TE5.26adopted
Exhibition Place - Cultural Heritage Landscape Assessment and Next Steps for Master Plan
The purpose of the report is to provide a summary of the Cultural Heritage Landscape Assessment (CHLA) completed for Exhibition Place, to afirm its importance in informing the on-going Master Plan exercise for Exhibition Place and to oultine the next steps for the Exhibition Place Master Plan process. Exhibition Place is a unique City-owned site comprising approximately 192 acres of land within the Central Waterfront area. The lands are situated between the Gardiner Expressway and Lake Shore Boulevard West, with access points from Lake Shore Boulevard West, Dufferin Street and Strachan Avenue. Exhibition Place is an important asset to the City, hosting major public events and celebrations and is the City's only dedicated downtown "exhibition" ground. It is also an important venue for trade and consumer shows, conferences and major sports and entertainment events. The CHLA provides a comperehensive assesssment of the heritage of Exhibition Place and its significance. Exhibition Place is home to a remarkable collection of heritage buildings set in a heritage landscape tracing its origin back to the original Provincial Exhibition. There are 18 listed or designated buildings on the site, many surrounded by unique landscaped open spaces which reflect the character and era of the buildings and structures they support. The site also includes interpretative installations, landmark entrances, commemorative and historical plaques and public art, as well as known archaeological resources and areas of archaeological potential. Exhibition Place has evolved over time, but it has sustained a dedicated focus on agricultural education and exhibition use. Through its architecture, designed landscapes and the axial planning that characterized the design of exhibition grounds across the continent in the early twentieth century, Exhibition Place remains a unique surviving example of this kind of cultural heritage landscape in North America. Over the years, a number of planning exrecises have focused on Exhibition Place, including some that have referenced a joint planning exercise with Ontario Place. Concurrently, new facilities such as Hotel X and the BMO Field have opened on the grounds. City staff have continued to work with the Exhibition Place Board of Governors and the Province on updated plans for Exhibition Place to identify opportunities and guide change. The Exhibition Place Master Plan and the Cultural Heritage Landscape Assessment will play a critical role in the continued evolution of Exhibition Place, including future business planning and decision making for this unique City-owned property. The Master Plan exercise will be informed by and coordinated with work on the new Exhibition Place Strategic Plan.
The Toronto and East York Community Council recommends that: 1. City Council adopt the recommendations of the Exhibition Place Cultural Heritage Landscape Assessment (CHLA) attached as Attachment 4 to the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District, and direct City Planning staff to utilize the Cultural Heritage Landscape Assessment and its recommendations in the development of the Exhibition Place Master Plan. 2. City Council direct City Planning staff to use the Cultural Heritage Landscape Assessment to inform more detailed study and to bring forward recommendation for inclusion of Exhibition Place as a "significant cultural heritage landscape" on the City's Heritage Register and/or designation under either Part IV or Part V of the Ontario Heritage Act. 3. City Council adopt the proposed Master Plan study framework as described in the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District to guide on-going work on the Master Plan. 4. City Council direct City Planning staff to undertake public consultations on the development of the Master Plan, including consultations with various stakeholder groups, the community at large and the Indigenous community. 5. City Council request the Province of Ontario to work jointly with the City on the revitalization of Ontario Place and develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 6. City Council forward a copy of the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District to the Board of Governors of Exhibition Place for its information and direct City Planning staff to work with the Exhibition Place Board of Governors to coordinate work on the Master Plan with development of the new Strategic Plan for Exhibition Place.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council adopt the recommendations of the Exhibition Place Cultural Heritage Landscape Assessment (CHLA) attached at Attachment 4 to the report dated April 10, 2019 from the Director, Community Planning, Toronto and East York District, and direct City Planning staff to utilize the CHLA and its recommendations in the development of the Exhibition Place Master Plan. 2. City Council direct City Planning staff to use the CHLA to inform more detailed study and to bring forward recommendation for inclusion of Exhibition Place as a "significant cultural heritage landscape" on the City's Heritage Register and/or designation under either Part IV or Part V of the Ontario Heritage Act. 3. City Council adopt the proposed Master Plan study framework as described in this report to guide on-going work on the Master Plan. 4. City Council direct City Planning staff to undertake public consultations on the development of the Master Plan, including consultations with various stakeholder groups, the community at large and the Indigenous community. 5. City Council request that the Province of Ontario work jointly with the City on the revitalization of Ontario Place and develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 6. City Council forward a copy of this report to the Board of Governors of Exhibition Place for its information and direct City Planning staff to work with the Exhibition Place Board of Governors to coordinate work on the Master Plan with development of the new Strategic Plan for Exhibition Place.
TE5.27amended
Opened in 1971, Ontario Place was envisioned as a "provincial showcase" of the Province's history, culture, economy and peoples. Inspired by Expo '67, the design was conceived by highly renowned Canadian designers Eberhard Zeidler (architecture) with Michael Hough (landscape architecture). Ontario Place has since been recognized internationally as an urban waterfront park and iconic part of Toronto's Central Waterfront. Due to declining attendance, the facility was partially closed in 2012 to consider redevelopment and a reimaging of Ontario Place. In 2014, the Minister's Special Advisory Panel on Ontario Place released a report based on a comprehensive, Province wide consultation process. The report recognized the importance of public access and retention of parkland with a dynamic mix of uses to re-establish Ontario Place as a waterfront destination. Building on this vision, Trillium Park and the William G. Davis Trail opened in 2017, followed by the reopening of a refurbished Cinesphere. According to some reports, these recent investments in Ontario Place provided a significant boost in attendance in recent years. On January 18, 2019, the Government of Ontario announced its intent to release an Expression of Interest (EOI) to seek development concepts for Ontario Place. The announcement outlined specific parameters for development. The provincial government's stated vision for Ontario Place is to create "a world-class year round destination that will attract local, provincial and international visitors - with potential landmarks such as sports and entertainment attractions and retail." In advance of the EOI's expected release in the spring of 2019, the Toronto and East York Community Council established a Subcommittee on Ontario Place in order to solicit feedback from the public regarding their views and thoughts on the future of Ontario Place, and on the principles that should inform the redevelopment of the site. The Subcommittee's first public meeting was held on March 5, 2019. This report: Summarizes the public deputations and communications received by the Subcommittee; Sets out principles to guide the City in its discussions with the Province regarding the revitalization of Ontario Place; Provides an update regarding the status of consultations with the Mississaugas of the Credit First Nation; Provides an update on the ongoing heritage evaluation of Ontario Place being undertaken by City staff; and Identifies opportunities to coordinate planning and urban design initiatives across Ontario Place and Exhibition Place, including the Exhibition Place Master Plan process. As the owner of the adjacent Exhibition Place, the City of Toronto has a long-standing interest in the future of Ontario Place. Together, these facilities form an important component of the waterfront. The City's interests in and vision for the future of both properties are described in the Central Waterfront Secondary Plan (CWSP). Since 2003, the Central Waterfront Secondary Plan has informed the City's position on the future of Ontario Place directly and indirectly in the form of four Core Principles as follows: 1. Removing Barriers/Making Connections; 2. Building a Network of Spectacular Waterfront Parks & Public Spaces; 3. Promoting a Clean & Green Environment; and 4. Creating Dynamic & Diverse New Communities. At the March 5, 2019 Subcommittee meeting on Ontario Place, the Director of Community Planning, Toronto and East York District provided a presentation on Ontario Place that summarized the historical and current context of the site. Approximately 34 speakers provided the subcommittee with their comments regarding the Province's initiative. The subcommittee also received 28 written submissions. City staff were directed to report back on the substance of the public's comments to the April 24, 2019 meeting of the Toronto and East York Community Council. City staff were also directed to: consult with the Mississaugas of the Credit First Nation on the development of principles for the revitalization of Ontario Place; evaluate the inclusion of the site into the City's Heritage Register; and consider opportunities for coordinated planning and urban design initiatives with Exhibition Place. In response to the Subcommittee's directions, this report provides a summary of six key themes heard at the March 5 meeting, as well as updates on the status of ongoing consultations. The six key themes are as follows: 1. Public Ownership and Access; 2. Establishing and Strengthening Connections; 3. Indigenous Representation; 4. Cultural and Landscape Heritage; 5. Establish a Mix of Non-Residential Uses; and 6. More Consultation Required. After assessing the feedback received from the public, City staff are of the view that the current Central Waterfront Secondary Plan Core Principles remain an appropriate framework to guide the revitalization of Ontario Place. It is recommended that these principles be refined and expanded to reflect Ontario Place's unique context and comments from the public. Furthermore, given the level of public interest in Ontario Place, as well as its proximity to Exhibition Place and the City's interest in coordinating planning and urban design initiatives between the two facilities, two additional principles related to governance and transparency are also recommended. The refined and expanded principles shown in Recommendation 1 of this report are intended to provide a framework for the City's ongoing consultations with stakeholders and continuing dialogue with the Province regarding the revitalization of Ontario Place. They are also intended to be read and interpreted within the context of the in-force Central Waterfront Secondary Plan. In terms of consultation, staff from the City's Indigenous Affairs Office have begun the process of discussions on the principles identified to date, including the preliminary principle that the City should seek the preservation of existing Indigenous place-making features (e.g. the Moccasin Identifier Project in Trillium Park) and identify future opportunities for appropriate recognition, celebration and commemoration. Consultations will continue with the Mississaugas of the Credit First Nation and, given the importance of the waterfront to many Indigenous communities and other interested parties on an ongoing basis. Heritage Preservation staff are in the process of preparing a report to include the property on the City's Heritage Register in accordance with the Subcommittee's direction. A separate report on Exhibition Place, summarizing the findings of the Cultural Heritage Landscape Assessment and next steps for the site's Master Planning exercise, will also be before the April 24th meeting of the Toronto and East York Community Council. A map showing Ontario Place is provided in Attachment 2 of this report.
The Toronto and East York Community Council recommends that: 1. City Council adopt the following Proposed Guiding Principles for the Revitalization of Ontario Place. Based on the Central Waterfront Secondary Plan (CWSP), the principles have been revised and expanded to reflect Ontario Place's unique context as well as feedback received from the public. The principles, as shown below, are intended to be read and interpreted in the context of the Central Waterfront Secondary Plan; a. Removing Barriers/Making Connections i. The City of Toronto should work jointly with the Province of Ontario on the integration of planning, programming and governance and consider rationalizing land ownership matters at Ontario Place and Exhibition Place in order to realize natural synergies between the two properties; and ii. Explore opportunities to reduce the barrier effect of Lake Shore Boulevard West between Exhibition Place and Ontario Place. iii. Ensure any future planning along Lake Shore Boulevard West is coordinated with a strategy to improve connectivity between the two properties, and provides a human-scaled edge to the popular Martin Goodman Trail; b. Building a Network of Spectacular Waterfront Parks and Public Spaces i. Secure and enhance public access for the full length of the Ontario Place shoreline. ii. Retain Trillium Park and the William Davis Trail as key place-making features at Ontario Place. iii. Explore low-impact recreational uses for the West Island shoreline; and iv. Consult with Indigenous peoples, including the Mississaugas of the Credit First Nation on opportunities to weave Indigenous placemaking into the fabric of Ontario Place; c. Promoting a Clean and Green Environment i. Utilize findings of the Council-endorsed Waterfront Transit Network Plan to improve access to, from and between Ontario Place and Exhibition Place. ii. Explore opportunities to consolidate large expanses of surface parking below grade in order to create a more walkable and transit-supportive environment; iii. Implement the City's draft biodiversity strategy, build on the success of Trillium Park, extend green corridors into Exhibition Place; and iv. Protect and strengthen the site's shoreline Natural Heritage features; d. Creating Dynamic and Diverse New Communities i. The City of Toronto should seek to partner with the Province of Ontario on a coordinated consultation strategy for the redevelopment of both Ontario Place and Exhibition Place. This should involve consultation with local, regional and provincial-wide stakeholders; and ii. Ontario Place should include a mix of non-residential uses and activities that reflect its waterfront location and rebuild its original goal of being a showcase and destination for Ontario; e. Openness and Transparency i. Make decisions through public process, with full transparency of the governance decision-making processes; f. Responsiveness to the Broader Community i. Conduct inclusive and meaningful consultations, including the City, Toronto residents, Indigenous peoples and the broader citizens of Ontario. Make decisions in the broader public interest. 2. City Council request the Province of Ontario to work jointly with the City on the revitalization of Ontario Place and to develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 3. City Council authorize the City Manager and the Deputy City Manager, Infrastructure and Development Services, in consultation with the Mayor, the Chair of the Ontario Place Subcommittee and the Chair of the Exhibition Place Board, to engage in discussions with the Province on a joint planning and public consultation process for the revitalization of Ontario Place and Exhibition Place, subject to the guiding principles adopted by City Council. 4. City Council require an open and transparent decision-making process with regard to evaluating proposals for the revitalization of Ontario Place, that includes public and stakeholder consultation and uses the guiding principles adopted by City Council, and request the City Manager and the Deputy City Manager, Infrastructure and Development Services to report back on details of any proposed evaluation plan before any evaluation process begins. 5. City Council forward a copy of the report (April 5, 2019) from the Director, Community Planning, Toronto and East York District to the Board of Governors of Exhibition Place for its information.
Staff recommendation as filed
The Director, Community Planning, Toronto and East York District recommends that: 1. City Council adopt the following Proposed Guiding Principles for the Revitalization of Ontario Place. Based on the Central Waterfront Secondary Plan (CWSP), the principles have been revised and expanded to reflect Ontario Place's unique context as well as feedback received from the public. The principles, as shown below, are intended to be read and interpreted in the context of the CWSP; a. Removing Barriers/Making Connections i. The City of Toronto should work jointly with the Province of Ontario on the integration of planning, programming and governance and consider rationalizing land ownership matters at Ontario Place and Exhibition Place in order to realize natural synergies between the two properties; and ii. Explore opportunities to reduce the barrier effect of Lake Shore Boulevard West between Exhibition Place and Ontario Place. iii. Ensure any future planning along Lake Shore Boulevard West is coordinated with a strategy to improve connectivity between the two properties, and provides a human-scaled edge to the popular Martin Goodman Trail; b. Building a Network of Spectacular Waterfront Parks and Public Spaces i. Secure and enhance public access for the full length of the Ontario Place shoreline. ii. Retain Trillium Park and the William Davis Trail as key place-making features at Ontario Place. iii. Explore low-impact recreational uses for the West Island shoreline; and iv. Consult with Indigenous peoples, including the Mississaugas of the Credit First Nation on opportunities to weave Indigenous placemaking into the fabric of Ontario Place; c. Promoting a Clean and Green Environment i. Utilize findings of the Council-endorsed Waterfront Transit Network Plan to improve access to, from and between Ontario Place and Exhibition Place. ii. Explore opportunities to consolidate large expanses of surface parking below grade in order to create a more walkable and transit-supportive environment; iii. Implement the City's draft biodiversity strategy, build on the success of Trillium Park, extend green corridors into Exhibition Place; and iv. Protect and strengthen the site's shoreline Natural Heritage features; d. Creating Dynamic and Diverse New Communities i. The City of Toronto should seek to partner with the Province of Ontario on a coordinated consultation strategy for the redevelopment of both Ontario Place and Exhibition Place. This should involve consultation with local, regional and provincial-wide stakeholders; and ii. Ontario Place should include a mix of non-residential uses and activities that reflect its waterfront location and rebuild its original goal of being a showcase and destination for Ontario; e. Openness and Transparency i. Make decisions through public process, with full transparency of the governance decision-making processes; f. Responsiveness to the Broader Community i. Conduct inclusive and meaningful consultations, including the City, Toronto residents, Indigenous peoples and the broader citizens of Ontario. Make decisions in the broader public interest. 2. City Council request that the Province of Ontario work jointly with the City on the revitalization of Ontario Place and develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 3. City Council authorize the City Manager and the Deputy City Manager of Infrastructure and Development Services to engage in discussions with the Province on a joint planning and public consultation process for the revitalization of Ontario Place and Exhibition Place. 4. City Council forward a copy of this report to the Board of Governors of Exhibition Place for its information.
TE5.28adopted
This report provides information, and identifies a preliminary set of issues regarding the development proposal to add a six-storey long-term care building at 150 Dunn Avenue. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the Zoning By-law Amendment application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 150 Dunn Avenue, together with the Ward Councillor. 2. Notice for the community consultation meeting is given to landowners and residents within 120 metres of the application site, and to additional residents, institutions, and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 150 Dunn Avenue, together with the Ward Councillor. 2. Notice for the community consultation meeting is given to landowners and residents within 120 metres of the application site, and to additional residents, institutions, and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.29amended
10-30 Dawes Road- Zoning By-law Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application for two residential towers located at 10-30 Dawes Road. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 10-30 Dawes Road together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 10-30 Dawes Road together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.30amended
1075 Bay Street - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application located at 1075 Bay Street for a 66-storey mixed-use building. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 1075 Bay Street, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. 3. The Director, Community Planning, Toronto and East York District and the applicant, in consultation with City Planning, Transportation Services, Parks, Forestry and Recreation and any other necessary City officials, to create a working group and to consult with the local community as part of the Site Plan process, including the local residents association and other stakeholders, on the following prior to the issuance of Final Site Plan Approval pursuant to Section 114 of the City of Toronto Act: a construction and traffic management plan, landscape and public realm plans, building materials and lighting, and other issues as identified by the Ward Councillor.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 1075 Bay Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.31amended
This report provides information and identifies a preliminary set of issues regarding the application located at 95 St. Joseph Street for a mixed-use building with 15- and 39-storey components. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 95 St. Joseph Street, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 95 St Joseph Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.32amended
This report provides information and identifies a preliminary set of issues regarding the application for an 18 storey seniors' residence located at 954-958 Broadview Avenue and 72 Chester Hill Road. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting to be held in May for the application located at 954-958 Broadview Avenue and 72 Chester Hill Road together with the Ward Councillor. 2. The community consultation notice be expanded beyond the 120 meters in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. 3. City Planning to meet with the Ward Councillor and representatives from the local residents associations including Helliwell Place, Playter and Chester Hill Cambridge Thorncliffe to identify their concerns and provide an opportunity for their feedback. 4. The Letter from the Heliwell Place Resident's Association (TESupp. 5.32.3) be referred to Community Planning Staff for consideration. 5. City Planning in consultation with the Ward Councillor convene a stakeholder committee to address local concerns.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 954-958 Broadview Avenue and 72 Chester Hill Road together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.33amended
78-90 Queen's Park - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application for a nine-storey institutional building located at 78-90 Queen's Park. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 78-90 Queen's Park together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 78-90 Queen's Park together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.34adopted
545 Lake Shore Boulevard West - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application for three mixed use buildings located at 545 Lake Shore Boulevard West. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. A community consultation meeting was held on March 19, 2019. Planning staff are of the opinion that the application in its current form is not supportable due to the overall building height and massing, proposed setbacks and the impacts on the heritage building and public realm.
The Toronto and East York Community Council directed: 1. Additional mailing costs resulting from an expanded notification area for the community consultation meeting held on March 19, 2019 beyond 120 metres from the site be borne by the applicant. 2. Staff continue to work with the applicant to address issues identified in this report including but not limited to heritage conservation, height, massing, setbacks and public realm enhancements.
Staff recommendation as filed
The City Planning Division recommends that: 1. Additional mailing costs resulting from an expanded notification area for the community consultation meeting held on March 19, 2019 beyond 120 metres from the site be borne by the applicant. 2. Staff continue to work with the applicant to address issues identified in this report including but not limited to heritage conservation, height, massing, setbacks and public realm enhancements.
TE5.35amended
193-201 Church Street - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application located at 193-201 Church Street. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 64-86 Bathurst Street, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. 3. The Director, Community Planning, Toronto and East York District and the applicant, in consultation with City Planning, Transportation Services, Parks, Forestry and Recreation and any other necessary City officials, to create a working group and to consult with the local community as part of the Site Plan process, including the local residents association and other stakeholders, on the following prior to the issuance of Final Site Plan Approval pursuant to Section 114 of the City of Toronto Act: a construction and traffic management plan, landscape and public realm plans, building materials and lighting, and other issues as identified by the Ward Councillor.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 193-201 Church Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.36amended
This report provides information and identifies a preliminary set of issues regarding the application for a mixed-use development located at 985 Woodbine Avenue and 2078, 2086, 2100, 2102 and 2106 Danforth. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 985 Woodbine Avenue and 2078, 2086, 2100, 2102 and 2106 Danforth together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 985 Woodbine Avenue and 2078, 2086, 2100, 2102 and 2106 Danforth together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.37amended
689 King Street West - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application located at 689 King Street West. Staff are currently reviewing the application, which has been circulated to all appropriate agencies and City divisions for comment. It is City Planning staff's opinion that the proposed building is not supportable in its current form due to its height, lack of setbacks and stepbacks, and transition to the surrounding context. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 689 King Street West, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 689 King Street West together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.38adopted
Construction Staging Area Time Extension - Bathurst Street - 578 Front Street West
As the Toronto Transit Commission (TTC) operates a transit service on Bathurst Street, City Council approval of this report is required. A mixed-use building consisting of four residential buildings is currently being constructed by Bathurst and Front Development Ltd. at the lands municipally known as 578 Front Street West. The site is bounded by Niagara Street to the north, existing residential uses (560 Front Street West) to the east, Front Street West to the south and Bathurst Street to the west. Temporary 30 day permits were provided by to the site during the election break of 2018. A construction staging area for the development has been setup within the east sidewalk and a portion of the northbound curb lane on Bathurst Street abutting the site. City Council, at its meeting on October 5, 2016, approved the subject construction staging area on Bathurst Street, from September 8, 2016 to July 31, 2018. 2018). Construction staging area for the development has been setup within the east sidewalk and a portion of the northbound curb lane on Bathurst Street abutting the site. City Council, at its meeting on October 5, 2016, approved the subject construction staging area on Bathurst Street, from September 8, 2016 to July 31, 2018. Transportation Services is requesting approval to extend the duration of the subject construction staging area for a period of 5 months (i.e. August 1, 2018 to December 31, 2018). Transportation Services is requesting this construction staging be extended from May 31, 2019 to June 30, 2019. The construction staging operations for the development also take place on the north side of Front Street West and south side of Niagara Street abutting the site. Matters related to the existing construction staging areas on Front Street West and Niagara Street will be discussed in a companion report "Construction Staging Area Time Extension - 578 Front Street West and Niagara Street" requiring Toronto and East York Community Council approval.
The Toronto and East York Community Council recommends that: 1. City Council approve the continuation of the closure of the east sidewalk and a portion of the northbound curb lane on Bathurst Street, between Front Street West and a point 71.0 metres north, from May 31, 2019 to June 30, 2019. 2. City Council approve the continuation of stopping prohibition at all times on the east side of Bathurst Street, between Front Street West and a point 87.5 metres north, from May 31, 2019 to June 30, 2019. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct Bathurst Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the continuation of the closure of the east sidewalk and a portion of the northbound curb lane on Bathurst Street, between Front Street West and a point 71.0 metres north, from May 31, 2019 to June 30, 2019. 2. City Council approve the continuation of stopping prohibition at all times on the east side of Bathurst Street, between Front Street West and a point 87.5 metres north, from May 31, 2019 to June 30, 2019. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct that Bathurst Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.39adopted
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. EllisDon Corporation is constructing a 17-storey institutional building at the lands located at 11 and 33 Centre Avenue and 80 Chestnut Street. The site is bounded by an existing commercial building (55 Centre Avenue and 108-110 Chestnut Street to the north, Chestnut Street to the east, Armoury Street to the south and Centre Avenue to the west. Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound lane on Centre Avenue and the west sidewalk and a portion of the southbound lane on Chestnut Street, for a period of 24 months to accommodate construction staging areas. Pedestrian movements will be accommodated within the closed curb lanes.
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 1.9 metre wide portion of the northbound curb lane on Centre Avenue, between Armoury Street and a point 102 metres north, from May 1, 2019 to May 1, 2021. 2. Authorized the closure of the west sidewalk and a 2.2 metre wide portion of the southbound curb lane on Chestnut Street, between Armoury Street and a point 67 metres north, from May 1, 2019 to May 1, 2021. 3. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the east side of Centre Avenue, between a point 39.6 metres north of Armoury Street and a point 115 metres north of Armoury Street. 4. Rescinded the existing parking prohibition in effect at all times on the east side of Centre Avenue, between Armoury Street and a point 39.6 metres north. 5. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 6. Rescinded the existing parking prohibition in effect at all times on the west side of Chestnut Street, between Armoury Street and a point 29 metres north. 7. Prohibited stopping at all times on the east side of Centre Avenue, between Armoury Street and a point 115 metres north. 8. Prohibited stopping at all times on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 9. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed Centre Avenue and Chestnut Street be returned to their pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 1.9 metre wide portion of the northbound curb lane on Centre Avenue, between Armoury Street and a point 102 metres north, from May 1, 2019 to May 1, 2021. 2. Toronto and East York Community Council authorize the closure of the west sidewalk and a 2.2 metre wide portion of the southbound curb lane on Chestnut Street, between Armoury Street and a point 67 metres north, from May 1, 2019 to May 1, 2021. 3. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the east side of Centre Avenue, between a point 39.6 metres north of Armoury Street and a point 115 metres north of Armoury Street. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Centre Avenue, between Armoury Street and a point 39.6 metres north. 5. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 6. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the west side of Chestnut Street, between Armoury Street and a point 29 metres north. 7. Toronto and East York Community Council prohibit stopping at all times on the east side of Centre Avenue, between Armoury Street and a point 115 metres north. 8. Toronto and East York Community Council prohibit stopping at all times on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 9. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community Council direct that Centre Avenue and Chestnut Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.40adopted
Construction Staging Area - 171 East Liberty Street
As the Toronto Transit Commission (TTC) operates a transit service on East Liberty Street, City Council approval of this report is required. A 28-storey condominium building is currently being constructed by Lifetime Developments at 171 East Liberty Street. The site is bounded by East Liberty Street to the north, existing commercial (Lifetime) property to the west, private laneways to the east and south. A construction staging area for the development will be set up within the south sidewalk and a portion of the eastbound lane on the south side of East Liberty Street abutting the site. A protected public walkway will be provided within a portion of the eastbound curb lane on East Liberty Street fronting the site. Transportation Services is requesting closure of a portion of the eastbound lane on East Liberty Street for construction staging for a period of 31 months, from May 15, 2019 to December 31, 2021.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the sidewalk and 3 metres of the curb lane on East Liberty Street between Lynn Williams Street and a point 102 metres east and the provision of a covered public sidewalk within the closed eastbound lane, from May 15, 2019 to December 31, 2021. 2. City Council rescind the existing standing prohibition in effect at all times on the south side of East Liberty Street, between Lynn Williams Street and a point 102 metres east from May 15, 2019 to December 31, 2021. 3. City Council prohibit stopping at all times on the south side of East Liberty Street between Lynn Williams Street and a point 102 metres east, from May 15, 2019 to December 31, 2021. 4. City Council direct the applicant to posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. City Council direct the applicant to work with STEPS Initiative to provide and install public art including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. City Council direct that East Liberty Street be returned to its pre-construction when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council approve the closure of the sidewalk and 3 metres of the curb lane on East Liberty Street between Lynn Williams Street and a point 102 metres east and the provision of a covered public sidewalk within the closed eastbound lane, from May 15, 2019 to December 31, 2021. 2. City Council rescind the existing standing prohibition in effect at all times on the south side of East Liberty Street, between Lynn Williams Street and a point 102 metres east from May 15, 2019 to December 31, 2021. 3. City Council prohibit stopping at all times on the south side of East Liberty Street between Lynn Williams Street and a point 102 metres east, from May 15, 2019 to December 31, 2021. 4. City Council direct the applicant to posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. City Council direct the applicant to work with STEPS Initiative to provide and install public art including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. City Council direct that East Liberty Street be returned to its pre-construction when the project is complete.
TE5.41adopted
Construction Staging Area Time Extension - 578 Front Street West and Niagara Street
This staff report is also about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. A mixed-use building consisting of four residential buildings is currently being constructed, by Bathurst and Front Development Ltd. at the lands municipally known as 578 Front Street West. The site is bounded by Niagara Street to the north, existing residential uses, 560 Front Street West to the east, Front Street West to the south and Bathurst Street to the west. Temporary 30 day permits were provided by to the site during the election break of 2018. Construction staging areas for the development have been setup within the north sidewalk and a portion of the westbound curb lane on Front Street West and the south sidewalk and a portion of the eastbound lane on Niagara Street abutting the site. Toronto and East York Community Council, at its meeting on September 7, 2016, approved the subject construction staging areas on Front Street West and Niagara Street, from September 8, 2016 to July 31, 2018 and from September 8, 2016 to October 31, 2018, respectively. Transportation Services is requesting approval to extend the duration of the existing construction staging area on Front Street West from May 31, 2019 to June 30, 2019. Also, approval is being requested to extend the duration of the existing construction staging area on Niagara Street from May 31, 2019 to June 30, 2019. A construction staging area for the development has also been setup within the east sidewalk and a portion of the northbound curb lane on Bathurst Street abutting the site. Matters related to the existing construction staging on Bathurst Street will be discussed in a companion report, Bathurst Street, 578 Front Street West, requiring City Council approval. City Council, at its meeting on October 5, 2016, approved the subject construction staging area on Bathurst Street, from September 8, 2016 to July 31, 2018. 2018. Consequently, the duration of the existing construction staging on Bathurst Street has been requested to be extended from May 31, 2019 to June 30, 2019.
The Toronto and East York Community Council: 1. Approved the continuation of the closure of the north sidewalk and a portion of the westbound curb lane on Front Street West, between Bathurst Street and a point 114.9 metres further east, from June 1, 2019 to June 30, 2019. 2. Approved the continuation of the closure of the south sidewalk and a portion of the curb lane on Niagara Street, between Bathurst Street and a point 102 metres east, from June 1, 2019 to June 30, 2019. 3. Approved the continuation of the stopping prohibition in effect at all times on both side of Front Street West, between Bathurst Street and a point 129.5 metres east, from June 1, 2019 to June 30, 2019. 4. Approved the continuation of the stopping prohibition in effect at all times on both sides of Niagara Street, between Bathurst Street and a point 118 metres east, from June 1, 2019 to June 30, 2019. 5. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed the applicant to continue securing off-street parking spaces in sufficient number to replace the on-street permit parking spaces that were displaced by these construction staging areas. 8. Directed the applicant to continue making the replacement spaces available to all 6E on-street parking permit holders, and prominently posting directions for permit holders at the location of the displaced on-street spaces. 9. Directed that Front Street West be returned to its pre-construction traffic and parking regulations when the project is complete. 10. Directed that Niagara Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the continuation of the closure of the north sidewalk and a portion of the westbound curb lane on Front Street West, between Bathurst Street and a point 114.9 metres further east, from June 1, 2019 to June 30, 2019. 2. Toronto and East York Community Council approve the continuation of the closure of the south sidewalk and a portion of the curb lane on Niagara Street, between Bathurst Street and a point 102 metres east, from June 1, 2019 to June 30, 2019. 3. Toronto and East York Community Council approve the continuation of the stopping prohibition in effect at all times on both side of Front Street West, between Bathurst Street and a point 129.5 metres east, from June 1, 2019 to June 30, 2019. 4. Toronto and East York Community Council approve the continuation of the stopping prohibition in effect at all times on both sides of Niagara Street, between Bathurst Street and a point 118 metres east, from June 1, 2019 to June 30, 2019. 5. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct the applicant to continue securing off-street parking spaces in sufficient number to replace the on-street permit parking spaces that were displaced by these construction staging areas. 8. Toronto and East York Community Council direct the applicant to continue making the replacement spaces available to all 6E on-street parking permit holders, and prominently posting directions for permit holders at the location of the displaced on-street spaces. 9. Toronto and East York Community Council direct that Front Street West be returned to its pre-construction traffic and parking regulations when the project is complete. 10. Toronto and East York Community Council direct that Niagara Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.42adopted
Construction Staging Area - 321-333 King Street West
As the Toronto Transit Commission (TTC) operates a transit service on King Street West, City Council approval of this report is required. Empire Communities is constructing a 49-storey residential condominium building at 321-333 King Street West, located on the south side of King Street West between John Street and Blue Jays Way. Transportation Services is requesting approval to close the sidewalk and curb lane on the south side of King Street West for a period of 25 months in order to enable construction of the above mentioned development. Pedestrian operations will be maintained within the closed portion of the existing curb lane on King Street West.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the south sidewalk on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 2. City Council approve the closure of the south curb lane on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 3. City Council rescind the designated taxi cab stand on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 4. City Council prohibit stopping at all times on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct King Street West be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council approve the closure of the south sidewalk on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 2. City Council approve the closure of the south curb lane on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 3. City Council rescind the designated taxi cab stand on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 4. City Council prohibit stopping at all times on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct that King Street West be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
TE5.43adopted
Construction Staging Area - 497-511 Richmond Street West - Maud Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City policy or by-laws. A 13-storey condominium is being constructed by MOD Developments at 497-511 Richmond Street West located in the south-east quadrant of Richmond Street West and Maud Street. Transportation Services is requesting approval to close the east sidewalk on Maud Street adjacent to this site to facilitate construction operations for a period of 21 months. Pedestrians will be directed to use the west sidewalk on Maud Street.
The Toronto and East York Community Council: 1. Approved the closure of the east sidewalk on Maud Street, between Richmond Street West and Adelaide Street West, from May 1, 2019 to December 31, 2020. 2. Rescinded the existing standing prohibition in effect at all times on both sides of Maud Street, between a point 16 metres south of Richmond Street West and a point 60 metres further south. 3. Rescinded the existing parking prohibition in effect at all times on both sides of Maud Street, between Richmond Street West and Adelaide Street West. 4. Prohibited "Stopping" at all times on both the both sides of Maud Street, from Richmond Street West to Adelaide Street West. 5. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed Maud Street be returned to its pre-construction conditions when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the east sidewalk on Maud Street, between Richmond Street West and Adelaide Street West, from May 1, 2019 to December 31, 2020. 2. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on both sides of Maud Street, between a point 16 metres south of Richmond Street West and a point 60 metres further south. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on both sides of Maud Street, between Richmond Street West and Adelaide Street West. 4. Toronto and East York Community Council prohibit "Stopping" at all times on both the both sides of Maud Street, from Richmond Street West to Adelaide Street West. 5. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct that Maud Street be returned to its pre-construction conditions when the project is completed.
TE5.44amended
Construction Staging Area - Cumberland Street - 826-834 Yonge Street and 2-8 Cumberland Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City policy or by-laws. Great Gulf is constructing a 51-storey residential condominium building at 826-834 Yonge Street and 2-8 Cumberland Street. The site is bounded by existing residential condominium building (1 Yorkville Avenue) to the north, Yonge Street to the east, Cumberland Street to the south and existing commercial buildings (12-14 Cumberland Street) to the west. The development is currently in progress, operating under a monthly Street Occupation Permit. Transportation Services is requesting approval to close the sidewalk and a portion of the eastbound lane on the north side of Cumberland Street for a period of 42 months to enable construction of the above mentioned development.
The Toronto and East York Community Council: 1. Authorized the closure of the north sidewalk and the occupation of a portion of the eastbound curb lane on Cumberland Street, between Yonge Street and a point 52 metres west, May 1, 2019 to October 31, 2022. 2. Rescinded the existing parking machine regulation in effect from 4:00 p.m. to 12:00 a.m., Monday to Friday; 8:00 a.m. to 6:00 p.m. Saturday; 6:00 p.m. to 12:00 a.m. Saturday; and 10:00 a.m. to 12:00 a.m. Sunday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 3. Rescinded the existing commercial loading zone in effect from 6:00 a.m. to 4:00 p.m., Monday to Friday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 4. Prohibited stopping at all times on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 5. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed that Cumberland Street be returned to its pre-construction traffic and parking regulations when the project is complete. 8. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the north sidewalk and the occupation of a portion of the eastbound curb lane on Cumberland Street, between Yonge Street and a point 52 metres west, May 1, 2019 to October 31, 2022. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 4:00 p.m. to 12:00 a.m., Monday to Friday; 8:00 a.m. to 6:00 p.m. Saturday; 6:00 p.m. to 12:00 a.m. Saturday; and 10:00 a.m. to 12:00 a.m. Sunday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 3. Toronto and East York Community Council rescind the existing commercial loading zone in effect from 6:00 a.m. to 4:00 p.m., Monday to Friday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 4. Toronto and East York Community Council prohibit stopping at all times on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 5. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct that Cumberland Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.45adopted
Construction Staging Area - Elizabeth Street and Elm Street - 175 Elizabeth Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. PCL Constructors is constructing a 22-storey building for institutional use at 175 Elizabeth Street, also commonly known as "Sick Kids Patient Support Centre". The site is bounded by Walton Street to the north, industrial use building - 85 Walton Street, a research and education building - 72-78 Elm Street and 675 Bay Street - to the east, Elm Street to the south and Elizabeth Street to the west. Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound lane on Elizabeth Street and the north sidewalk and a portion of the westbound lane on Elm Street for a period of 41 months to accommodate construction staging areas. Pedestrian movements will be accommodated within the closed curb lanes.
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 4.0 metre wide portion of the northbound curb lane on Elizabeth Street, between Walton Street and Elm Street, from May 1, 2019 to September 30, 2022. 2. Authorized the closure of the north sidewalk and a 5.2 metre wide portion of the westbound curb lane on Elm Street, between Elizabeth Street and a point 41 metres east, from May 1, 2019 to September 30, 2022. 3. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 3:30 p.m. and 6:30 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m., Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 4. Rescinded the existing parking prohibition in effect from 3:30 p.m. to 6:30 p.m. Monday to Friday, except public holidays, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 5. Rescinded the existing parking prohibition in effect at all times, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 6. Rescinded the existing stopping prohibition in from 3:30 p.m. to 6:30 p.m., Monday to Friday, except public holidays, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 7. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the east side of Elizabeth Street, between Elm Street and Walton Street. 8. Rescinded the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Elm Street and a point 9 metres north. 9. Rescinded the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Walton Street and a point 9 metres south. 10. Rescinded the existing maximum one-hour parking limit in effect from 8:00 a.m. to 6:00 p.m., daily, on the west side of Elizabeth Street, between Elm Street and Gerrard Street West. 11. Rescinded the existing standing prohibition in effect at all times on the west side Elizabeth Street, between Elm Street and Walton Street. 12. Prohibited stopping at all times on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 13. Prohibited stopping at all times on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 14. Prohibited stopping at all times on both sides of Elizabeth Street, between Elm Street and Walton Street. 15. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. Directed Elizabeth Street (except fpr maximum one-hour parking) and Elm Street be returned to pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 4.0 metre wide portion of the northbound curb lane on Elizabeth Street, between Walton Street and Elm Street, from May 1, 2019 to September 30, 2022. 2. Toronto and East York Community Council authorize the closure of the north sidewalk and a 5.2 metre wide portion of the westbound curb lane on Elm Street, between Elizabeth Street and a point 41 metres east, from May 1, 2019 to September 30, 2022. 3. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 3:30 p.m. and 6:30 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m., Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect from 3:30 p.m. to 6:30 p.m. Monday to Friday, except public holidays, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 5. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 6. Toronto and East York Community Council rescind the existing stopping prohibition in from 3:30 p.m. to 6:30 p.m., Monday to Friday, except public holidays, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 7. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the east side of Elizabeth Street, between Elm Street and Walton Street. 8. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Elm Street and a point 9 metres north. 9. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Walton Street and a point 9 metres south. 10. Toronto and East York Community Council rescind the existing maximum one-hour parking limit in effect from 8:00 a.m. to 6:00 p.m., daily, on the west side of Elizabeth Street, between Elm Street and Gerrard Street West. 11. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the west side Elizabeth Street, between Elm Street and Walton Street. 12. Toronto and East York Community Council prohibit stopping at all times on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 13. Toronto and East York Community Council prohibit stopping at all times on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 14. Toronto and East York Community Council prohibit stopping at all times on both sides of Elizabeth Street, between Elm Street and Walton Street. 15. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. Toronto and East York Community Council direct that Elizabeth Street (except fpr maximum one-hour parking) and Elm Street be returned to pre-construction traffic and parking regulations when the project is complete.
TE5.46amended
Construction Staging Area - 75 The Esplanade - Church Street
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. Transportation Services is requesting approval to close the west sidewalk and curb lane on Church Street for a period of 16 months. Harhay Construction Management Ltd. is building a 29-storey condominium with a total of 308 units, together with ground floor retail and three level underground parking. The site is located on the West side of Church Street, between The Esplanade on the north side and a private lane on the south side. To enable construction, the applicant requires the aforementioned closures.
The Toronto and East York Community Council: 1. Approved the closure of the west sidewalk and southbound parking lane on Church Street, from The Esplanade and a point 49 metres further south of Church Street, from April 29, 2019 to August 31, 2020. 2. Rescinded the existing parking prohibition in effect at all times on the east side of Church Street, from The Esplanade to the south end of Church Street. 3. Rescind the existing parking prohibition in effect at all times on the west side of Church Street, from The Esplanade to a point 30.5 metres south and from a point 41.5 metres south of The Esplanade to the south end of Church Street. 4. Rescinded the existing car-share vehicle parking area on the west side of Church Street, from a point 30.5 metres south of The Esplanade to a point 11 metres further south (see below for agreement with Enterprise CarShare) 5. Prohibited stopping at all times on both sides of Church Street, from the Esplanade to the south end of Church Street. 6. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Directed that Church Street be returned to its pre-construction traffic regulations when the project is completed. 9. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 10. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 12. In areas where no cycling lanes exist, directed the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 13. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 14. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 15. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 16. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Building, adjacent neighbours, local resident groups, and local BIAs. 17. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the west sidewalk and southbound parking lane on Church Street, from The Esplanade and a point 49 metres further south of Church Street, from April 29, 2019 to August 31, 2020. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Church Street, from The Esplanade to the south end of Church Street. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the west side of Church Street, from The Esplanade to a point 30.5 metres south and from a point 41.5 metres south of The Esplanade to the south end of Church Street. 4. Toronto and East York Community Council rescind the existing car-share vehicle parking area on the west side of Church Street, from a point 30.5 metres south of The Esplanade to a point 11 metres further south (see below for agreement with Enterprise CarShare) 5. Toronto and East York Community Council prohibit stopping at all times on both sides of Church Street, from the Esplanade to the south end of Church Street. 6. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Toronto and East York Community direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Toronto and East York Community direct that Church Street be returned to its pre-construction traffic regulations when the project is completed.
TE5.47adopted
Construction Staging Area Time Extension - Church Street - 70-72 Carlton Street
Tribute Communities is constructing a 41-storey mixed-use development at 70-72 Carlton Street and 403 Church Street. The site is located in the north-east quadrant of Carlton Street and Church Street. The sidewalk and a portion of the northbound curb lane on the east side of Church Street fronting the site are currently closed to accommodate construction staging operations for the development. Toronto and East York Committee Council, at its meeting on May 2, 2017, approved the subject construction staging area on Church Street, from June 1, 2017 to May 31, 2019. Transportation Services is requesting approval to extend the duration of the construction staging area on Church Street for an additional 18 months (i.e. from June 1, 2019 to November 30, 2020), in order to complete the construction of the development. The developer has requested an extension of the duration of the construction staging area on Church Street, in order to complete the construction of the development. Based on the information provided by the developer, site has experienced a number of construction delays due to inclement weather and an extended amount of time redesigning the substructure and construction four additional levels.
The Toronto and East York Community Council: 1. Approved the continuation of the closure of the sidewalk and the northbound curb lane on Church Street, between Carlton Street and a point 50.5 metres north, from June 1, 2019 to November 30, 2020. 2. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Directed Church Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the continuation of the closure of the sidewalk and the northbound curb lane on Church Street, between Carlton Street and a point 50.5 metres north, from June 1, 2019 to November 30, 2020. 2. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Toronto and East York Community Council direct that Church Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.48amended
Construction Staging Area - Dalhousie Street - 215-229 Church Street and 117 Dundas Street East
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Sentinel (Church) Holdings Inc. is constructing a 52-storey mixed-use development at 215-229 Church Street and 117 Dundas Street East. The site is located in the south-east corner of Dundas Street East and Church Street. Transportation Services is requesting approval to close the sidewalk and a portion of the southbound lane on the west side of Dalhousie Street for a period of 48 months. In addition, approval is requested to temporarily convert a section of Dalhousie Street abutting the site from a two-way traffic operation to a one-way northbound traffic operation.
The Toronto and East York Community Council: 1. Authorized the closure of the west sidewalk and a 2.8 metre wide portion of the southbound lane on Dalhousie Street, between Dundas Street East and a point 54 metres south, from May 1, 2019 to April 30, 2023. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and 1:00 p.m. to 9:00 p.m., Sunday on the east side of Dalhousie Street, between a point 33.5 metres south of Dundas Street East and a point 42 metres further south. 3. Rescinded the existing standing prohibition in effect at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south. 4. Rescinded the existing standing prohibition in effect at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 5. Amended the existing one-way traffic operation on Dalhousie Street, between Shuter Street and a point 52 metres north to be in effect from Shuter Street to Dundas Street East. 6. Prohibited stopping at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 7. Prohibited stopping at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south 8. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 9. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 10. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 12. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 13. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 14. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 15. Directed that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 16. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. In areas where no cycling lanes exist, direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 18. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 19. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the west sidewalk and a 2.8 metre wide portion of the southbound lane on Dalhousie Street, between Dundas Street East and a point 54 metres south, from May 1, 2019 to April 30, 2023. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and 1:00 p.m. to 9:00 p.m., Sunday on the east side of Dalhousie Street, between a point 33.5 metres south of Dundas Street East and a point 42 metres further south. 3. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south. 4. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 5. Toronto and East York Community Council amend the existing one-way traffic operation on Dalhousie Street, between Shuter Street and a point 52 metres north to be in effect from Shuter Street to Dundas Street East. 6. Toronto and East York Community Council prohibit stopping at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 7. Toronto and East York Community Council prohibit stopping at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south 8. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 9. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 10. Toronto and East York Community Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 12. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 13. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 14. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 15. Toronto and East York Community Council direct that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.49amended
Construction Staging Area - 177 Front Street East
As the Toronto Transit Commission (TTC) operates a transit service on Princess Street City Council approval of this report is required. Saddlebrook Management Consultants Inc., is constructing a 30-storey mix-use condominium building with 1531 units, with one level underground parking facility at 177 Front Street East. The site is bounded by The Esplanade to the south, Front Street East to the north, Princess Street to the east and Lower Sherbourne Street to the west. Transportation Services is requesting approval to close the sidewalk and the southbound parking lane on the west side of Princess Street for a period of 47 months. Pedestrian movements will be accommodated on the east side of Princess Street as there are no pedestrian generators on the west side.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the sidewalk and the southbound parking lane on the west side of Princess Street from Front Street East to 20 metres north of The Esplanade, from March 29, 2019 to January 31, 2023. 2. City Council rescind the existing permit parking regulation in effect from 2:00 a.m. to 7:00 a.m. on the (even side) west side of Princess Street, from The Esplanade to Front Street East. 3. City Council rescind the existing two-hour maximum parking limit in effect from 8:00 a.m. to 6:00 p.m. on the (even side) west side of Princess Street from The Esplanade to Front Street East. 4. City Council rescind the existing parking machine regulation in effect for, 8:00 a.m. to 9:00 p.m., and from Monday to Saturday; 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Princess Street, between Front Street East and The Esplanade. 5. City Council prohibit stopping at all times on the west side of Princess Street, from Front Street East to The Esplanade. 6. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. City Council direct Princess Street be returned to its pre-construction parking regulations when the project is completed. 14. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 15. In areas where no cycling lanes exist, City Council direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 16. City Council direct the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 17. City Council direct the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the closure of the sidewalk and the southbound parking lane on the west side of Princess Street from Front Street East to 20 metres north of The Esplanade, from March 29, 2019 to January 31, 2023. 2. City Council rescind the existing permit parking regulation in effect from 2:00 a.m. to 7:00 a.m. on the (even side) west side of Princess Street, from The Esplanade to Front Street East. 3. City Council rescind the existing two-hour maximum parking limit in effect from 8:00 a.m. to 6:00 p.m. on the (even side) west side of Princess Street from The Esplanade to Front Street East. 4. City Council rescind the existing parking machine regulation in effect for, 8:00 a.m. to 9:00 p.m., and from Monday to Saturday; 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Princess Street, between Front Street East and The Esplanade. 5. City Council prohibit stopping at all times on the west side of Princess Street, from Front Street East to The Esplanade. 6. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. City Council direct that Princess Street be returned to its pre-construction parking regulations when the project is completed.
TE5.50amended
Construction Staging Area - 65 King Street East - Colborne Street, Leader Lane
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. PCL Constructors Canada Inc. (Toronto) will redevelop the lands located at the municipal addresses of 65-89 King Street East and 46 Colborne Street. The site is located in the south-east quadrant of King Street East and Leader Lane. Existing commercial buildings located at the site and fronting onto King Street East are designated heritage structures. The heritage facades of the existing buildings will be preserved as part of the development proposal. A façade retention steel structure has been installed externally to support the heritage facades while building structure behind the retained facades is reconstructed. Transportation Services is requesting approval to close the north sidewalk and west bound curb lane on Colborne Street and the east sidewalk and portion of the curb lane on Leader Lane for a period of 20 months. (Start date to be confirmed at a later date due to ongoing ECS Water Main Project) with an ending date of December 31, 2020. PCL will not be allowed to occupy Colborne Street until the ECS project has been completed. The construction staging area closure in the curb lane ( north side) of Colborne Street will result in removal of the existing all parking on the south side of Colborne Street from Leader lane to Church Street. Pedestrians will also be directed to walk on the south side sidewalk due to closure of north side sidewalk. Leader Lane will be reduced to one south bound lane and the west side sidewalk will remain open for pedestrians from King Street East to Colborne Street due to east side sidewalk and lane width reduction.
The Toronto and East York Community Council: 1. Approved the closure of the north sidewalk and a 4 metre wide portion of the westbound lane (north side) on Colborne Street, from a point 50 metres west of Church Street to a point 43 metres further west, until December 31, 2020. 2. Rescinded the parking prohibition in effect at all times on the north side of Colborne Street, from Leader Lane to Church Street. 3. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m. Monday to Saturday; 1:00 p.m. to 9:00 p.m. Sunday on the south side of Colborne Street, from Leader Lane to Church Street. 4. Rescinded the existing stopping prohibition in effect at all times on the north side of Colborne Street, from Church Street to a point 49.2 metres west and on the south side of Colborne Street, from Church Street to Colborne Lane. 5. Prohibited stopping at all times on both sides of Colborne Street, between Leader Lane and Church Street. 6. Approved the closure of the east sidewalk and a 1.3 metres wide portion of the southbound lane (east side) on Leader Lane, from King Street East to a point 43 metres further west, until December 31, 2020. 7. Rescinded the existing Commercial Loading Zone on the west side of Leader Lane between and a point 30.5 metres south of King Street East and Colborne Street. 8. Prohibited standing at all times on the west side of Leader Lane, from a point approximately 30.5 metres south of King Street East to Colborne Street. 9. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed that Colborne Street and Leader Lane be returned to pre-construction traffic regulations when the project is completed. 12. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 13. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 14. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 15. In areas where no cycling lanes exist, direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 16. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 17. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 18. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 19. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 20. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the north sidewalk and a 4 metre wide portion of the westbound lane (north side) on Colborne Street, from a point 50 metres west of Church Street to a point 43 metres further west, until December 31, 2020. 2. Toronto and East York Community Council rescind the parking prohibition in effect at all times on the north side of Colborne Street, from Leader Lane to Church Street. 3. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m. Monday to Saturday; 1:00 p.m. to 9:00 p.m. Sunday on the south side of Colborne Street, from Leader Lane to Church Street. 4. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the north side of Colborne Street, from Church Street to a point 49.2 metres west and on the south side of Colborne Street, from Church Street to Colborne Lane. 5. Toronto and East York Community Council prohibit stopping at all times on both sides of Colborne Street, between Leader Lane and Church Street. 6. Toronto and East York Community Council approve the closure of the east sidewalk and a 1.3 metres wide portion of the southbound lane (east side) on Leader Lane, from King Street East to a point 43 metres further west, until December 31, 2020. 7. Toronto and East York Community Council rescind the existing Commercial Loading Zone on the west side of Leader Lane between and a point 30.5 metres south of King Street East and Colborne Street. 8. Toronto and East York Community Council prohibit standing at all times on the west side of Leader Lane, from a point approximately 30.5 metres south of King Street East to Colborne Street. 9. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community direct that Colborne Street and Leader Lane be returned to pre-construction traffic regulations when the project is completed.