TE6.51amended
30 Bond Street (St. Michael's Hospital) - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. EllisDon Corporation is constructing a 2.5 storey New Shuter Wing Building for St. Michael's Hospital at 30 Bond Street. The site is located at the south-west corner of Shuter Street and Bond Street. Transportation Services is requesting approval to temporarily close the south sidewalk and a portion of the eastbound curb lane on Shuter Street, and temporarily close the west sidewalk and a portion of the southbound curb lane on Bond Street, for a period of 29 months from June 23, 2023 to October 31, 2025, to facilitate construction staging operations. Pedestrian movements will be maintained on the south side of Shuter Street and on the west side of Bond Street within covered and protected walkways. The existing bike lanes on Shuter Street will be maintained. The construction staging area will result in the temporary loss of four on-street parking machine spaces on the south side of Shuter Street and five on-street parking machine spaces on the east side of Bond Street.
The Toronto and East York Community Council: 1. Authorized the closure of the south side sidewalk and a 3.9 metre wide portion of the eastbound curb lane on Shuter Street, between Bond Street and a point 61.2 metres west, and provision of a temporary pedestrian walkway within the closed portion of Shuter Street, from June 23, 2023 to October 31, 2025. 2. Authorized the closure of the west side sidewalk and a 2.0 metre wide portion of the southbound curb lane on Bond Street, between Shuter Street and a point 79.9 metres south, and provision of a temporary pedestrian walkway within the closed portion of Bond Street, from June 23, 2023 to October 31, 2025. 3. Rescinded the existing no parking prohibition in effect all times, on the south side of Shuter Street, between Victoria Street and Bond Street. 4. Rescinded the existing standing prohibition in effect on the south side of Shuter Street, between a point 36 metres east of Victoria Street and a point 18 metres further east. 5. Rescinded the existing parking machine regulation on the south side of Shuter Street, between Bond Street and a point 26.0 metres east, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $5.00 per hour. 6. Prohibited stopping at all times on the south side of Shuter Street, between Victoria Street and a point 26.0 metres east of Bond Street. 7. Rescinded the existing standing prohibition in effect on the west side of Bond Street, between Shuter Street and a point 79.9 metres south. 8. Rescinded the existing parking machine regulation on the east side of Bond Street, between Shuter Street and a point 79.9 metres south, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $5.00 per hour. 9. Prohibited stopping at all times on both sides of Bond Street, between Shuter Street and a point 79.9 metres south. 10. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 11. Directed the applicant to procure, install, and maintain shipping container(s) to be used as a fully covered, protected, unobstructed and wheelchair accessible pedestrian walkway prior to, or concurrent to, any permits being issued and for the entire duration of the construction staging area permit, at their sole cost. 12. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 13. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 14. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 15. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 16. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 17. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 18. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 19. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 20. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 21. Directed the Director, Traffic Management, Transportation Services and the applicant to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 22. Directed that the occupation permit for construction staging on Shuter Street and Bond Street be conditional, subject to there being no conflicts with Metrolinx transit project construction. 23. Directed that Shuter Street and Bond Street be returned to their pre-construction traffic and parking regulations when the project is complete. 24. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 25. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 26. Directed the applicant to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management. 27. Directed the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the south side sidewalk and a 3.9 metre wide portion of the eastbound curb lane on Shuter Street, between Bond Street and a point 61.2 metres west, and provision of a temporary pedestrian walkway within the closed portion of Shuter Street, from June 23, 2023 to October 31, 2025. 2. Toronto and East York Community Council authorize the closure of the west side sidewalk and a 2.0 metre wide portion of the southbound curb lane on Bond Street, between Shuter Street and a point 79.9 metres south, and provision of a temporary pedestrian walkway within the closed portion of Bond Street, from June 23, 2023 to October 31, 2025. 3. Toronto and East York Community Council rescind the existing no parking prohibition in effect all times, on the south side of Shuter Street, between Victoria Street and Bond Street. 4. Toronto and East York Community Council rescind the existing standing prohibition in effect on the south side of Shuter Street, between a point 36 metres east of Victoria Street and a point 18 metres further east. 5. Toronto and East York Community Council rescind the existing parking machine regulation on the south side of Shuter Street, between Bond Street and a point 26.0 metres east, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $5.00 per hour. 6. Toronto and East York Community Council prohibit stopping at all times on the south side of Shuter Street, between Victoria Street and a point 26.0 metres east of Bond Street. 7. Toronto and East York Community Council rescind the existing standing prohibition in effect on the west side of Bond Street, between Shuter Street and a point 79.9 metres south. 8. Toronto and East York Community Council rescind the existing parking machine regulation on the east side of Bond Street, between Shuter Street and a point 79.9 metres south, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $5.00 per hour. 9. Toronto and East York Community Council prohibit stopping at all times on both sides of Bond Street, between Shuter Street and a point 79.9 metres south. 10. Toronto and East York Community Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 11. Toronto and East York Community Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA). 12. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 13. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 14. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 15. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 16. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 17. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 18. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 19. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 20. Toronto and East York Community Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 21. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 22. Toronto and East York Community Council direct that the occupation permit for construction staging on Shuter Street and Bond Street be conditional, subject to there being no conflicts with Metrolinx transit project construction. 23. Toronto and East York Community Council direct that Shuter Street and Bond Street be returned to their pre-construction traffic and parking regulations when the project is complete.
TE6.52amended
244-260 Church Street - Construction Staging Area Time Extension
As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street East, City Council approval of this report is required. 250 Church Limited Partnership is constructing a 52-storey mixed-use residential condominium building at 244-260 Church Street. The site is located at the south-west corner of Church Street and Dundas Street East. A section of the first north-south public laneway west of Church Street, south of Dundas Street East, is currently closed to accommodate construction staging operations for the development. In addition, a 1.0 metre wide portion of the City right-of-way abutting the development site along Dundas Street East and a 0.6 metre wide portion of the right-of-way abutting the development site along Church Street are also closed for construction staging. At its meeting on March 9, 2022, City Council approved the subject construction staging areas from March 1, 2022 to July 31, 2023. At the time, the developer indicated they would require the staging area for a total of 41 months, from March 1, 2022 to July 31, 2025. As the previous permit was only approved for a 17-month period, the developer has requested an extension of the duration of the construction staging areas on the public laneway west of Church Street, on Dundas Street East and on Church Street in order to complete the construction of the development. Transportation Services is requesting authorization to extend the duration of the construction staging areas on the public laneway west of Church Street, on Dundas Street East and on Church Street for an additional 24 months, from August 1, 2023 to July 31, 2025, to allow for the construction of the development to be completed.
The Toronto and East York Community Council recommends that: 1. City Council authorize the continuation of the closure of the first north-south public laneway west of Church Street, between a point 11.4 metres south of Dundas Street East and a point 37 metres further south, from August 1, 2023 to July 31, 2024. 2. City Council authorize the continuation of the closure of a 1.0 metre wide portion of the right-of-way abutting the development site on Dundas Street East, between Church Street and a point 26.8 metres further west, from August 1, 2023 to July 31, 2024. 3. City Council authorize the continuation of the closure of a 0.6 metre wide portion of the right-of-way abutting the development site on Church Street, between Dundas Street East and a point 38 metres further south, from August 1, 2023 to July 31, 2024. 4. City Council direct the applicant to continue to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 5. City Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. City Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 7. City Council direct the applicant to continue to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times. 8. City Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. City Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. City Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. City Council direct that Dundas Street East, Church Street and the first north-south public laneway south of Dundas Street East and west of Church Street be returned to their pre-construction traffic and parking regulations when the project is complete. 14. City Council direct the applicant to continue to construct and maintain a fully covered, protected, unobstructed and wheelchair accessible pedestrian walkway for the entire duration of the construction staging area permit, at their sole cost. 15. City Council direct the applicant to continue to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to continue to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 17. City Council direct the Director, Traffic Management, Transportation Services and the applicant to continue to establish a Construction Management Working Group that meets monthly and invites local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours and local resident groups. 18. City Council direct the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the continuation of the closure of the first north-south public laneway west of Church Street, between a point 11.4 metres south of Dundas Street East and a point 37 metres further south, from August 1, 2023 to July 31, 2025. 2. City Council authorize the continuation of the closure of a 1.0 metre wide portion of the right-of-way abutting the development site on Dundas Street East, between Church Street and a point 26.8 metres further west, from August 1, 2023 to July 31, 2025. 3. City Council authorize the continuation of the closure of a 0.6 metre wide portion of the right-of-way abutting the development site on Church Street, between Dundas Street East and a point 38 metres further south, from August 1, 2023 to July 31, 2025. 4. City Council direct the applicant to continue to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 5. City Council direct the applicant to continue to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 6. City Council direct the applicant to continue to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 7. City Council direct the applicant to continue to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times. 8. City Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 10. City Council direct the applicant to continue to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 11. City Council direct the applicant to continue to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 12. City Council direct the applicant to continue to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 13. City Council direct that Dundas Street East, Church Street, and the first north-south public laneway south of Dundas Street East and west of Church Street be returned to their pre-construction traffic and parking regulations when the project is complete. 14. City Council direct the applicant to continue to construct and maintain a fully covered, protected, unobstructed, and wheelchair accessible pedestrian walkway for the entire duration of the construction staging area permit, at their sole cost. 15. City Council direct the applicant to continue to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to continue to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 17. City Council direct the Director, Traffic Management, Transportation Services and the applicant to continue to establish a construction management working group that meets monthly and invites local stakeholders including Municipal Licensing & Standards, Toronto Buildings, adjacent neighbours, and local resident groups. 18. City Council direct the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association, and Business Improvement Area Board of Management.
TE6.53adopted
Dundas Street West at Bloor Street West - Lane Designations
There are two separate intersections of Bloor Street West and Dundas Street West in the City of Toronto, this report concerns the eastern-most intersection, located in the Toronto and East York Community Council area. In support of planned quick-build safety improvements at the intersection of Dundas Street West and Bloor Street West, Transportation Services recommends that the northbound curb lane on Dundas Street West approaching Bloor Street West be designated for right-turns only, bicycles excepted. As the Toronto Transit Commission (TTC) operates transit service on Dundas Street West, City Council approval of this report is required.
The Toronto and East York Community Council recommends that: 1. City Council designate the easterly northbound lane on Dundas Street West, between Bloor Street West and a point 60 metres south for northbound right-turns only, bicycles excepted.
Staff recommendation as filed
The Director, Project Design and Management, Transportation Services recommends that: 1. City Council designate the easterly northbound lane on Dundas Street West, between Bloor Street West (TO) and a point 60 metres south for northbound right-turns only, bicycles excepted.
TE6.54amended
Kensington Market Safe Streets Implementation: Prioritizing Pedestrians in Kensington Market
Kensington Market is a cultural, community and commercial centre and a destination with high pedestrian traffic and local business operations. In 2024 and 2025, road rehabilitation and watermain replacement is programmed on several streets within Kensington Market due to the condition of the aging infrastructure: - Augusta Avenue from College Street to Dundas Street West - Baldwin Street from Augusta Avenue to Spadina Avenue - Nassau Street from Bellevue Avenue to Augusta Avenue - Kensington Avenue from Dundas Street West to Baldwin Street - St. Andrew Street from Kensington Avenue to Spadina Avenue The programmed work presents a once-in-a-lifetime opportunity to improve safety and accessibility while supporting local businesses. Extensive feedback from local stakeholders and the public has been sought through three rounds of consultation between Fall 2021 and Spring 2023. Transportation Services is recommending a design that will prioritize pedestrians while accommodating slow speed vehicle access for local residents and enhancing loading opportunities for businesses. Key features include: - Mid-block curb extensions to calm vehicular traffic and provide space for cafes, pedestrians and furnishings (bike parking, waste receptacles, etc.); - Curb extensions and reduced corner radii at intersections wherever possible; - Widened sidewalks on Augusta Street, Nassau Street and St. Andrew Street; - A universally-accessible rolled curb installed on all streets; - Concrete pavers on roadways that are permeable where possible to filter and reduce stormwater runoff; - Dedicated Commercial Loading Areas - 160 metres of commercial loading area, providing twelve (12) spaces for large delivery trucks; - Flexible Loading Areas - 234 metres of by-lawed no-parking areas that would allow temporary loading, deliveries and pick-up and drop-off, providing eighteen (18) spaces for large delivery trucks or forty-two (42 spaces) for passenger vehicles; - Reduced speed limits on all streets in the project area from 30 km/h to 20 km/h; - More bike parking and Bike Share Toronto stations; - Pedestrian-scale street lighting in partnership with the Kensington Market BIA; and - Street trees added where possible. Transportation Services also proposes to pursue a pedestrianisation pilot project following the completion of construction. This would allow more time to consult with local businesses and residents, other City Divisions and the public to determine the best balance for Kensington Market that puts pedestrians first, while also keeping the Market accessible for businesses and local residents. Staff would form and work closely with a local stakeholder committee to consult on, implement and evaluate a temporary pedestrianised zone within Kensington Market. Consultation on the pedestrianisation pilot would begin in 2024 during the tendering and construction periods of the project.
The Toronto and East York Community Council: 1. Authorized the installation of the Kensington Market Safe Streets Project and all required by-law amendments to Toronto Municipal Code Chapters 903, 910, 925, 950, as generally described in Attachment 1 to the report (June 6, 2023) from the Director, Project Design and Management. 2. Directed staff to form and work closely with a local stakeholder committee to consult on and propose to implement a time-restricted pilot project to test and evaluate a pedestrianised zone following construction of the capital works. 3. Directed Transportation Services and Engineering and Construction Services staff, in consultation with Economic Development and Culture, to work closely with the community and local businesses while completing detailed design, to develop a plan to: a. minimize the construction disruption in Kensington Market; b. ensure delivery and pickup access to each business throughout and following construction; c. provide robust and regular notification to all businesses before and during the construction period; d. work closely with community and local businesses to minimize and to communicate any property, delivery, loading and other impacts; and e. evaluate whether to reduce the speed limit from 40 kilometres per hour to 20 kilometres per hour on Nassau Street, between Augusta Avenue and Spadina Avenue. 4. Requested the Director, Project Design and Management, Transportation Services to include in the detailed design all reasonable measures to discourage non-resident through-traffic through Kensington Market. 5. Requested the General Manager, Economic and Community Development and Culture to take every reasonable step to assist Kensington Market businesses throughout construction. 6. Requested the General Manager, Economic Development and Culture report directly to City Council on any impacts on small business in the Kensington Market Safe Streets Implementation: Prioritizing Pedestrians in Kensington Market.
Staff recommendation as filed
The Director, Project Design and Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of the Kensington Market Safe Streets Project and all required by-law amendments to Toronto Municipal Code Chapters 903, 910, 925, 950, as generally described in Attachment 1 to the report (June 6, 2023) from the Director, Project Design and Management. 2. Toronto and East York Community Council direct staff to form and work closely with a local stakeholder committee to consult on and propose to implement a time-restricted pilot project to test and evaluate a pedestrianised zone following construction of the capital works.
TE6.55adopted
Accessible Parking Spaces - June 2023 (Delegated)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation/removal of on-street accessible parking spaces for persons with disabilities.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 to the report (June 6, 2023) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 and attached to the report entitled "Accessible Parking Spaces-June 2023 (Delegated)", dated June 6, 2023 from the Director, Traffic Management, Transportation Services.
TE6.56deferred
Parking Amendments - St. John's Road
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that the existing parking by permit hours on the south side of St. John's Road, between Runnymede Road and Gilmour Avenue, be extended from 12:01 a.m. to 7:00 a.m. to 12:01 a.m. to 10:00 a.m., daily. Transportation Services is also recommending the installation of parking for a maximum period of one hour, from 10:00 a.m. to 6:00 p.m., daily, on the south side of St. John's Road, between Runnymede Road and Gilmour Avenue. The proposed parking amendments will discourage long-term daytime parking and promote parking turnover on this section of St. John's Road.
The Toronto and East York Community Council: 1. Deferred consideration of the Item until the September 19, 2023 meeting of the Toronto and East York Community Council.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council amend the existing parking by permit regulation in effect from 12:01 a.m. to 7:00 a.m., daily, on the odd (south) side of St. John's Road from Gilmour Avenue to Runnymede Road be in effect from 12:01 a.m. to 10:00 a.m. 2. Toronto and East York Community Council authorize parking for a maximum period of one-hour from 10:00 a.m. to 6:00 p.m., daily, on the south side of St. John's Road, between Runnymede Road and Gilmour Avenue.
TE6.57adopted
Parking Amendments - Carlaw Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision. Transportation Services is recommending the rescission of the short-term parking area in the vicinity of Our Happiness Day Care at 801 Carlaw Avenue. This will add three parking spaces on east side of Carlaw Avenue about 22 metres north Danforth Avenue. During the course of the investigation, it was noted that there is a discrepancy between posted signs and the existing permit parking regulations. Recommendations 3 to 5 will correct this inconsistency.
The Toronto and East York Community Council: 1. Rescinded the existing parking for a maximum period of 15 minutes, in effect from 7:00 a.m. to 9:00 a.m., from 11:30 a.m. to 1:00 p.m. and from 3:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the east side of Carlaw Avenue from a point 22 metres north of Danforth Avenue and a point 16 metres further north. 2. Rescinded the existing parking prohibition in effect from 9:00 a.m. to 11:30 a.m., from 1:00 p.m. to 3:00 p.m., from 6:00 p.m. of one day to 7:00 a.m. of the next following day, Monday to Friday, and anytime, Saturday, Sunday and public holidays, on the east side of Carlaw Avenue from a point 22 metres north of Danforth Avenue and a point 16 metres further north. 3. Authorized permit parking to be in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking the first day to the 15th day of each month, from April 1 to November 30, inclusive on the even (west) side of Carlaw Avenue from Danforth Avenue to a point 43.7 metres north of Fulton Avenue. 4. Amended the existing maximum one (1) hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, 1st day to the 15th day of each month, from April 1 to November 30, inclusive on the east side of Carlaw Avenue, between Danforth Avenue a point 86 metres north of Cruikshank Avenue (north intersection) to be in effect from a point 22 metres north of Danforth Avenue and a point 86 metres north of Cruikshank Avenue (north intersection). 5. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking 16th day to the last day of each month, inclusive, from Apr. 1 to Nov. 30, inclusive and no parking anytime from Dec. 1 of one year to Mar. 31 of the next following year, inclusive on the odd (east) side of Carlaw Avenue from Danforth Avenue to a point 86 metres north of the easterly leg of Cruikshank Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing parking for a maximum period of 15 minutes, in effect from 7:00 a.m. to 9:00 a.m., from 11:30 a.m. to 1:00 p.m. and from 3:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the east side of Carlaw Avenue from a point 22 metres north of Danforth Avenue and a point 16 metres further north. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect from 9:00 a.m. to 11:30 a.m., from 1:00 p.m. to 3:00 p.m., from 6:00 p.m. of one day to 7:00 a.m. of the next following day, Monday to Friday, and anytime, Saturday, Sunday and public holidays, on the east side of Carlaw Avenue from a point 22 metres north of Danforth Avenue and a point 16 metres further north. 3. Toronto and East York Community Council authorise permit parking to be in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking the first day to the 15th day of each month, from April 1 to November 30, inclusive on the even (west) side of Carlaw Avenue from Danforth Avenue to a point 43.7 metres north of Fulton Avenue. 4. Toronto and East York Community Council amend the existing maximum 1 hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, 1st day to the 15th day of each month, from April 1 to November 30, inclusive on the east side of Carlaw Avenue, between Danforth Avenue a point 86 metres north of Cruikshank Avenue (north intersection) to be in effect from a point 22 metres north of Danforth Avenue and a point 86 metres north of Cruikshank Avenue (north intersection). 5. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking 16th day to the last day of each month, inclusive, from Apr. 1 to Nov. 30, inclusive and no parking anytime from Dec. 1 of one year to Mar. 31 of the next following year, inclusive on the odd (east) side of Carlaw Avenue from Danforth Avenue to a point 86 metres north of the easterly leg of Cruikshank Avenue.
TE6.58adopted
Parking Amendments - Muriel Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to affix parking to the west side of Muriel Avenue, between Selkirk Street and Gertrude Place, in place of the existing alternate side parking arrangement. This is in response to a petition, received from the Ward Councillor's office, signed by the residents of Muriel Avenue, requesting the discontinuation of the alternate-side parking on this section of Muriel Avenue.
The Toronto and East York Community Council: 1. Rescinded the existing permit parking regulation in effect from 12:00 midnight to 11:00 a.m. and from 4:00 p.m. to 7:00 p.m. Monday to Friday, and from 12:01 a.m. to 10:00 a.m. Saturday and Sunday, at all times; except no parking 16th day to the last day of each month, from April 1 to November 30, inclusive, on the odd (east) side of Muriel Avenue, from 33.5 metres north of Gertrude Place to Selkirk Street. 2. Rescinded the existing permit parking regulation in effect from 12:00 midnight to 11:00 a.m. and from 4:00 p.m. to 7:00 p.m. Monday to Friday, and from 12:01 a.m. to 10:00 a.m. Saturday and Sunday, at all times; except no parking from first day to the 15th day of each month, from April 1 to November 30, inclusive, on the even (west) side of Muriel Avenue, from 33.5 metres north of Gertrude Place to Selkirk Street. 3. Authorized permit parking to be in effect from 12:01 a.m. to 11:00 a.m. and from 4:00 p.m. to 7:00 p.m. Monday to Friday and from 12:01 a.m. to 10:00 a.m. Saturday and Sunday, on the even (west) side of Muriel Avenue, from Selkirk Street to Gertrude Place. 4. Amended the existing parking prohibition in effect from the 16th day to the last day of each month, from April 1 to November 30, inclusive, on the east side of Muriel Avenue, between Gertrude Place and a point 57.76 metres north of Selkirk Street, to be in effect between Selkirk Street and a point 57.76 metres north. 5. Prohibited parking at all times on the east side of Muriel Avenue, between Selkirk Street and Gertrude Place. 6. Rescinded the existing parking prohibition in effect from the first day to the 15th day of each month, from April 1 to November 30, inclusive, on the west side of Muriel Avenue, between Gertrude Place and a point 57.8 metres north of Selkirk Street. 7. Rescinded the existing parking prohibition in effect at all times, from December 1 of one year to March 31 of the next following year, inclusive, on the west side of Muriel Avenue, between Gertrude Place and Selkirk Street.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:00 midnight to 11:00 a.m. and from 4:00 p.m. to 7:00 p.m. Monday to Friday, and from 12:01 a.m. to 10:00 a.m. Saturday and Sunday, at all times; except no parking 16th day to the last day of each month, from April 1 to November 30, inclusive, on the odd (east) side of Muriel Avenue, from 33.5 metres north of Gertrude Place to Selkirk Street. 2. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:00 midnight to 11:00 a.m. and from 4:00 p.m. to 7:00 p.m. Monday to Friday, and from 12:01 a.m. to 10:00 a.m. Saturday and Sunday, at all times; except no parking from first day to the 15th day of each month, from April 1 to November 30, inclusive, on the even (west) side of Muriel Avenue, from 33.5 metres north of Gertrude Place to Selkirk Street. 3. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 11:00 a.m. and from 4:00 p.m. to 7:00 p.m. Monday to Friday and from 12:01 a.m. to 10:00 a.m. Saturday and Sunday, on the even (west) side of Muriel Avenue, from Selkirk Street to Gertrude Place. 4. Toronto and East York Community Council amend the existing parking prohibition in effect from the 16th day to the last day of each month, from April 1 to November 30, inclusive, on the east side of Muriel Avenue, between Gertrude Place and a point 57.76 metres north of Selkirk Street, to be in effect between Selkirk Street and a point 57.76 metres north. 5. Toronto and East York Community Council prohibit parking at all times on the east side of Muriel Avenue, between Selkirk Street and Gertrude Place. 6. Toronto and East York Community Council rescind the existing parking prohibition in effect from the first day to the 15th day of each month, from April 1 to November 30, inclusive, on the west side of Muriel Avenue, between Gertrude Place and a point 57.8 metres north of Selkirk Street. 7. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, from December 1 of one year to March 31 of the next following year, inclusive, on the west side of Muriel Avenue, between Gertrude Place and Selkirk Street.
TE6.59adopted
Parking Amendments - Cedarvale Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the approval of parking for a maximum period of one hour, from 10:00 a.m. to 6:00 p.m., daily on the west side of Cedarvale Avenue, between Milverton Boulevard and Strathmore Boulevard. The proposed amendment will discourage long-term daytime parking and increase parking turnover at this section of Cedarvale Avenue. During the course of the investigation, it was noted that there is a discrepancy between posted signs and the existing parking regulations. Recommendation 2 will correct this inconsistency.
The Toronto and East York Community Council: 1. Authorized parking for a maximum period of one hour from 10:00 a.m. to 6:00 p.m., daily, on the west side of Cedarvale Avenue, between Milverton Boulevard and Strathmore Boulevard. 2. Rescinded the existing parking prohibition in effect from 8:00 a.m. to 5:00 p.m. Monday to Friday, except public holidays on the west side of Cedarvale Avenue, between a point 15 metres north of Strathmore Boulevard and a point 30 metres north of Strathmore Boulevard.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize parking for a maximum period of one hour from 10:00 a.m. to 6:00 p.m., daily, on the west side of Cedarvale Avenue, between Milverton Boulevard and Strathmore Boulevard. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect from 8:00 a.m. to 5:00 p.m. Monday to Friday, except public holidays on the west side of Cedarvale Avenue, between a point 15 metres north of Strathmore Boulevard and a point 30 metres north of Strathmore Boulevard.
TE6.60adopted
Realignment of Permit Parking Area 4I to Exclude the Development Located at 109-127 Strachan Avenue
This staff report concerns a matter for which the Community Council has delegated authority to make the final decision. The purpose of this report is to respond to Toronto and East York Community Council's direction to review and report back on the realignment of Permit Parking Area 4I to exclude the development located at 109-127 Strachan Avenue. Staff have determined the realignment of the Permit Parking Area 4I is feasible and has no objections to excluding the development located at 109-127 Strachan Avenue. If Toronto and East York Community Council excludes this address from the subject Permit Parking Area, residents and visitors of this address will be prohibited from participating in the on-street permit parking program.
The Toronto and East York Community Council: 1. Approved the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area 4I, as shown in Attachment 1 to the report (June 6, 2023) from the Director, Permits and Enforcement, Transportation Services, excluding the development currently located at 109-127 Strachan Avenue.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council approve the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "4I", as shown in Attachment 1 of the report dated June 6, 2023 from the Director, Permits and Enforcement, Transportation Services, excluding the development currently located at 109-127 Strachan Avenue.
TE6.61adopted
Temporary Adjustments to Parking Regulations for 2023 Canadian National Exhibition (Delegated)
This staff report concerns a matter for which the Community Council has delegated authority from City Council to make a final decision. The temporary parking amendments recommended are required to enhance traffic operations and pedestrian safety during this year's Canadian National Exhibition (CNE), which takes place from August 18 to September 4, 2023, inclusive. A companion report, "Temporary Adjustments to Traffic and Parking Regulations for 2023 Canadian National Exhibition (Non-Delegated)", dated June 6, 2023, outlines the required non-delegated temporary traffic and parking amendments for locations with Toronto Transit Commission (TTC) service.
The Toronto and East York Community Council: 1. Authorized the temporary parking regulations on streets in the vicinity of Exhibition Place that are impacted during the Canadian National Exhibition identified in Attachment 1 to the report (June 6, 2023) from the Director, Transportation Services, Toronto and East York District; the temporary parking regulations will override all existing regulations for the duration of this event (August 18, 2023 to September 4, 2023).
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the temporary parking regulations on streets in the vicinity of Exhibition Place that are impacted during the CNE, identified in Attachment 1 attached to the report "Temporary Adjustment to Parking Regulations for 2023 Canadian National Exhibition (Delegated)", dated June 6, 2023, from the Director, Transportation Services, Toronto and East York District. The temporary parking regulations will override all existing regulations for the duration of this event (August 18, 2023 to September 4, 2023).
TE6.62adopted
The purpose of this report is to seek City Council's authority to enact temporary traffic and parking amendments required to enhance traffic operations and pedestrian safety during the annual Canadian National Exhibition (CNE), which takes place from August 18 to September 4, 2023, inclusive. As this staff report concerns roadways with regular Toronto Transit Commission (TTC) service, City Council approval is required. A companion report, "Temporary Adjustments to Parking Regulations for 2023 Canadian National Exhibition (Delegated)", dated June 6, 2023, outlines the required delegated temporary parking amendments for locations without TTC service.
The Toronto and East York Community recommends that: 1. City Council authorize the temporary traffic and parking regulations on streets in the vicinity of Exhibition Place that are impacted during the Canadian National Exhibition identified in Attachment 1 to the report (June 6, 2023) from the Director, Transportation Services, Toronto and East York District; the temporary parking regulations will override all existing regulations for the duration of this event (August 18, 2023 to September 4, 2023).
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the temporary traffic and parking regulations on streets in the vicinity of Exhibition Place that are impacted during the Canadian National Exhibition, identified in Attachment 1 attached to the report "Temporary Adjustments to Traffic and Parking Regulations for 2023 Canadian National Exhibition (Non-Delegated)", dated June 6, 2023 from the Director, Transportation Services, Toronto and East York District. The temporary parking regulations will override all existing regulations for the duration of this event (August 18, 2023 to September 4, 2023).
TE6.63amended
Traffic Control Signals - Main Street
As the Toronto Transit Commission (TTC) operates a transit service on Main Street, City Council approval of this report is required. Transportation Services is requesting approval to install pedestrian traffic control signals on Main Street, north of Danforth Avenue, adjacent to the Main Street transit station. The proposed traffic control signals will operate as intersection pedestrian signals (IPS). As IPS installations are generally not supported in the City of Toronto under the current policy, this installation will be considered as part of an existing pilot of these controls. The proposed traffic control signals are intended to facilitate safe pedestrian crossings to and from the Main Street transit station.
The Toronto and East York Community Council recommends that: 1. City Council authorize the installation of a pedestrian crossover on Main Street at a point approximately 68 metres north of Danforth Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the installation of traffic control signals on Main Street at a point approximately 68 metres north of Danforth Avenue.
TE6.64adopted
This report outlines the parking by-law amendment required to implement the parking area for one (1) of the EV charging station locations, on Fulton Avenue, for the roll out of two (2) EV charging stations for which this Community Council has delegated authority from City Council to make a final decision. This location has been reviewed and supported by the local Councillor. The report, "On-Street Electric Vehicle Charging Stations (Various Locations) - Parking Amendments (Non-Delegated Locations)," has been submitted to the June 22, 2023 meeting of Toronto and East York Community Council to designate the required non-delegated parking by-law amendments for the remaining eighteen (18) locations and thirty-four (34) additional EV charging stations.
The Toronto and East York Community Council: 1. Designated on-street electric vehicle charging station parking areas on Fulton Avenue, on the south side, from a point 30.7 metres west of Jackman Avenue and a point 12 metres further west (2 spaces), for the exclusive use of electric vehicles and amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, as described in Attachment 2 to the report (June 6, 2023) from the Director, Policy and Innovation, Transportation Services.
Staff recommendation as filed
The Director, Policy and Innovation recommends that: 1. Toronto and East York Community Council designate on-street electric vehicle charging station parking areas on Fulton Avenue, on the south side, from a point 30.7 metres west of Jackman Avenue and a point 12 metres further west (2 spaces), for the exclusive use of electric vehicles and amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, as described in Attachment 2 of this report (June 6, 2023).
TE6.65adopted
This report outlines the parking by-law amendments required to implement the parking areas for eighteen (18) EV charging station locations, for the roll out of thirty-four (34) charging stations. These locations have been reviewed and supported by the local Councillors. As the Toronto Transit Commission (TTC) operates a transit service on the highways mentioned in this report, City Council approval of this report is required. The report, "On-Street Electric Vehicle Charging Stations on Fulton Avenue - Parking Amendment (Delegated Location)," has been submitted to the June 22, 2023 meeting of Toronto and East York Community Council to designate the required delegated parking by-law amendment for the Fulton Avenue location to implement two (2) EV charging stations.
The Toronto and East York Community Council recommends that: 1. City Council designate on-street electric vehicle charging station parking areas at the following locations: a. Carlaw Street, west side, from a point 30.8 metres south of Colgate Avenue, and 12 metres further south (2 spaces); b. Christie Street, east side, from a point 26.4 metres north of Epworth Manse Lane and a point 12 metres further north (2 spaces); c. Dundas Street East, south side, from a point 31.6 metres east of Billings Avenue and a point 12 metres further east (2 spaces); d. Dundas Street West, west side, from a point 117.6 metres south of Bloor Street West and a point 12 metres further south (2 spaces); e. Dundas Street West, west side, from a point 186 metres south of Bloor Street West and 12 metres further south (2 spaces); f. Gerrard Street East, south side, from a point 21.2 metres east of Redwood Avenue and a point 12 metres further east (2 spaces); g. Gerrard Street East, south side, from a point 52.3 metres east of Main Street and a point 12 metres further east(2 spaces); h. Gerrard Street East, south side, from a point 61 metres east of Pape Avenue and a point 12 metres further east (2 spaces); i. Gerrard Street East, south side, from a point 42.3 metres east of Kimberly Avenue and a point 6 metres further east (1 space); j. King Street West, north side, from a point 31.4 metres east of Gwynne Avenue and a point 12 metres further east (2 spaces); k. Kingston Road, north side, from a point 51.2 metres east of Pickering Street and a point 12 metres further east (2 spaces); l. Ossington Avenue, east side, from a point 23.1 metres north of Baden Street and a point 12 metres further north (2 spaces); m. Queen Street East, north side, from a point 19.8 metres west of Brookmount Road and a point 12 metres further west (2 spaces); n. Queen Street East, south, from a point 24.5 metres east of Waverley Road and a point 6 metres further east (1 space); o. Queen Street East, north side from a point 25.8 metres east of Craven Road, and a point 12 metres further west (2 spaces); p. Queen Street West, south side, from a point 44.9 metres east of Fennings Street and a point 12 metres further east (2 spaces); q. Queen Street East, south side, from a point 36.4 metres east of Glen Manor Drive and a point 12 metres further east (2 spaces); and r. Roncesvalles Avenue, west side, from a point 43.5 metres south of Hewitt Avenue and a point 12 metres further south (2 spaces); for the exclusive use of electric vehicles and amend City of Toronto Municipal Code, Chapter 910, Parking Machines and Meters, and Chapter 950, Traffic and Parking, as described in Attachment 2 to the report (June 6, 2023) from the Director, Policy and Innovation, Transportation Services.
Staff recommendation as filed
The Director, Policy and Innovation recommends that: 1. City Council designate on-street electric vehicle charging station parking areas at the following locations: a. Carlaw Street, west side, from a point 30.8 metres south of Colgate Avenue, and 12 metres further south (2 spaces); b. Christie Street, east side, from a point 26.4 metres north of Epworth Manse Lane and a point 12 metres further north (2 spaces); c. Dundas Street East, south side, from a point 31.6 metres east of Billings Avenue and a point 12 metres further east (2 spaces); d. Dundas Street West, west side, from a point 117.6 metres south of Bloor Street West and a point 12 metres further south (2 spaces); e. Dundas Street West, west side, from a point 186 metres south of Bloor Street West and 12 metres further south (2 spaces); f. Gerrard Street East, south side, from a point 21.2 metres east of Redwood Avenue and a point 12 metres further east (2 spaces); g. Gerrard Street East, south side, from a point 52.3 metres east of Main Street and a point 12 metres further east(2 spaces); h. Gerrard Street East, south side, from a point 61 metres east of Pape Avenue and a point 12 metres further east (2 spaces); i. Gerrard Street East, south side, from a point 42.3 metres east of Kimberly Avenue and a point 6 metres further east (1 space); j. King Street West, north side, from a point 31.4 metres east of Gwynne Avenue and a point 12 metres further east (2 spaces); k. Kingston Road, north side, from a point 51.2 metres east of Pickering Street and a point 12 metres further east (2 spaces); l. Ossington Avenue, east side, from a point 23.1 metres north of Baden Street and a point 12 metres further north (2 spaces); m. Queen Street East, north side, from a point 19.8 metres west of Brookmount Road and a point 12 metres further west (2 spaces); n. Queen Street East, south, from a point 24.5 metres east of Waverley Road and a point 6 metres further east (1 space); o. Queen Street East, north side from a point 25.8 metres east of Craven Road, and a point 12 metres further west (2 spaces); p. Queen Street West, south side, from a point 44.9 metres east of Fennings Street and a point 12 metres further east (2 spaces); q. Queen Street East, south side, from a point 36.4 metres east of Glen Manor Drive and a point 12 metres further east (2 spaces); and r. Roncesvalles Avenue, west side, from a point 43.5 metres south of Hewitt Avenue and a point 12 metres further south (2 spaces), for the exclusive use of electric vehicles and amend City of Toronto Municipal Code Chapters 910, Parking Machines and Meters and Chapter 950, Traffic and Parking, as described in Attachment 2 of this report (June 6, 2023).
TE6.66amended
Use of Nathan Phillips Square for Various Events - September 1, 2023 - April 30, 2024
The purpose of this report is to request exemptions from the Toronto Municipal Code Chapter 636 "Public Squares" and former City of Toronto Municipal Code Chapter 237 "Nathan Phillips Square" for events that are proposed to be held on Nathan Phillips Square from September 1, 2023 - April 30, 2024.
The Toronto and East York Community Council recommends that: 1. City Council grant permission to the Canadian Association of Chinese Performing Arts, Toronto Vegetarian Association/VegTO, Second Harvest Canada, Mexican Day Toronto, City Cultural Events Production, City of Toronto, Canadian Cancer Society, JDRF, Canadian Running Series, Myeloma Canada, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, to operate a beer and wine (VQA) garden and to serve alcohol contingent upon the following conditions: a. approval of the Alcohol and Gaming Commission of Ontario; b. approval of the Medical Officer of Health; c. compliance with the City of Toronto's Municipal Alcohol Policy; and d. receipt of all the necessary permits associated with the production of the event i.e. building permits, noise by-law extension permit. 2. City Council grant permission to the Canadian Association of Chinese Performing Arts, Toronto Vegetarian Association/VegTO, Second Harvest Canada, Strategic Partnership, City Manager's Office, City of Toronto, The Gatehouse, Mexican Day Toronto, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, JDRF, Canadian Running Series, Myeloma Canada, Strategic Protocol and External Relations, City of Toronto, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, Fast in the 6 Inc., Vietnamese Association Toronto, Turkish Society of Canada, Ontario Sikhs and Gurdwara Council to solicit donations in support of their organizations. 3. City Council grant permission to the Canadian Association of Chinese Performing Arts, Second Harvest Canada, Strategic Partnership, City Manager's Office, City of Toronto, The Gatehouse, Mexican Day Toronto, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, JDRF, Canadian Running Series, Myeloma Canada, Maple Leaf Sports and Entertainment, The Ontario Snow Resorts Association, Celebrate Toronto, Turkish Society of Canada, Ontario Sikhs and Gurdwara Council to engage in sports demonstrations. 4. City Council grant permission to the Canadian Association of Chinese Performing Arts, Toronto Vegetarian Association/VegTO, Second Harvest Canada, Strategic Partnership, City Manager's Office, City of Toronto, The Gatehouse, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, JDRF, Global Arts Cultural And Heritage Foundation, Strategic Protocol and External Relations, City of Toronto, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, Fast in the 6 Inc., Vietnamese Association Toronto for sound amplification outside of Nathan Phillips Square amplification schedule policy. 5. City Council grant permission to the Canadian Association of Chinese Performing Arts, Toronto Vegetarian Association/VegTO, Strategic Partnership, City Manager's Office, City of Toronto, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, JDRF, Myeloma Canada, Global Arts Cultural and Heritage Foundation, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, to use open flame as part of their event production. 6. City Council grant permission to City Cultural Events, City of Toronto, Global Arts and Heritage Foundation, Celebrate Toronto, Fast in the 6 Inc. to use special effects pyrotechnics as part of their event production. 7. City Council grant permission to the Canadian Association of Chinese Performing Arts, Toronto Vegetarian Association/VegTO, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, to place objects in the pool. 8. City Council grant permission to Myeloma Canada to rappel from the east/west towers. 9. City Council require that the various events compensate the City of Toronto, through the Corporate Real Estate Management Division, for all the City of Toronto costs associated with an event above the standard staffing compliment.
Staff recommendation as filed
General Manager, Economic Development and Culture recommends that: 1. City Council grant permission to the Canadian Association of Chinese Performing Arts (CACPA), Toronto Vegetarian Association/VegTO, Second Harvest Canada, Mexican Day Toronto, City Cultural Events Production, City of Toronto, Canadian Cancer Society, JDRF, Canadian Running Series, Myeloma Canada, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, to operate a beer and wine (VQA) garden and to serve alcohol contingent upon the following conditions: · Approval of the A.G.C.O. · Approval of the Medical Officer of Health · Compliance with the City of Toronto's Municipal Alcohol Policy · Receipt of all the necessary permits associated with the production of the event i.e. building permits, noise by-law extension permit 2. City Council grant permission to the Canadian Association of Chinese Performing Arts (CACPA), Toronto Vegetarian Association/VegTO, Second Harvest Canada, Strategic Partnership, City Manager's Office, City of Toronto, The Gatehouse, Mexican Day Toronto, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, JDRF, Canadian Running Series, Myeloma Canada, Strategic Protocol & External Relations, City of Toronto, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, Fast in the 6 Inc., Vietnamese Association Toronto, Turkish Society of Canada, Ontario Sikhs and Gurdwara Council to solicit donations in support of their organizations. 3. City Council grant permission to the Canadian Association of Chinese Performing Arts, Second Harvest Canada, Strategic Partnership, City Manager's Office, City of Toronto, The Gatehouse, Mexican Day Toronto, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, JDRF, Canadian Running Series, Myeloma Canada, Maple Leaf Sports and Entertainment, The Ontario Snow Resorts Association, Celebrate Toronto, Turkish Society of Canada, Ontario Sikhs and Gurdwara Council to engage in sports demonstrations. 4. City Council grant permission to the Canadian Association of Chinese Performing Arts (CACPA), Toronto Vegetarian Association/VegTO, Second Harvest Canada, Strategic Partnership, City Manager's Office, City of Toronto, The Gatehouse, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, JDRF, Global Arts Cultural And Heritage Foundation, Strategic Protocol and External Relations, City of Toronto, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, Fast in the 6 Inc., Vietnamese Association Toronto for sound amplification outside of Nathan Phillips Square amplification schedule policy. 5. City Council grant permission to the Canadian Association of Chinese Performing Arts (CACPA), Toronto Vegetarian Association/VegTO, Strategic Partnership, City Manager's Office, City of Toronto, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, JDRF, Myeloma Canada, Global Arts Cultural and Heritage Foundation, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, Celebrate Toronto, to use open flame as part of their event production. 6. City Council grant permission to City Cultural Events, City of Toronto, Global Arts and Heritage Foundation, Celebrate Toronto, Fast in the 6 Inc. to use special effects pyrotechnics as part of their event production. 7. City Council grant permission to the Canadian Association of Chinese Performing Arts (CACPA), Toronto Vegetarian Association/VegTO, City Cultural Events, City of Toronto, Toronto Council Fire Native Cultural Centre, Canadian Cancer Society, Maple Leaf Sports and Entertainment Foundation, The Ontario Snow Resorts Association, to place objects in the pool. 8. City Council grant permission to City Cultural Events, City of Toronto, to cover City Hall windows and buildings. 9. City Council grant permission to Myeloma Canada to rappel from the east/west towers. 10. City Council require that the various events compensate the City of Toronto, through the Corporate Real Estate Management Division, for all the City of Toronto costs associated with an event above the standard staffing compliment.
TE6.67adopted
Appointment of Public Members to the Toronto and East York Community Preservation Panel
This report recommends the appointment of 13 public members to the Toronto and East York Community Preservation Panel.
The Toronto and East York Community Council recommends that: 1. City Council appoint the following candidates to the Toronto and East York Community Preservation Panel for a term of office ending April 25, 2026 and until successors are appointed: Tristian Armesto Leslie Barnes Pancheta Barnett Carrie Chisholm Jane Clark Tura Cousins Wilson Jonathan Grimm Liam Hancock Ed Jackson Micheline McKay Patricia Milne Brenton Nader Adam Wynne 2. City Council direct that the balance of Confidential Attachment 1 to the report (June 5, 2023) from the Senior Manager, Heritage Planning, Urban Design, City Planning remain confidential as it relates to personal matters about identifiable individuals being considered for appointment to the Toronto and East York Community Preservation Panel.
Staff recommendation as filed
The Senior Manager, Heritage Planning, Urban Design, City Planning recommends that: 1. City Council appoint the following candidates to the Toronto and East York Community Preservation Panel for a term of office ending April 25, 2026 and until successors are appointed: Tristian Armesto Leslie Barnes Pancheta Barnett Carrie Chisholm Jane Clark Tura Cousins Wilson Jonathan Grimm Liam Hancock Ed Jackson Micheline McKay Patricia Milne Brenton Nader Adam Wynne 2. City Council direct that the confidential information contained in Confidential Attachment 1 remain confidential as it relates to personal matters about identifiable individuals being considered for appointment to the Toronto and East York Community Preservation Panel.
TE6.68adopted
Appointments to the Board of Management of the Swansea Town Hall Community Centre
The Board confirms that each of these nominees is qualified to serve under the provisions of the City of Toronto's Public Appointments Policy and the Relationship Framework for Community Centre Boards of Management. Rob Hamilton is a reappointment. The other four recommended appointees are replacing: - Jamie Anderson, term ending May 19, 2023. - Kosta Roumanis, term ending May 19, 2023. - Phil Vlach, term ending May 19, 2023. - Brian O'Rourke, term ending May 19, 2023.
The Toronto and East York Community Council: 1. Appointed the following individuals to the Swansea Town Hall Board of Management, at pleasure of Council, for a term of office ending May 31, 2025 and until their successors are appointed: Rob Hamilton Manfred Netzel Rajesh Gokhale Andrea Hazard Michael Peddle
Staff recommendation as filed
1. The Swansea Town Hall Board of Management recommends the following individuals for appointment to the Board, at pleasure of Council, for the terms of office noted below and until their successors are appointed: - Rob Hamilton, for a term of office ending May 31, 2025. - Manfred Netzel, for a term of office ending May 31, 2025. - Rajesh Gokhale, for a term of office ending May 31, 2025. - Andrea Hazard, for a term of office ending May 31, 2025. - Michael Peddle, for a term of office ending May 31, 2025.
TE6.69amended
Appointment of Public Members to the McCormick Playground Arena Board
This report recommends six candidates for appointment to the McCormick Playground Arena Board.
The Toronto and East York Community Council recommends that: 1. City Council temporarily amend the composition of the McCormick Playground Arena Board by adding two additional public members to serve, at pleasure of Council, for a term of office ending April 21, 2025 or until such time as their successors are appointed. 2. City Council appoint Monica Reddon to fill one temporary position on the McCormick Playground Arena Board in Part 1 above, at pleasure of Council, for a term of office ending April 21, 2025 or until such time as their successor is appointed. 3. City Council waive the two-term limit provision of the Public Appointments Policy and appoint Luis Silva to fill one temporary position on the McCormick Playground Arena Board in Part 1 above, at pleasure of Council, for a term of office ending April 21, 2025 or until such time as their successor is appointed.
Staff recommendation as filed
The City Clerk recommends that: 1. Toronto and East York Community Council appoint the following candidates to the McCormick Playground Arena Board, at pleasure of Council, for a term of office ending on June 22, 2027, and until successors are appointed: · Cory Cook · Heather Cunningham · Violeta Dunning · Moussa Ferzoli · Hudson Manning · Paul Romain
TE6.70adopted
Appointments to the Board of Management of the Waterfront Neighbourhood Centre
The Board confirms that each of these nominees is qualified to serve under the provisions of the City of Toronto's Public Appointments Policy and the Relationship Framework for Community Centre Boards of Management. On behalf of the Board, I respectfully request that the City take the necessary steps to appoint these nominated candidates. The Board also wishes to confirm that the following members, previously appointed by Community Council, continue to serve on the Board for the terms of office noted below and until successors are appointed: • Barbara McKenney, resigned effective March 9th, 2023.
The Toronto and East York Community Council: 1. Appointed the following individual to the Waterfront Neighbourhood Centre Board of Management, at pleasure of Council, for a term of office ending June 22, 2027, and until a successor is appointed: Paula Mastrilli
Staff recommendation as filed
1. The Waterfront Neighbourhood Centre Board of Management wishes to nominate the following individual for appointment to the Board, at pleasure of Council, for the terms of office noted below and until successors are appointed: - Paula Mastrilli for a term of office ending June 22, 2027
TE6.71adopted
Appointment of Public Members to the William H. (Bill) Bolton Arena Board
This report recommends the appointment of five public members to the William H. (Bill) Bolton Arena Board.
The Toronto and East York Community Council: 1. Appointed the following candidates to the William H. (Bill) Bolton Arena Board, at pleasure of Council, for a term of office ending on June 22, 2027, and until successors are appointed: Richard Bornet Seema Chhabra James Lam Allison Norman Caralyn Quan
Staff recommendation as filed
The City Clerk recommends that: 1. Toronto and East York Community Council appoint the following five candidates to the William H. (Bill) Bolton Arena Board, at pleasure of Council, for a term of office ending on June 22, 2027, and until successors are appointed: · Richard Bornet · Seema Chhabra · James Lam · Allison Norman · Caralyn Quan
TE6.72amended
Parking Amendments - Front Street East
Earlier this year, my office undertook a comprehensive review of parking regulations in collaboration with the community. Through this participatory process, it was revealed that members of the community have expressed a strong desire for the implementation of parking regulation changes along this section of Front Street.
The Toronto and East York Community Council: 1. Prohibited standing at all times on the south side of Front Street East, between George Street South and a point 30.5 metres east. 2. Prohibited standing at all times on the north side of Front Street East, between George Street and a point 30.5 metres east. 3. Rescinded the existing parking machines on the south side of Front Street East, between Lower Jarvis Street and Lower Sherbourne Street, in effect from 8:00 a.m. to 4:00 p.m., 6:00 p.m. to 9:00 p.m., Monday to Friday; from 8:00 a.m. to 9:00 p.m., Saturday; and from 1:00 p.m. to 9:00 p.m., Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 4. Authorized the installation of parking machines on the south side of Front Street East, between Lower Jarvis Street and George Street South, to be in effect from 8:00 a.m. to 4:00 p.m., and from 6:00 p.m. to 9:00 p.m., Monday to Friday; from 8:00 a.m. to 9:00 p.m., Saturday; and from 1:00 p.m. to 9:00 p.m., Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 5. Authorized the installation of parking machines on the south side of Front Street East, between a point 30.5 metres east of George Street South and Lower Sherbourne Street, to be in effect from 8:00 a.m. to 4:00 p.m., and from 6:00 p.m. to 9:00 p.m., Monday to Friday; from 8:00 a.m. to 9:00 p.m., Saturday; and from 1:00 p.m. to 9:00 p.m., Sunday, for a maximum period of three hours and at a rate of $3.00 per hour.
Staff recommendation as filed
Councillor Moise recommends that: 1. Toronto and East York Community Council prohibit standing at all times on the south side of Front Street East, between George Street South and a point 30.5 metres east. 2. Toronto and East York Community Council rescind the existing parking machines on the south side of Front Street East, between Lower Jarvis Street and Lower Sherbourne Street, in effect from 8:00 a.m. to 4:00 p.m., 6:00 p.m. to 9:00 p.m., Monday to Friday; from 8:00 a.m. to 9:00 p.m., Saturday; and from 1:00 p.m. to 9:00 p.m., Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 3. Toronto and East York Community Council authorize the installation of parking machines on the south side of Front Street East, between Lower Jarvis Street and George Street South, to be in effect from 8:00 a.m. to 4:00 p.m., and from 6:00 p.m. to 9:00 p.m., Monday to Friday; from 8:00 a.m. to 9:00 p.m., Saturday; and from 1:00 p.m. to 9:00 p.m., Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 4. Toronto and East York Community Council authorize the installation of parking machines on the south side of Front Street East, between a point 30.5 metres east of George Street South and Lower Sherbourne Street, to be in effect from 8:00 a.m. to 4:00 p.m., and from 6:00 p.m. to 9:00 p.m., Monday to Friday; from 8:00 a.m. to 9:00 p.m., Saturday; and from 1:00 p.m. to 9:00 p.m., Sunday, for a maximum period of three hours and at a rate of $3.00 per hour.
TE6.73adopted
Parking Amendments - Gloucester Street
Earlier this year, my office undertook a comprehensive review of parking regulations in collaboration with the community. Through this participatory process, it was revealed that members of the community have expressed a strong desire for the implementation of parking regulation changes along this section of Gloucester Street.
The Toronto and East York Community Council: 1. Rescinded the standing prohibition in effect at all times on the north side of Gloucester Street, between a point 90 metres east of Church Street and a point 7 metres further east. 2. Rescinded the existing parking machines on the north side of Gloucester Street, between a point 66 metres east of Church Street and a point 24 metres further east, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 3. Rescinded the existing parking machines on the north side of Gloucester Street, between a point 75 metres west of Jarvis Street and a point 97 metres east of Church Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 4. Authorized the installation of parking machines on the north side of Gloucester Street, between a point 66 metres east of Church Street and a point 75 metres west of Jarvis Street, to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 5. Rescinded the existing permit parking in effect from 10:00 p.m. to 7:00 a.m. at all times, except no parking anytime from a point 55 metres east of Church Street to a point 11 metres further east; from a point 90 metres east of Church Street to a point 7 metres further east, and from a point 69 metres west of Jarvis Street to a point 6 metres further west, on the even (north) side of Gloucester Street, from Jarvis Street to Church Street. 6. Authorized permit parking to be in effect from 10:00 p.m. to 7:00 a.m., at all times, except no parking anytime from a point 55 metres east of Church Street to a point 11 metres further east; and no standing anytime from a point 69 metres west of Jarvis Street to a point 6 metres further west, on the even (north) side of Gloucester Street, from Jarvis Street to Church Street.
Staff recommendation as filed
Councillor Moise recommends that: 1. Toronto and East York Community Council rescind the standing prohibition in effect at all times on the north side of Gloucester Street, between a point 90 metres east of Church Street and a point 7 metres further east. 2. Toronto and East York Community Council rescind the existing parking machines on the north side of Gloucester Street, between a point 66 metres east of Church Street and a point 24 metres further east, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 3. Toronto and East York Community Council rescind the existing parking machines on the north side of Gloucester Street, between a point 75 metres west of Jarvis Street and a point 97 metres east of Church Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 4. Toronto and East York Community Council authorize the installation of parking machines on the north side of Gloucester Street, between a point 66 metres east of Church Street and a point 75 metres west of Jarvis Street, to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 5. Toronto and East York Community Council rescind the existing permit parking in effect from 10:00 p.m. to 7:00 a.m. at all times, except no parking anytime from a point 55 metres east of Church Street to a point 11 metres further east; from a point 90 metres east of Church Street to a point 7 metres further east, and from a point 69 metres west of Jarvis Street to a point 6 metres further west, on the even (north) side of Gloucester Street, from Jarvis Street to Church Street. 6. Toronto and East York Community Council authorize permit parking to be in effect from 10:00 p.m. to 7:00 a.m., at all times, except no parking anytime from a point 55 metres east of Church Street to a point 11 metres further east; and no standing anytime from a point 69 metres west of Jarvis Street to a point 6 metres further west, on the even (north) side of Gloucester Street, from Jarvis Street to Church Street.
TE6.74adopted
Traffic Control Signals - Carlton Street and Homewood Avenue
Earlier this year, my office undertook a comprehensive review of traffic regulations in collaboration with the community. Through this participatory process, it was revealed that members of the community have expressed a strong desire for the implementation of traffic control signals at the intersection of Homewood Street and Carlton Street. The installation of additional traffic controls at this pedestrian crossing will connect the Garden District by ensuring a continuous path from Homewood Avenue, through Allan Gardens, and down Pembroke Street to Moss Park. This is an important measure for our community's connectivity and safety.
The Toronto and East York Community Council recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Carlton Street and Homewood Avenue.
Staff recommendation as filed
Councillor Moise recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Carlton Street and Homewood Avenue.
TE6.75adopted
Traffic Control Signals - Yonge Street and Grenville Street/Wood Street
Earlier this year, my office undertook a comprehensive review of traffic regulations in collaboration with the community. Through this participatory process, it was revealed that members of the community have expressed a strong desire for the implementation of traffic control signals at the intersection of Yonge Street and Grenville Street/Wood Street.
The Toronto and East York Community Council recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Yonge Street and Grenville Street/Wood Street.
Staff recommendation as filed
Councillor Moise recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Yonge Street and Grenville Street/Wood Street.
TE6.76adopted
Traffic Control Signals - Yonge Street and Maitland Street/Breadalbane Street
Earlier this year, my office undertook a comprehensive review of traffic regulations in collaboration with the community. Through this participatory process, it was revealed that members of the community have expressed a strong desire for the implementation of traffic control signals at the intersection of Yonge Street and Maitland Street/Breadalbane Street.
The Toronto and East York Community Council recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Yonge Street and Maitland Street/Breadalbane Street.
Staff recommendation as filed
Councillor Moise recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Yonge Street and Maitland Street/Breadalbane Street.
TE6.77adopted
All-Way Stop Control at St. Clarens Avenue and Shirley Street
Traffic Operations was requested by Vision Zero to review proposed sidewalk and curb improvements for St. Clarens Avenue and Shirley Street which would provide safe crossing in all directions at the intersection. The intersection is currently uncontrolled, and pedestrians were crossing at their own risk. As a result, an All-Way Stop Control (AWSC) warrant was undertaken to determine if an AWSC could be installed at this intersection. While an AWSC was found not to be warranted, staff determined it would be beneficial to have an AWSC installed here due to the following reasons: -The presence of a nearby school (Shirley Street Junior Public School) which also houses City View Alternative Senior School, an EarlyON Child and Family Centre, and a YMCA Child Care Centre -Providing crossing at the intersection for students and parents/guardians -An opportunity to provide safe crossing in all directions -To mitigate conflicts amongst motorists, cyclists and pedestrians -Network connectivity; this control will provide a route with protected pedestrian crossings that connect to the new signals on Lansdowne Avenue and the West Toronto Railpath
The Toronto and East York Community Council: 1. Authorized an all-way compulsory stop control at the intersection of St. Clarens Avenue and Shirley Street.
Staff recommendation as filed
Councillor Bravo recommends that: 1. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of St. Clarens Avenue and Shirley Street.
TE6.78adopted
Permit Parking Amendments on Campbell Avenue
My office received a petition from residents of Campbell Avenue requesting changes to the permit parking hours on Campbell Avenue between Dupont Street and Antler Street, including a rush hour parking prohibition from 4:00 p.m. to 6:00 p.m. While there was support in favour of this initiative, there is a highly utilized employment building on Campbell Avenue and a concern was raised about customer parking during these hours. As a result, I am recommending that the permit parking hours be implemented on a section of the block instead of the full block. These changes will balance the loading and parking needs of the local businesses in the area, and residents are supportive of this compromise in the changes.
The Toronto and East York Community Council: 1. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, on the even (west) side of Campbell Avenue, from Antler Street to Dupont Street. 2. Authorized permit parking to be in effect from 12:01 a.m. to 7:00 a.m. and from 4:00 p.m. to 6:00 p.m. daily, on the (even) west side of Campbell Avenue, from Antler Street to a point 95 metres north. 3. Authorized permit parking to be in effect from 12:01 a.m. to 7:00 a.m. daily, on the even (west) side of Campbell Avenue, from a point 95 metres north of Antler Street to Dupont Street. 4. Amended the existing maximum 1-hour parking regulation in effect from 9:00 a.m. to 6:00 p.m., Monday to Friday, on the west side of Campbell Avenue, between Antler Street and a point 51 metres south of Dupont Street, to be in effect between a point 51 metres south of Dupont Street and a point 54 metres further south. 5. Authorized parking for a maximum period of 1-hour from 9:00 a.m. to 4:00 p.m., Monday to Friday, on the west side of Campbell Avenue, between Antler Street and a point 95 metres north.
Staff recommendation as filed
Councillor Bravo recommends that: 1. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily, on the even (west) side of Campbell Avenue, from Antler Street to Dupont Street. 2. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 7:00 a.m. and from 4:00 p.m. to 6:00 p.m. daily, on the (even) west side of Campbell Avenue, from Antler Street to a point 95 metres north. 3. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 7:00 a.m. daily, on the even (west) side of Campbell Avenue, from a point 95 metres north of Antler Street to Dupont Street. 4. Toronto and East York Community Council amend the existing maximum 1-hour parking regulation in effect from 9:00 a.m. to 6:00 p.m., Monday to Friday, on the west side of Campbell Avenue, between Antler Street and a point 51 metres south of Dupont Street, to be in effect between a point 51 metres south of Dupont Street and a point 54 metres further south. 5. Toronto and East York Community Council authorize parking for a maximum period of 1-hour from 9:00 a.m. to 4:00 p.m., Monday to Friday, on the west side of Campbell Avenue, between Antler Street and a point 95 metres north.
TE6.79adopted
CaféTO Curb Lane Cafés on Queen Street West
Queen Street West will be undergoing a significant amount of construction and transit modifications due to the Ontario Line project, including hosting potential public transit diversions, over the next several years. As a result, businesses that may be eligible for a curb lane café in 2023 may not be able to install that café in future years. There is also the potential that some operators may not be able to participate for the full duration of the 2023 CaféTO season should there be nearby unexpected construction impacts. To mitigate the impact of these challenges, this motion seeks to assist businesses with the option to install a temporary ramp in 2023 instead of a temporary accessible platform should there be a need to revoke their curb lane café permit due to construction impacts this year.
The Toronto and East York Community Council recommends that: 1. City Council authorize the Executive Director, Municipal Licensing and Standards or General Manager , Transportation Services to exempt curb lane café permit areas on Queen Street West between University Avenue and Bathurst Street from the requirements of § 742-10.4. B(6) and B(7) and § 742-10.4 C(1) and C(3) of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays, to October 15, 2023, but require any affected permit holder to do the following during that period: a. install a temporary ramp in their permit area which provides for safe access to the permit area from the sidewalk in accordance with the requirements of § 742-10.4 C(2).
Staff recommendation as filed
It is recommended that: 1. City Council authorize the Executive Director, Municipal Licensing and Standards or General Manager , Transportation Services to exempt curb lane café permit areas on Queen Street West between University Avenue and Bathurst Street from the requirements of § 742-10.4. B(6) and B(7) and § 742-10.4 C(1) and C(3) of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays, to October 15, 2023, but require any affected permit holder to do the following during that period: a. install a temporary ramp in their permit area which provides for safe access to the permit area from the sidewalk in accordance with the requirements of § 742-10.4 C(2).
TE6.80adopted
Year Round Curb Lane Café Operations on King Street West
City Council, at its meeting of November 26 and 27, 2019 adopted the extension of the approval for year-round operation of parklets and parklet cafés on King Street and Duncan Street until April 14, 2023. The original staff report, King Street Transit Pilot - Outdoor Cafés & Public Installations in the Curb Lane Public Spaces was adopted March 26th and 27th, 2018. Curb lane cafés that were issued permits prior to CaféTO have continued to operate from 2020 to 2023 within the original parklet café requirements and permissions implemented as part of the King Street Transit Pilot in 2018. These requirements pre-date the creation of Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays in 2019 and the guidelines established through the CaféTO program in 2020. Curb lane café operators under the King Street Transit Pilot umbrella were required to pay an application fee and install a temporary accessible platform which they were permitted to keep in place curb lane year-round. Curb lane cafés approved within the King Street Transit Priority Corridor catchment area prior to the implementation of Chapter 742 and the CaféTO Guidelines do not meet current traffic safety and placement criteria, including intersections setbacks and the required cycling offset. To bring King Street cafés into compliance with current requirements, site specific traffic safety and placement reviews will be completed by staff and new traffic safety plans developed for each location in 2024. While new permit application submissions, including temporary accessible platform plans, will be required to obtain revised R58 permits, the requisite fees were paid by the King Street operators for their original permits and will not be charged again.
The Toronto and East York Community Council recommends that: 1. City Council approve the temporary closure to vehicular traffic of the westerly southbound curb lane of Duncan Street between a point 4.2 metres south of Richmond Street West and a point 27.1 metres further south from April 14, 2023 to December 31, 2023 inclusive, for the operation of a parklet café. 2. City Council authorize the General Manager, Transportation Services, in consultation with the Executive Director, Municipal Licensing and Standards, to extend permits that were issued before June 1, 2020 and remained active until April 14, 2023 for existing R58 curb lane café permit holders on Duncan Street and within the King Street Transit Priority Corridor until December 31, 2023. 3. City Council authorize the General Manager, Transportation Services, in consultation with the Executive Director, Municipal Licensing and Standards, to extend permits that were issued after April 15, 2023 for existing R58 curb lane café permit holders within the King Street Transit Priority Corridor until December 31, 2023. 4. City Council direct the General Manager, Economic Development and Culture, the General Manager, Transportation Services and the Executive Director, Municipal Licensing and Standards to report back before the end of 2023 assessing the feasibility of the continuance of year-round curb lane café operations within the King Street Transit Priority Corridor, and identify the required permit conditions for curb lane café permits issued in 2024 and beyond.
Staff recommendation as filed
Councillor Malik recommends that: 1. City Council approve the temporary closure to vehicular traffic of the westerly southbound curb lane of Duncan Street between a point 4.2 metres south of Richmond Street West and a point 27.1 metres further south from April 14, 2023 to December 31, 2023 inclusive, for the operation of a parklet café. 2. City Council authorize the General Manager, Transportation Services, in consultation with the Executive Director, Municipal Licensing and Standards to extend permits that were issued before June 1, 2020 and remained active until April 14, 2023 for existing R58 curb lane café permit holders on Duncan Street and within the King Street Transit Priority Corridor until December 31, 2023. 3. City Council authorize the General Manager, Transportation Services, in consultation with the Executive Director, Municipal Licensing and Standards to extend permits that were issued after April 15, 2023 for existing R58 curb lane café permit holders within the King Street Transit Priority Corridor until December 31, 2023. 4. City Council direct the General Manager, Economic Development and Culture, the General Manager, Transportation Services, and the Executive Director, Municipal Licensing and Standards to report back before the end of 2023 assessing the feasibility of the continuance of year-round curb lane café operations within the King Street Transit Priority Corridor, and identify the required permit conditions for curb lane café permits issued in 2024 and beyond.
TE6.81adopted
In July of 2022, City Council approved Official Plan Amendment Zoning By-law Amendment applications in order to permit the redevelopment of the lands at 1406-1428 Yonge Street with a mixed use building ( Agenda Item History - 2022.TE34.44 (toronto.ca ). At the time of the approval, it was unknown whether the parkland contribution in respect of the redevelopment would be fulfilled by way of a cash-in-lieu of parkland contribution or an off-site parkland dedication, or a combination thereof. Since that time, the owner, in consultation with my office, has proposed to add 1404 Yonge Street to the development proposal in order to provide adjacent open space as off-site parkland. City staff require direction from City Council to accept the 1404 Yonge Street property in partial fulfilment of the Section 42 requirements for the redevelopment of 1406-1428 Yonge Street. The conveyance of the1404 Yonge Street property (which is encumbered by existing easements and agreements) to the City would satisfy 50% of the parkland dedication requirement, with the remaining 50% to be satisfied through a cash-in-lieu payment prior to the issuance of the first above grade permit. In order to provide the 1404 Yonge Street property as open space for off-site parkland, the existing building must be demolished, triggering a requirement for heritage and rental housing demolition applications. Those matters are being considered by TEYCC at this meeting (Agenda Item History - 2023.TE6.30 (toronto.ca) and Agenda Item History - 2023.TE6.18 (toronto.ca) respectively), and therefor this motion is urgent. The 2022 approval also contemplated a Section 37 financial contribution of $3,380,000.00, payable prior to the issuance of the first above-grade building permit, to be allocated to a variety of matters. Some of these matters will be provided by the applicant in-kind, on-site or in the vicinity of the site. This motion further clarifies that the secured Section 37 financial contribution may be fulfilled by an indexed cash contribution of $2,850,000.00, and an indexed letter of credit in the amount of $530,000.00 to secure the provision of in-kind benefits, consistent with the matters secured in the approved zoning by-law. The City Solicitor requires this clarification so that the Section 37 Agreement can be drafted accordingly.
The Toronto and East York Community Council recommends that: 1. City Council direct that, pursuant to Section 42 of the Planning Act, prior to the first above grade building permit, the owner shall convey to the City an off-site parkland dedication, comprised of the property municipally known in the year 2023 as 1404 Yonge Street, which shall satisfy 50 percent of the parkland dedication requirement, to the satisfaction of the General Manager, Parks, Forestry and Recreation and the City Solicitor, and: a. the remaining 50 percent of the parkland dedication requirement shall be satisfied through a cash-in-lieu payment pursuant to Section 42 of the Planning Act and will be appraised through Corporate Real Estate Management, prior to the issuance of the first above grade building permit; and b. the parkland shall be conveyed to the City free and clear, above and below grade, of all easements, encumbrances, and encroachments, in an acceptable environmental condition with the exception of encumbrances of tiebacks, agreements, and existing easements; and any tiebacks will be subject to the payment of compensation to the City, in an amount as determined by the General Manager, Parks, Forestry and Recreation and the Executive Director, Corporate Real Estate Management. 2. City Council approve a development charge credit against the Parks and Recreation component of the Development Charges for the design and construction by the Owner of the Above Base Park Improvements to the satisfaction of the General Manager, Parks, Forestry and Recreation; the development charge credit shall be in an amount that is the lesser of the cost to the Owner of designing and constructing the Above Base Park Improvements, as approved by the General Manager, Parks, Forestry and Recreation, and the Parks and Recreation component of development charges payable for the development in accordance with the City's Development Charges By-law, as may be amended from time to time. 3. City Council direct the City Solicitor to secure the offsite parkland dedication requirement as a legal convenience in the Section 37 Agreement for the development at 1406-1428 Yonge Street, together with the related replacement rental housing and heritage conservation matters. 4. City Council direct that the secured Section 37 financial contribution of $3,380,000.00 may be fulfilled by an indexed cash contribution of $2,850,000.00, and an indexed letter of credit in the amount of $530,000.00 to secure the provision of in-kind benefits onsite or in the vicinity of the site, consistent with the matters secured in the approved Zoning By-law, to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor.
Staff recommendation as filed
It is recommended that: 1. City Council direct that, pursuant to Section 42 of the Planning Act, prior to the first above grade building permit, the owner shall convey to the City an off-site parkland dedication, comprised of the property municipally known in the year 2023 as 1404 Yonge Street, which shall satisfy 50% of the parkland dedication requirement, to the satisfaction of the General Manager, Parks, Forestry and Recreation and the City Solicitor; a. The remaining 50% of the parkland dedication requirement shall be satisfied through a cash-in-lieu payment pursuant to Section 42 of the Planning Act and will be appraised through Corporate Real Estate Management, prior to the issuance of the first above grade building permit. b. The parkland shall be conveyed to the City free and clear, above and below grade, of all easements, encumbrances, and encroachments, in an acceptable environmental condition with the exception of encumbrances of tiebacks, agreements, and existing easements; and any tiebacks will be subject to the payment of compensation to the City, in an amount as determined by the General Manager, Parks, Forestry and Recreation and the Executive Director, Corporate Real Estate Management. 2. City Council approve a development charge credit against the Parks and Recreation component of the Development Charges for the design and construction by the Owner of the Above Base Park Improvements to the satisfaction of the General Manager, Parks, Forestry & Recreation (PFR). The development charge credit shall be in an amount that is the lesser of the cost to the Owner of designing and constructing the Above Base Park Improvements, as approved by the General Manager, PFR, and the Parks and Recreation component of development charges payable for the development in accordance with the City's Development Charges By-law, as may be amended from time to time. 3. City Council direct the City Solicitor to secure the offsite parkland dedication requirement as a legal convenience in the Section 37 Agreement for the development at 1406-1428 Yonge Street, together with the related replacement rental housing and heritage conservation matters. 4. City Council direct that the secured Section 37 financial contribution of $3,380,000.00 may be fulfilled by an indexed cash contribution of $2,850,000.00, and an indexed letter of credit in the amount of $530,000.00 to secure the provision of in-kind benefits onsite or in the vicinity of the site, consistent with the matters secured in the approved zoning by-law, to the satisfaction of the Chief Planner and City Solicitor.
TE6.82adopted
I am writing to request your support in directing Traffic Operations Staff to install a speed hump on Lonsdale Road between Oriole Road and Oriole Parkway. Local residents and concerned parents have reached out to my office and have consulted with Traffic Operations, advising that this intersection should have additional traffic calming measures. The unusual nature of this intersection has been a source of strain for the community since a child was hit by a car there while walking home from school in 2021.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed hump) on Lonsdale Road, between Oriole Road and Oriole Parkway (east intersection). 2. Directed the City Solicitor to prepare a by-law to alter the roadway to install one speed hump on Lonsdale Road, between Oriole Road and Oriole Parkway (east intersection), generally as shown on Drawing TC-146, dated June, 2023, from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
It is recommended that the Toronto and East York Community Council: 1. Waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed hump) on Lonsdale Road, between Oriole Road and Oriole Parkway (east intersection). 2. Direct the City Solicitor to prepare a by-law to alter the roadway to install one speed hump on Lonsdale Road, between Oriole Road and Oriole Parkway (east intersection), generally as shown on 'Drawing No. TC-146' dated June, 2023 from the Director, Traffic Management, Transportation Services.
TE6.83adopted
Parking Amendments - Keywest Avenue
I am writing to you today to request your support in amending the parking by-laws on Keywest Avenue in order to ensure a safe pick-up and drop-off space for students Lycée Français. In recent conversation with of Head of School at Lycée Français, my office learned of an issue regarding lack of capacity to ensure student's safety as they arrive to and leave school. This issue is especially prescient as Lycée Français goes ahead with an expansion that will only further reduce the capacity of the current student and faculty parking lot. They have requested an amendment of the parking by-laws on Keywest Avenue to allow for a safer pick up/drop off zone for students for the duration of the construction which is expected to start this summer and last into the early fall and beyond, as capacity in the faculty/student parking lot will remain diminished.
The Toronto and East York Community Council: 1. Rescinded the parking prohibition in effect from 6:00 a.m. to 11:00 p.m., on the north side of Keywest Avenue, between Dufferin Street and Northcliffe Boulevard. 2. Rescinded the stopping prohibition in effect at all times on the south side of Keywest Avenue, between Dufferin Street and Northcliffe Boulevard. 3. Prohibited parking from 6:00 a.m. to 11:00 p.m., on the north side of Keywest Avenue, between Dufferin Street and a point 90 metres east. 4. Authorized parking for a maximum period of 10 minutes from 8:00 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday, on the north side of Keywest Avenue, between a point 90 metres east of Dufferin Street and a point 33.5 metres further east. 5. Prohibited parking from 6:00 a.m. to 8:00 a.m. and 9:00 a.m. to 3:00 p.m. and 4:00 p.m. to 11:00 p.m., on the north side of Keywest Avenue, between a point 90 metres east of Dufferin Street and a point 33.5 metres further east. 6. Prohibited parking from 6:00 a.m. to 11:00 p.m., on the north side of Keywest Avenue, between a point 123.5 metres east of Dufferin Street and Northcliffe Boulevard. 7. Prohibited stopping at all times on the south side of Keywest Avenue, between Dufferin Street and a point 14.5 metres east. 8. Amended the existing permit parking regulation in effect from 12:00 midnight to 6:00 a.m., daily, on the odd (south) side of Keywest Avenue, from Dufferin Street to Northcliffe Boulevard, to be in effect from 12:01 a.m. to 6:00 a.m., daily, between a point 14.5 metres east of Dufferin Street to a point 74.5 metres further east. 9. Prohibited stopping at all times on the south side of Keywest Avenue, between a point 89 metres east of Dufferin Street and Northcliffe Boulevard.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council rescind the parking prohibition in effect from 6:00 a.m. to 11:00 p.m., on the north side of Keywest Avenue, between Dufferin Street and Northcliffe Boulevard. 2. Toronto and East York Community Council rescind the stopping prohibition in effect at all times on the south side of Keywest Avenue, between Dufferin Street and Northcliffe Boulevard. 3. Toronto and East York Community Council prohibit parking from 6:00 a.m. to 11:00 p.m., on the north side of Keywest Avenue, between Dufferin Street and a point 90 metres east. 4. Toronto and East York Community Council authorize parking for a maximum period of 10 minutes from 8:00 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday, on the north side of Keywest Avenue, between a point 90 metres east of Dufferin Street and a point 33.5 metres further east. 5. Toronto and East York Community Council prohibit parking from 6:00 a.m. to 8:00 a.m. and 9:00 a.m. to 3:00 p.m. and 4:00 p.m. to 11:00 p.m., on the north side of Keywest Avenue, between a point 90 metres east of Dufferin Street and a point 33.5 metres further east. 6. Toronto and East York Community Council prohibit parking from 6:00 a.m. to 11:00 p.m., on the north side of Keywest Avenue, between a point 123.5 metres east of Dufferin Street and Northcliffe Boulevard. 7. Toronto and East York Community Council prohibit stopping at all times on the south side of Keywest Avenue, between Dufferin Street and a point 14.5 metres east. 8. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:00 midnight to 6:00 a.m., daily, on the odd (south) side of Keywest Avenue, from Dufferin Street to Northcliffe Boulevard, to be in effect from 12:01 a.m. to 6:00 a.m., daily, between a point 14.5 metres east of Dufferin Street to a point 74.5 metres further east. 9. Toronto and East York Community Council prohibit stopping at all times on the south side of Keywest Avenue, between a point 89 metres east of Dufferin Street and Northcliffe Boulevard.
TE6.84adopted
Parking Amendments - Melgund Road
I am writing to request your support in directing Traffic Operations Staff to amend parking regulations on Melgund Road. These parking amendments were proposed by a resident petition, with 6 out of 7 houses on the stretch of Melgund Road, between Bathurst Street and Hilton Avenue, signing. The petition was presented in consideration of Wychwood TPL and Wells Hells Park users to have additional parking capacity throughout the year. This motion follows consultation with Traffic Operations Staff.
The Toronto and East York Community Council: 1. Rescinded the parking prohibition in effect each Thursday, from April 1 to November 30, inclusive, on the north side of Melgund Road, between 15 metres east of Bathurst Street and Wells Hill Avenue. 2. Amended the existing parking prohibition in effect at all times, during the months of January, February, March, May, July, September, November and December, on the south side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue. 3. Amended the existing parking prohibition in effect at all times, during the months of April, June, August and October, on the north side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue. 4. Amended the existing maximum 1-hour parking regulation in effect from 10:00 a.m. to 6:00 p.m., Monday to Friday, during the months of April, June, August and October, on the south side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue. 5. Amended the existing maximum 1-hour parking regulation in effect from 10:00 a.m. to 6:00 p.m., Monday to Friday, during the months of January, February, March, May, July, September, November and December, on the north side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue. 6. Prohibited parking at all times on the south side of Melgund Road, between Bathurst Street and Hilton Avenue. 7. Authorized parking for a maximum period of 1-hour from 10:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Melgund Road, between a point 15 metres east of Bathurst Street and Hilton Avenue. 8. Amended the existing permit parking regulation in effect from 12:01 a.m. to 10:00 a.m. daily, except no parking anytime during the months of January, February, March, May, July, September, November and December on the odd (south) side of Melgund Road, from Bathurst Street to Wells Hill Avenue, to be in effect from Hilton Avenue and Wells Hill Avenue. 9. Amended the existing permit parking regulation in effect from 12:01 a.m. to 10:00 a.m. daily, except no parking anytime during the months of April, June, August, and October on the even (north) side of Melgund Road, from Bathurst Street to Wells Hill Avenue, to be in effect from Hilton Avenue and Wells Hill Avenue. 10. Authorized permit parking to be in effect from 12:01 a.m. to 10:00 a.m., daily, on the even (north) side of Melgund Road, from Bathurst Street to Hilton Avenue.
Staff recommendation as filed
It is recommended that the Toronto and East York Community Council: 1. Toronto and East York Community Council rescind the parking prohibition in effect each Thursday, from April 1 to November 30, inclusive, on the north side of Melgund Road, between 15 metres east of Bathurst Street and Wells Hill Avenue. 2. Toronto and East York Community Council amend the existing parking prohibition in effect at all times, during the months of January, February, March, May, July, September, November and December, on the south side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue. 3. Toronto and East York Community Council amend the existing parking prohibition in effect at all times, during the months of April, June, August and October, on the north side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue. 4. Toronto and East York Community Council amend the existing maximum 1-hour parking regulation in effect from 10:00 a.m. to 6:00 p.m., Monday to Friday, during the months of April, June, August and October, on the south side of Melgund Road, between Bathurst Street and Wells Hill Avenue, to be in effect between Hilton Avenue and a point 20 metres west of Wells Hill Avenue.
TE6.85adopted
Rescind Turning Restrictions on Hillsdale Avenue for Vehicles Exiting Art Shoppe Condominium
I'm writing today to request your support in rescinding the turning restrictions that were installed on Hillsdale Avenue East prior to occupancy at 2131 Yonge Street (Art Shoppe Condominium). Just prior to occupancy in 2020, there was concern amongst residents and the South Eglinton and Davisville Ratepayers' Association (SEDRA) that traffic exiting out of the southern driveway of Art Shoppe Condos would cause significant traffic infiltration in the community east of Yonge. However, through site plan approval, the number of vehicular parking spots was decreased and the commercial profile changed to smaller tenants. Upon reviewing the traffic volumes in spring 2022 undertaken by members of the condo found that traffic was 20% less than what was projected by the developer. In this spirit, the Board at Art Shoppe Condos has requested our office move forward with rescinding these restrictions to allow for easier and flexible egress from the Condo. My office has received confirmation from SEDRA that they are in accordance with this proposal.
The Toronto and East York Community Council: 1. Rescinded the existing westbound right turn prohibition in effect at all times at the intersection of Hillsdale Avenue East and the private driveway at 2131 Yonge Street located on the north side of Hillsdale Avenue East, approximately 70 metres east of Yonge Street. 2. Rescinded the existing southbound left turn prohibition in effect at all times at the intersection of Hillsdale Avenue East and the private driveway at 2131 Yonge Street located on the north side of Hillsdale Avenue East, approximately 70 metres east of Yonge Street.
Staff recommendation as filed
It is recommended that the Toronto and East York Community Council: 1. Toronto and East York Community Council rescind the existing westbound right turn prohibition in effect at all times at the intersection of Hillsdale Avenue East and the private driveway at 2131 Yonge Street located on the north side of Hillsdale Avenue East, approximately 70 metres east of Yonge Street. 2. Toronto and East York Community Council rescind the existing southbound left turn prohibition in effect at all times at the intersection of Hillsdale Avenue East and the private driveway at 2131 Yonge Street located on the north side of Hillsdale Avenue East, approximately 70 metres east of Yonge Street.
TE6.86adopted
Parking Amendments - 387 Bloor Street East (The Canopy Hotel)
SkyGrid Construction Incorporated constructed a 54-storey residential building that is also home to The Canopy by Hilton Toronto Yorkville, a 10-storey hotel at 387-403 Bloor Street East. The site is located on the south side of Bloor Street East, one property west of Sherbourne Street, The development consist of 476 dwelling units, 188 hotel rooms and a 4-level underground parking garage. The hotel frontage is on Bloor Street East. At the request of The Canopy Hotel, in consultation with Transportation Services, Toronto Transit Commission, The Canopy Hotel and Councillor Chris Moise, a passenger loading zone will be established on Bloor Street East fronting the hotel entrance. The passenger loading zone will operate at all times and will not negatively impact traffic, cycling or transit operation.
The Toronto and East York Community Council recommends that: 1. City Council rescind the designated taxicab stand for 2 taxis in effect at all times, except 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m., Monday to Friday, on the south side of Bloor Street East, west of Sherbourne Street. 2. City Council rescind the existing stopping prohibition in effect at all times on the both sides of Bloor Street East, between Sherbourne Street and a point 50 metres further west. 3. City Council rescind the existing parking machines regulation on both sides of Bloor Street East, between Mount Pleasant Road and Sherbourne Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 4. City Council prohibit stopping at all times on the north side of Bloor Street East, between Sherbourne Street and a point 50 metres further west. 5. City Council prohibit stopping at all times on the south side of Bloor Street East, between Sherbourne Street and a point 47 metres further west. 6. City Council authorize the installation of parking machines on the north side of Bloor Street East, between Sherbourne Street and Mount Pleasant Road, to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 7. City Council designate a passenger loading zone to be in effect at all times on the south side of Bloor Street East, between a point 47 metres west of Sherbourne Street and a point 20 metres further west. 8. City Council authorize the installation of parking machines on the south side of Bloor Street East, between a point 67 metres west of Sherbourne Street and a point 66 metres further west, to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 9. City Council prohibit stopping at all times on the south side of Bloor Street East, between a point 133 metres west of Sherbourne Street and Huntley Street.
Staff recommendation as filed
It is recommended that: 1. City Council rescind the designated taxicab stand for 2 taxis in effect at all times, except 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m., Monday to Friday, on the south side of Bloor Street East, west of Sherbourne Street. 2. City Council rescind the existing stopping prohibition in effect at all times on the both sides of Bloor Street East, between Sherbourne Street and a point 50 metres further west. 3. City Council rescind the existing parking machines regulation on both sides of Bloor Street East, between Mount Pleasant Road and Sherbourne Street, in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 4. City Council prohibit stopping at all times on the north side of Bloor Street East, between Sherbourne Street and a point 50 metres further west. 5. City Council prohibit stopping at all times on the south side of Bloor Street East, between Sherbourne Street and a point 47 metres further west. 6. City Council authorize the installation of parking machines on the north side of Bloor Street East, between Sherbourne Street and Mount Pleasant Road, to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 7. City Council designate a passenger loading zone to be in effect at all times on the south side of Bloor Street East, between a point 47 metres west of Sherbourne Street and a point 20 metres further west. 8. City Council authorize the installation of parking machines on the south side of Bloor Street East, between a point 67 metres west of Sherbourne Street and a point 66 metres further west, to be in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday, and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 9. City Council prohibit stopping at all times on the south side of Bloor Street East, between a point 133 metres west of Sherbourne Street and Huntley Street.
TE6.87adopted
Parking Amendments - Wellington Street East
Earlier this year, my office undertook a comprehensive review of parking regulations in collaboration with the community. Through this participatory process, it was revealed that members of the community have expressed a strong desire for the implementation of parking regulation changes along this section of Wellington Street East.
The Toronto and East York Community Council: 1. Authorized the amendments to parking regulations on Wellington Street East, between Scott Street and Leader Lane, as described in Attachment 1 to the letter (June 16, 2023) from Councillor Chris Moise.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize the amendments to parking regulations on Wellington Street East, between Scott Street and Leader Lane, as described in "Attachment 1: Parking Amendments - Wellington Street East".
TE6.88adopted
Appointments to the Board of Management of the Eastview Community Centre
The Eastview Community Centre recently had their Annual General Meeting and have submitted their new board members for approval by City Council. Given the upcoming Council break I am submitting these names so they can begin work immediately. I want to thank the outgoing board members for their service and extend a warm welcome to the newly appointed board members.
The Toronto and East York Community Council: 1. Appointed the following individuals to the Board of the Eastview Community Centre, at pleasure of Council, for a term of office ending June 30, 2025 and until successors are appointed: Andrea Nameth Courtney Fitton Rob Mackinnon 2. Re-appointed the following individuals to the Board of the Eastview Community Centre, at pleasure of Council, for a term of office ending June 30, 2025 and until successors are appointed: Jennifer King Rebecca Heersink Abas Barra
Staff recommendation as filed
Councillor Fletcher recommends that: 1. City Council appoint the following individuals to the Board of the Eastview Community Centre, for the terms of office noted below and until successors are appointed: - Andrea Nameth for a term of office ending June 30 ,2025 - Courtney Fitton for a term of office ending June 30, 2025 - Rob Mackinnon for a term of office ending June 30, 2025 2. City Council appoint the following individuals to the Board of the Eastview Community Centre, for the terms of office noted below and until successors are appointed: - Jennifer King for a term of office ending June 30, 2025 - Rebecca Heersink for a term of office ending June 30, 2025 - Abas Barra for a term of office ending June 30, 2025
TE6.89adopted
Appointment of Members to the Ralph Thornton Community Centre Board of Management
The Ralph Thornton Centre recently had their Annual General Meeting and have submitted their new board members for approval by City Council. Given the upcoming Council break I am submitting these names so they can begin work immediately. I want to thank the outgoing board members for their service and extend a warm welcome to the newly appointed board members.
The Toronto and East York Community Council: 1. Appointed the following individuals to the Ralph Thornton Community Centre Board of Management, at pleasure of Council, for a term of office ending June 14, 2026 and until successors are appointed: Hongmei Cai Kelly Davies Ruby Kailray Hailee Morrison McKell Neilson Lindsay Williams 2. Re-appointed the following individuals to the Board of the Ralph Thornton Centre, at pleasure of Council, for a term of office ending June 14, 2026 and until successors are appointed: Heather Simpson James Topham
Staff recommendation as filed
Councillor Fletcher recommends that: 1. City Council appoint the following individuals to the Board of the Ralph Thornton Centre for the terms noted below and until successors are appointed: - Hongmei Cai, for a term of office ending June 14, 2026 - Kelly Davies, for a term of office ending June 14, 2026 - Ruby Kailray, for a term of office ending June 14, 2026 - Hailee Morrison, for a term of office ending June 14, 2026 - McKell Neilson, for a term of office ending June 14, 2026 - Lindsay Williams, for a term of office ending June 14, 2026 2. City Council re-appoint the following individuals to the Board of the Ralph Thornton Centre for the terms noted below and until successors are appointed: - Heather Simpson, for a term of office ending June 14, 2026 - James Topham, for a term of office ending June 14, 2026.
TE6.90adopted
Logan Avenue, between First Avenue and the address of 445 Logan Avenue is within the 8J permit parking area however this block is currently under the city 3-hour parking limit bylaw. First Avenue will lose a parking space due to upcoming Metrolinx construction. Adding space on Logan will ensure that the parking supply is maintained. This is the simplest solution and I hope you will support it.
The Toronto and East York Community Council recommends that: 1. City Council exempt the implementation of permit parking on Logan Avenue, between First Avenue and the address of 445 Logan Avenue, from the requirements of subsection 925-4B of City of Toronto Municipal Code Chapter 925, Permit Parking, until such time as Toronto and East York Community Council considers a request for implementation of permit parking at that location.
Staff recommendation as filed
Councillor Fletcher recommends that: 1. City Council exempt the implementation of permit parking on Logan Avenue, between First Avenue and the address of 445 Logan Avenue, from the requirements of subsection 925-4B of City of Toronto Municipal Code Chapter 925, Permit Parking, until such time as Toronto and East York Community Council considers a request for implementation of permit parking at that location.
TE6.91adopted
The east-west laneway that runs between Gough Avenue and Carlaw Avenue is located just north of Danforth Avenue. It is directly adjacent to a local church and is situated in a residential neighbourhood. I recently held a site visit with local community members who expressed concerns over speeding in this laneway. This letter includes recommendations to install speed bumps in the laneway to improve pedestrian and vehicular safety.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the Lane North of Danforth Avenue, East of Carlaw Avenue (east-west leg), between Carlaw Avenue and Lane North of Danforth Avenue, West of Gough Avenue, as shown on Drawing TC-147, dated June 2023, from the Director, Traffic Management, Transportation Services. 2. Authorized the installation of speed bumps in the Lane North of Danforth Avenue, West of Gough Avenue, as shown on Drawing TC-147, dated June 2023, from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the Lane North of Danforth Avenue, East of Carlaw Avenue (east-west leg), between Carlaw Avenue and Lane North of Danforth Avenue, West of Gough Avenue, as shown on Drawing Number TC-147, dated June 2023, from the Director, Traffic Management, Transportation Services. 2. Toronto and East York Community Council authorize the installation of speed bumps in the Lane North of Danforth Avenue, West of Gough Avenue, as shown on Drawing Number TC-147, dated June 2023, from the Director, Traffic Management, Transportation Services.
TE6.92adopted
All-Way Stop Control - Norwood Terrace and Enderby Road
Residents have reached out to my office with concerns about pedestrian safety on their roadway. Our office has received a petition from residents with support for the installation of all-way stop controls at the above mentioned intersection. I am requesting that all-way stop controls be installed at Norwood Terrace and Enderby Road.
The Toronto and East York Community Council: 1. Authorized all-way compulsory stop control at the intersection of Norwood Terrace and Enderby Road.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize all-way compulsory stop control at the intersection of Norwood Terrace and Enderby Road.
TE6.93adopted
Appointments to the Community Centre 55 Board of Management
I am submitting this letter on behalf of the Community Centre 55 Board of Management to nominate the individuals listed below to the Board. The Board has confirmed that each of these nominees are qualified to serve under the provisions of the City of Toronto's Public Appointments Policy and the Relationship Framework for Community Centre Boards of Management.
The Toronto and East York Community Council: 1. Appointed the following nominees to the Community Centre 55 Board of Management, at pleasure of Council, for a term of office ending June 30, 2027 and until successors are appointed: David Brown Hillary Adams
Staff recommendation as filed
It is recommended that Toronto and East York Community Council: 1. In accordance with the City's Public Appointments Policy, appoint the following nominees to the Community Centre 55 Board of Management for a term expiring on June 30, 2027: David Brown Hillary Adams 2. Remove the following members from the Community Centre 55 Board of Management as of June 30, 2023: Carole Stimmell
TE6.94adopted
Toronto and East York Community Council, at its meeting on May 24, 2023, adopted item TE5.54 entitled "Parking relief for Wheeler Ave (Norway Avenue and Williamson Road - Parking Changes)" in order to approve amendments to parking regulations on Norway Avenue and on Williamson Road in response to watermain repair work underway on Wheeler Avenue. The purpose of this motion is to reopen Toronto and East York Community Council's decision for item TE5.54 to amend the by-law changes that are required to ensure accessibility to on-street parking for local residents affected by construction on Wheeler Avenue.
The Toronto and East York Community Council re-opened Item TE5.54, headed "Parking relief for Wheeler Ave (Norway Avenue and Williamson Road - Parking Changes)", and replaced Community Council decisions 1-9 with the following: 1. Rescinded the existing parking prohibition in effect at all times, on the north side of Norway Avenue between Woodbine Avenue and Wheeler Avenue. 2. Rescinded the existing parking prohibition in effect at all times, on the south side of Norway Avenue between Wheeler Avenue and Lee Avenue. 3. Prohibit parking in effect at all times on the north side of Norway Avenue between Woodbine Avenue and Kenilworth Avenue. 4. Rescinded the existing permit parking regulation in effect at all times from 12:01 a.m. to 7:00 a.m. daily, on the odd (south) side of Norway Avenue from Haslett Avenue to Wheeler Avenue. 5. Authorized area based permit parking in effect from 12:01 a.m. to 7:00 a.m. daily on the even (north) side of Norway Avenue, from Kenilworth Avenue to Wheeler Avenue. 6. Authorized area based permit parking in effect from 12:01 a.m. to 7:00 a.m. daily on the odd (south) side of Norway Avenue, from Haslett Avenue to Lee Avenue. 7. Rescinded the existing maximum 10 minute parking regulation in effect from 8:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:00 p.m., 3:00 p.m. to 4:00 p.m., Monday to Friday, except public holidays, from September 1 of one year to June 30 of the next following year, inclusive on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point 38 metres west of a point opposite Wineva Avenue, for the period from July 1, 2023 to August 31, 2023. 8. Rescinded the existing no standing prohibition in effect from 9:00 a.m. to 11:00 a.m., and 1:00 p.m. to 3:00 p.m., Monday to Friday except public holidays, on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point 15 metres east of Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 9. Authorized parking for a maximum period of 10 minutes from 8:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:00 p.m., 3:00 p.m. to 4:00 p.m., Monday to Friday, except public holidays, on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point opposite Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 10. Prohibited standing in effect from 9:00 a.m. to 11:00 a.m., and 1:00 p.m. to 3:00 p.m., Monday to Friday except public holidays, on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point opposite Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 11. Authorized area based permit parking in effect from 12:01 a.m. to 7:00 a.m. daily from July 1, 2023 to August 31, 2023, inclusive, except no parking anytime from Wineva Avenue and a point 9 metres west on the even (north) side of Williamson Road, from Wineva Avenue to Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 12. Directed that Norway Avenue and Williamson Road be returned to their pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
It is recommended that Toronto and East York Community Council reopen Item TE5.54, entitled "Parking relief for Wheeler Ave (Norway Avenue and Williamson Road - Parking Changes)", to replace Community Council decisions 1-9 with the following: 1. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the north side of Norway Avenue between Woodbine Avenue and Wheeler Avenue. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the south side of Norway Avenue between Wheeler Avenue and Lee Avenue. 3. Toronto and East York Community Council prohibit parking in effect at all times on the north side of Norway Avenue between Woodbine Avenue and Kenilworth Avenue. 4. Toronto and East York Community Council rescind the existing permit parking regulation in effect at all times from 12:01 a.m. to 7:00 a.m. daily, on the odd (south) side of Norway Avenue from Haslett Avenue to Wheeler Avenue. 5. Toronto and East York Community Council authorize area based permit parking in effect from 12:01 a.m. to 7:00 a.m. daily on the even (north) side of Norway Avenue, from Kenilworth Avenue to Wheeler Avenue. 6. Toronto and East York Community Council authorize area based permit parking in effect from 12:01 a.m. to 7:00 a.m. daily on the odd (south) side of Norway Avenue, from Haslett Avenue to Lee Avenue. 7. Toronto and East York Community Council rescind the existing maximum 10 minute parking regulation in effect from 8:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:00 p.m., 3:00 p.m. to 4:00 p.m., Monday to Friday, except public holidays, from September 1 of one year to June 30 of the next following year, inclusive on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point 38 metres west of a point opposite Wineva Avenue, for the period from July 1, 2023 to August 31, 2023. 8. Toronto and East York Community Council rescind the existing no standing prohibition in effect from 9:00 a.m. to 11:00 a.m., and 1:00 p.m. to 3:00 p.m., Monday to Friday except public holidays, on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point 15 metres east of Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 9. Toronto and East York Community Council authorize parking for a maximum period of 10 minutes from 8:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:00 p.m., 3:00 p.m. to 4:00 p.m., Monday to Friday, except public holidays, on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point opposite Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 10. Toronto and East York Community Council prohibit standing in effect from 9:00 a.m. to 11:00 a.m., and 1:00 p.m. to 3:00 p.m., Monday to Friday except public holidays, on the north side of Williamson Road, between a point 42.5 metres east of Lee Avenue and a point opposite Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 11. Toronto and East York Community Council authorize area based permit parking in effect from 12:01 a.m. to 7:00 a.m. daily from July 1, 2023 to August 31, 2023, inclusive, except no parking anytime from Wineva Avenue and a point 9 metres west on the even (north) side of Williamson Road, from Wineva Avenue to Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 12. Toronto and East York Community Council direct that Norway Avenue and Williamson Road be returned to their pre-construction traffic and parking regulations when the project is complete.
TE6.95adopted
This staff report is about a matter that City Council has directed for action to this Community Council, as it has delegated authority from City Council to make a final decision. The restaurant at 17 St. Nicholas Street, operating as Bar Volo, received a temporary CaféTO permit in 2021 and 2022 to operate an outdoor dining area on St. Nicholas Street, which is designated as a public laneway The patio consists of elements which is in contravention of City of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays, § 742-10.4A (1), which specifies that curb lane cafés must be located on a major arterial, minor arterial, collector or local road and therefore beyond staff authority to approve a patio application on this laneway. The business is seeking approval from Toronto East York Community Council to allow a CaféTO patio to be maintained within the public right-of-way at 17 St. Nicholas Street. This report will outline a recommendation as requested by City Council to allow this patio to operate in 2023 by waiving certain requirements related to the operation of a curb lane café in a laneway and the use of platforms. Staff will undertake community consultations that typically happen when implementing these programs and gather feedback over this season from stakeholders including neighbouring businesses and the Councillor's office in preparation for 2024 planning and beyond.
The Toronto and East York Community Council: 1. Authorized the General Manager, Transportation Services to exempt curb lane café permit area at 17 St. Nicholas Street, Bar Volo, from the requirements of § 742-10.4A (1) and § 742-10.4. B(6) and B(7) and § 742-10.4 C(1) and C(3) of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays, for the 2023 CaféTO season.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services and Director, Permits and Enforcement, Transportation Services recommend that: 1. Toronto East York Community Council authorize the General Manager, Transportation Services to exempt curb lane café permit area at 17 St. Nicholas Street, Bar Volo, from the requirements of § 742-10.4A (1) and § 742-10.4. B(6) and B(7) and § 742-10.4 C(1) and C(3) of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays, for the 2023 CaféTO season.
TE6.96adopted
461 King Street West - CaféTO Curb Lane Café
The restaurant located at 461 King Street West, operating as Silent H, has applied for a permanent CaféTO curb lane café permit. Following a feasibility assessment it was determined that the proposed curb lane café area would not be eligible due to the permit area being located within a Commercial Loading Zone, which is not permitted in City of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays. This commercial loading zone was implemented as part of the King Street West Transit Pilot Agenda Item History - 2017.EX26.1 (toronto.ca). This motion seeks to remove the Commercial Loading Zone in order to provide a café permit for this restaurant operator.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing commercial loading zone in effect at all times, on the south side of King Street West, between a point 96.2 metres west of Spadina Avenue and a point 16.4 metres further west. 2. City Council rescind the existing stopping prohibition in effect at all times, on the south side of King Street West, between a point 56.4 metres west of Spadina Avenue and a point 39.8 metres further west. 3. City Council prohibit stopping in effect at all times, on the south side of King Street West, between a point 56.4 metres west of Spadina Avenue and a point 112.6 metres further west.
Staff recommendation as filed
Councillor Malik recommends that: 1. City Council rescind the existing commercial loading zone in effect at all times, on the south side of King Street West, between a point 96.2 metres west of Spadina Avenue and a point 16.4 metres further west. 2. City Council rescind the existing stopping prohibition in effect at all times, on the south side of King Street West, between a point 56.4 metres west of Spadina Avenue and a point 39.8 metres further west. 3. City Council prohibit stopping in effect at all times, on the south side of King Street West, between a point 56.4 metres west of Spadina Avenue and a point 112.6 metres further west.
TE6.97adopted
603 King Street - Accessible Ramp, Stair and Landing Encroachments
Earl's Restaurant is proposing to install an accessible ramp, stair and landing encroachments within the City right of way, within the King Street West sidewalk fronting the entrance to 603 King Street West. The proposed encroachments will maintain 2.1m sidewalk clearance immediately adjacent to them.
The Toronto and East York Community Council: 1. Directed the General Manager, Transportation Services to negotiate an Encroachment Agreement with the property owner(s) of 603 King Street West to install and maintain an accessible ramp, stair and landing encroachments within the sidewalk of the King Street West City right-of-way to the satisfaction of the General Manager, Transportation Services and the City Solicitor.
Staff recommendation as filed
Councillor Malik recommends that: 1. Toronto and East York Community Council direct the General Manager, Transportation Services, to negotiate an Encroachment Agreement with the property owner(s) of 603 King Street West to install and maintain an accessible ramp, stair and landing encroachments within the sidewalk of the King Street West City right of way to the satisfaction of the General Manager of Transportation Services and the City Solicitor.
TE6.98adopted
624 King Street West - CaféTO Curb Lane Café
The restaurant located at 624 King Street West, operating as Cassius on King, has applied for a permanent CaféTO curb lane café permit. Following a feasibility assessment it was determined that the proposed curb lane café area would not be eligible due to the permit area being located within a Commercial Loading Zone as well as a Taxi Stand/No Standing area, which is not permitted under City of Toronto Municipal Code Chapter 742, Sidewalk Cafés, Parklets and Marketing Displays. An existing commercial loading zone was implemented as part of the King Street West Transit Pilot in 2017, Agenda Item History - 2017.EX26.1 (toronto.ca). This motion seeks to remove the Commercial Loading Zone and realign parking regulations related to a taxi stand and no stopping zone in order to provide a café permit for this restaurant operator.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing commercial loading zone in effect at all times, on the north side of King Street West, between a point 94.3 metres west of Portland Street and a point 33.7 metres further west. 2. City Council rescind the designated taxi stand for three taxis in effect at all times on the north side of King Street West, between a point 77.5 metres west of Portland Street and a point 16.8 metres further west. 3. City Council designate a taxi stand for six taxis to operate at all times on the north side of King Street West, between a point 77.5 metres west of Portland Street and a point 33.3 metres further west. 4. City Council prohibit stopping in effect at all times, on the south side of King Street West, between a point 110.8 metres west of Portland Street and a point 17.2 metres further west.
Staff recommendation as filed
Councillor Malik recommends that: 1. City Council rescind the existing commercial loading zone in effect at all times, on the north side of King Street West, between a point 94.3 metres west of Portland Street and a point 33.7 metres further west. 2. City Council rescind the designated taxi stand for three taxis in effect at all times on the north side of King Street West, between a point 77.5 metres west of Portland Street and a point 16.8 metres further west. 3. City Council designate a taxi stand for six taxis to operate at all times on the north side of King Street West, between a point 77.5 metres west of Portland Street and a point 33.3 metres further west. 4. City Council prohibit stopping in effect at all times, on the south side of King Street West, between a point 110.8 metres west of Portland Street and a point 17.2 metres further west.
TE6.99adopted
Amendment - Speed Humps Installation - Oak Park Ave, between Danforth Avenue and Lumsden Avenue
Our office received communications from a resident with concerns about the placement of a speed hump directly in front of his home, effectively impacting access to his driveway. I request adjusting the placement as per drawing TC-149.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorized the installation of traffic calming (speed humps) on Oak Park Avenue between Danforth Avenue and Lumsden Avenue 2. Replaced Drawing 421G-4034, dated May 2022, attached to the letter (May 26, 2022) from Councillor Brad Bradford in Item 2022.TE33.69 with the attached Drawing TC-149, dated June 2023, from the Director, Traffic Management, Transportation Services. 3. Directed the City Solicitor to prepare a by-law to alter sections of the roadway to install ten speed humps on Oak Park Avenue between Danforth Avenue and Lumsden Avenue for traffic calming purposes, generally as shown on Drawings 421G-4033, dated May 2022, and TC-149, dated June 2023, from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Bradford recommends that: 1. Toronto and East York Community Council waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Oak Park Avenue between Danforth Avenue and Lumsden Avenue 2. Toronto and East York Community Council replace Drawing No. 421G-4034 dated May 2022, attached to the letter (May 26, 2022), in Item TE33.69 entitled "Speed Humps Installation - Oak Park Avenue between Danforth Avenue and Lumsden Avenue" from Councillor Brad Bradford, Ward 19, Beaches - East York, with the attached Drawing No. TC-149, dated June 2023 from the Director, Traffic Management, Transportation Services. 3. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter sections of the roadway to install ten speed humps on Oak Park Avenue between Danforth Avenue and Lumsden Avenue for traffic calming purposes, generally as shown on Drawing No. 421G-4033, dated May 2022 and TC-149, dated June 2023, from the Director, Traffic Management, Transportation Services.
TE6.100adopted
Borden Street Reconstruction Project
Amendments to Traffic and Parking Regulations are required to support the expansion of the proposed planted bumpouts on the east side of Borden Street, north and south of Ulster Street, as part of the scheduled Borden Street Reconstruction project.
The Toronto and East York Community Council: 1. Prohibited parking at all times, on the east side of Borden Street, between a point 23.4 metres south of Ulster Street and a point 21.7 metres north of Ulster Street. 2. Prohibited parking at all times, on the west side of Borden Street, between Ulster Street and a point 21.7 metres north of Ulster Street. 3. Amended the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., daily, on the east side of Borden Street, between College Street and Ulster Street, to be in effect between College Street and a point 23.4 metres south of Ulster Street. 4. Amended the existing parking prohibition in effect anytime, from December 1 of one year to March 31 of the next following year, inclusive, and from the 16th day to the last day of each month, from April 1 to November 30, inclusive, on the east side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street. 5. Amended the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the east side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street. 6. Amended the existing parking prohibition in effect at all times from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the west side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street. 7. Amended the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., from December 1 of one year to March 31 of the next following year, inclusive and from the 16th day to the last day of each month, from April 1 to November 30, inclusive, on the west side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street.
Staff recommendation as filed
Councillor Saxe recommends that: 1. Toronto and East York Community Council prohibit parking at all times, on the east side of Borden Street, between a point 23.4 metres south of Ulster Street and a point 21.7 metres north of Ulster Street. 2. Toronto and East York Community Council prohibit parking at all times, on the west side of Borden Street, between Ulster Street and a point 21.7 metres north of Ulster Street. 3. Toronto and East York Community Council amend the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., daily, on the east side of Borden Street, between College Street and Ulster Street, to be in effect between College Street and a point 23.4 metres south of Ulster Street. 4. Toronto and East York Community Council amend the existing parking prohibition in effect anytime, from December 1 of one year to March 31 of the next following year, inclusive, and from the 16th day to the last day of each month, from April 1 to November 30, inclusive, on the east side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street. 5. Toronto and East York Community Council amend the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the east side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street. 6. Toronto and East York Community Council amend the existing parking prohibition in effect at all times from the 1st day to the 15th day of each month, April 1 to November 30, inclusive, on the west side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street. 7. Toronto and East York Community Council amend the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., from December 1 of one year to March 31 of the next following year, inclusive and from the 16th day to the last day of each month, from April 1 to November 30, inclusive, on the west side of Borden Street, between Ulster Street and Harbord Street, to be in effect between a point 21.7 metres north of Ulster Street and Harbord Street.