteria as set out in the Traffic Calming Policy has not been satisfied. Therefore, traffic calming should not be installed on Howland Avenue, between Dupont Street and Bloor Street West.
The Toronto and East York Community Council deferred consideration of item TE3.49 indefinitely.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming (speed humps) on Howland Avenue, between Dupont Street and Bloor Street West.
TE3.50amended
Speed Hump Poll Results - Brunswick Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is reporting on the results of the traffic calming poll undertaken on Brunswick Avenue, between Dupont Street and Wells Street. The poll provided a response rate of less than the 50 percent plus one ballot required by the traffic calming policy needed to confirm that there is a favourable consensus in the community to install speed humps on the subject section of Brunswick Avenue. Accordingly, continuing the process to install speed humps on Brunswick Avenue, between Dupont Street and Wells Street, is not recommended.
The Toronto and East York Community Council directed: 1. The City Solicitor prepare a by-law to alter the roadway to install five speed humps on Brunswick Avenue, between Dupont Street and Wells Street, generally as shown on Drawing No. 421G-3080, dated June 2018 attached to the report entitled "Speed Hump Poll Results - Brunswick Avenue" from the Acting Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming speed humps on Brunswick Avenue, between Dupont Street and Wells Street.