Toronto and East York Community Council
The full agenda, as filed
All 90 items in the clerk’s order. Each carries the city’s own words: the staff recommendation, what the body decided, and its status. Nothing below is written by us.
TE5.1adopted
This report recommends that the name "Galipo Brothers Lane" be approved to identify an existing public lane located north of College Street, extending between Crawford Street and Montrose Street. Community Councils have delegated authority to decide street naming matters which comply with the City of Toronto Street Naming Policy.
The Toronto and East York Community Council: 1. Approved the name "Galipo Brothers Lane" for an existing public lane located north of College Street, extending between Crawford Street and Montrose Street.
Staff recommendation as filed
Engineering and Construction Services recommends that Toronto and East York Community Council: 1. Approve the name "Galipo Brothers Lane" for an existing public lane located north of College Street, extending between Crawford Street and Montrose Street.
TE5.2adopted
The Palmerston Area Residents Association recently requested the naming of 8 existing public lanes bounded by Harbord Street, Markham Street, College Street and Grace Street. At its meeting on February 14, 2019, Toronto and East York Community Council adopted Item TE3.1 which named 7 of these lanes. The 8th lane was not named at that meeting because proper consent had not yet been provided for this name. Consent has since been received, and this report recommends that the name "Jewish Folk Choir Lane" be approved to identify the remaining existing public lane. Community Councils have delegated authority to decide street naming matters which comply with the City of Toronto Street Naming Policy.
The Toronto and East York Community Council: 1. Approved the name "Jewish Folk Choir Lane" for the existing public lane bounded by Harbord Street, Palmerston Boulevard, Ulster Street and Euclid Avenue.
Staff recommendation as filed
Engineering and Construction Services recommends that Toronto and East York Community Council: 1. Approve the name "Jewish Folk Choir Lane" for the existing public lane bounded by Harbord Street, Palmerston Boulevard, Ulster Street and Euclid Avenue.
TE5.3adopted
Renaming of a Portion of Pears Avenue, Extending West of Yonge Street
This report recommends approval of the renaming of a portion of Pears Avenue, west of Yonge Street to "Basil Johnston Terrace" Community Councils have delegated authority to decide street naming matters which comply with the City of Toronto Street Naming Policy.
The Toronto and East York Community Council: 1. Approved the name "Basil Johnston Terrace" for the renaming of a portion of Pears Avenue, west of Yonge Street.
Staff recommendation as filed
Engineering and Construction Services recommends that Toronto and East York Community Council: 1. Approve the name "Basil Johnston Terrace" for the renaming of a portion of Pears Avenue, west of Yonge Street.
TE5.4adopted
Naming of an Existing Public Lane West of Yonge Street, Extending North from Wellesley Street West
This report recommends that the name "Bistro Lane" be approved to identify an existing public lane located west of Yonge Street, extending north from Wellesley Street West. Community Councils have delegated authority to decide street naming matters which comply with the City of Toronto Street Naming Policy.
The Toronto and East York Community Council: 1. Approved the name "Bistro Lane" for an existing public lane located west of Yonge Street, extending north from Wellesley Street West.
Staff recommendation as filed
Engineering and Construction Services recommends that Toronto and East York Community Council: 1. Approve the name "Bistro Lane" for an existing public lane located west of Yonge Street, extending north from Wellesley Street West.
TE5.5deferred
This zoning amendment application proposes an eight-storey building with 1,658 square metres of retail/commercial space at-grade and 112 residential units above at 871-899 College Street. A total of 61 parking spaces and 146 bicycle parking spaces are proposed within a one-level underground garage accessed from the rear lane. The proposed building would have a density of 4.34 times the area of the lot. The Rental Housing Demolition application under Chapter 667 of the Toronto Municipal Code (Section 111 of the City of Toronto Act) proposes to demolish two existing residential rental apartment buildings containing a total of 13 rental dwelling units and provide replacement of all 13 rental dwelling units within the proposed building. The proposed development is consistent with the Provincial Policy Statement (2014) and conforms with the Growth Plan for the Greater Golden Horseshoe (2017). The proposal represents an appropriate redevelopment of the site and presents a built form and public realm that is compatible with the surrounding context. The massing of the building has been revised to provide a better transition to its neighbours, and the landscaping has been revised for consistency with the local BIA streetscape plan. This report reviews and recommends approval of the Zoning By-law Amendment and Rental Housing Demolition Applications.
The Toronto and East York Community Council adjourned the public meeting for 871-899 College Street Zoning Amendment Application and Rental Housing Demolition Applications - Final Report, until May 22, 2019 at 10:00 a.m.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 438-86, for the lands at 871-899 College Street substantially in accordance with the draft Zoning By-law Amendment attached as Attachment 5 to this report. 2. City Council amend City of Toronto Zoning By-law 569-2013 for the lands at 871-899 College Street substantially in accordance with the draft Zoning By-law Amendment attached as Attachment 6 to this report. 3. City Council approve the application for a Rental Housing Demolition permit in accordance with Chapter 667 of the Toronto Municipal Code to allow for the demolition of thirteen (13) existing rental dwelling units located at 871 and 899 College Street, subject to the following conditions: a. The owner shall provide and maintain thirteen (13) replacement rental dwelling units, comprising two (2) bachelor units, five (5) one-bedroom units, five (5) two-bedroom units and one (1) three-bedroom unit, on the subject site for a period of at least twenty (20) years beginning from the date that each such replacement dwelling unit is first occupied and as generally shown on the plans submitted to the City Planning dated January 16, 2019; any revision to these plans must be to the satisfaction of the Chief Planner and Executive Director, City Planning; b. The owner shall as part of the thirteen (13) replacement rental dwelling units required above provide at least two (2) bachelor, four (4) one-bedroom, five (5) two-bedroom, and one (1) three-bedroom replacement rental dwelling units at affordable rents, and at least one (1) one-bedroom, replacement rental dwelling unit at mid-range rent for a period of at least ten (10) years, beginning from the date of first occupancy; c. The owner shall provide and maintain one (1) market rental dwelling unit, numbered as Unit 210, on the subject site for a period of at least twenty (20) years beginning from the date that each such dwelling unit is first occupied, and as generally shown on the plans submitted to the City Planning Division dated January 16, 2019; any revision to these plans must be to the satisfaction of the Chief Planner and Executive Director, City Planning; d. The owner shall provide and maintain an additional seventy-five (75) market rental dwelling units on the subject site for a period of at least ten (10) years beginning from the date that each such dwelling unit is first occupied, as generally shown on the plans submitted to the City Planning dated January 16, 2019 for the second floor plan, and November 1, 2018 for the rest of the building; any revision to these plans must be to the satisfaction of the Chief Planner and Executive Director, City Planning; e. The owner shall provide and maintain a common laundry room on the second floor which shall be equipped with at least six (6) washers and six (6) dryers as generally illustrated in the plans submitted to the City on January 16, 2019; f. The owner shall provide tenants of the replacement rental dwelling units with access to all indoor and outdoor amenities on the site at no extra charge. Access and use of these amenities shall be on the same terms and conditions as any other building resident; g. The owner shall provide a minimum of two (2) vehicle parking spaces that will be made available for rent to tenants of the replacement rental dwelling units; h. The owner shall provide at least three (3) of the replacement rental dwelling units with a balcony or terrace; i. The owner shall provide tenants of the replacement rental dwelling units with access to all bicycle parking and visitor parking on the same terms and conditions as any other resident of the building; j. The owner shall provide tenant relocation and assistance to all eligible tenants, including the right to return to a replacement rental dwelling unit, to the satisfaction of the Chief Planner and Executive Director, City Planning; k. The owner shall enter into and register on title one or more Agreement(s) to secure the conditions outlined in (a) through (j) above to the satisfaction of the City Solicitor and the Chief Planner and Executive Director, City Planning. 4. City Council authorize the Chief Planner and Executive Director, City Planning to issue the Preliminary Approval for the application under Municipal Code Chapter 667 for the demolition of the thirteen (13) existing rental dwelling units at 871 and 899 College Street after all of the following have occurred: a. Satisfaction or securing of the conditions in Recommendation 3.a.-k. above; b. The Official Plan Amendment has come into force and effect; c. The Zoning By-law Amendments have come into full force and effect; d. The issuance of the Notice of Approval Conditions for site plan approval by the Chief Planner or their designate, pursuant to Section 114 of the City of Toronto Act, 2006; e. The issuance of excavation and shoring permits for the approved structure on the site; and f. The execution and registration of a Section 37 Agreement pursuant to the Planning Act securing Recommendation 9 and any other requirements of the Zoning-Bylaw Amendment. 5. City Council authorize the Chief Building Official to issue a Section 111 permit under Municipal Code Chapter 667 after the Chief Planner and Executive Director, City Planning has given preliminary approval referred to in Recommendation 4 above. 6. City Council authorize the Chief Building Official to issue a demolition permit under Section 33 of the Planning Act no earlier than the issuance of the first building permit for excavation and shoring of the development, and after the Chief Planner and Executive Director, City Planning has given preliminary approval referred to in Recommendation 4 above, which permit may be included in the demolition permit for Chapter 667 under 363-11.1, of the Municipal Code, on condition that: a. the owner remove all debris and rubble from the site immediately after demolition; b. the owner erect solid construction hoarding to the satisfaction of the Chief Building Official; c. The owner erects a residential building on site no later than three (3) years from the day demolition of the buildings is commenced; and d. Should the owner fail to complete the new building within the time specified in Recommendation c above, the City Clerk shall be entitled to enter on the collector's roll, to be collected in a like manner as municipal taxes, the sum of twenty thousand dollars ($20,000.00) for each dwelling unit for which a demolition permit is issued, and that each sum shall, until payment, be a lien or charge upon the land for which the demolition permit is issued. 7. City Council authorize the appropriate City officials to take such actions as are necessary to implement the foregoing, including execution of the Section 111 Agreement. 8. City Council authorizes the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendments as may be required. 9. Before introducing the necessary Bills to City Council for enactment, require the Owner to enter into an Agreement pursuant to Section 37 of the Planning Act as follows: a. Prior to the issuance of the first above-grade building permit, a cash contribution of $600,000 towards park improvements within the vicinity of the site within the boundaries of Ward 9, to the satisfaction of the Chief Planner and Executive Director, City Planning, in consultation with the Ward Councillor. Such amount to be indexed upwardly in accordance with the Statistics Canada Construction Price Index for Toronto, calculated from the date of registration of the Section 37 Agreement to the date the payment is made. b. The following matters are also recommended to be secured in the Section 37 Agreement as a legal convenience to support development: i. Replacement of 13 rental dwelling units with rents secured at affordable and mid-range rent categories; ii. Securing a tenant relocation and assistance plan to mitigate adverse impacts on existing tenants and provide existing eligible tenants the right to return to a replacement rental dwelling unit at similar rent; and, iii. Submission, and thereafter implementation, of a construction management plan by the owner of 871-899 College Street to address such matters as wind, noise, dust, street closures, parking and laneway uses and access. Such plan to be to the satisfaction of the Chief Planner and Executive Director City Planning in consultation with the local Councillor and shall be completed prior to Site Plan Approval. 10. Before introducing the necessary Bills to City Council for enactment, the owner is required to submit a revised Functional Servicing Report and Hydrogeological Report satisfactory to the Chief Engineer and Executive Director, Engineering and Construction Services in consultation with the General Manager, Toronto Water.
TE5.6adopted
On January 19, 2012, a Zoning By-law amendment application to redevelop 170 Spadina Avenue with a 19-storey mixed-use building was submitted to the City. In August 2014, the application was revised, proposing a 17-storey building and including 3, 5, and 7 Cameron Street, and was appealed to the Ontario Municipal Board (OMB). On February 19, 2019, the Local Planning Appeal Tribunal (LPAT) approved a 12-storey building on the site but withheld its final order pending the resolution of the Rental Housing Demolition application and the execution and registration of a Section 37 Agreement. The Rental Housing Demolition application proposes the demolition of 10 existing rental dwelling units at 3, 5 and 7 Cameron Street and replacement of all demolished rental dwelling units with the proposed mixed-use building. This report reviews and recommends approval of the Rental Housing Demolition Application under Chapter 667 of the Toronto Municipal Code and the Residential Demolition Permit under Chapter 363 of the Toronto Municipal Code, subject to conditions. This report also details the matters to be secured in the Section 37 Agreement, including community benefits and matters of convenience.
The Toronto and East York Community Council recommends that: 1. City Council approve the application for a Rental Housing Demolition Permit in accordance with Chapter 667 of the Toronto Municipal Code to allow for the demolition of 10 existing rental dwelling units located at 3, 5 and 7 Cameron Street, subject to the following conditions: a. the owner will provide and maintain 10 replacement rental dwelling units, comprised of eight one-bedroom and two three-bedroom rental units, within the proposed mixed-use building on the site, for a period of at least 20 years, beginning from the date that each such replacement rental dwelling unit is first occupied, and as generally illustrated in the plans provided to the City Planning dated April 2, 2018. The two three-bedroom replacement rental dwelling units will have unrestricted rents. Any revision to these plans will be to the satisfaction of the Chief Planner and Executive Director, City Planning; b. the owner will provide and maintain at least four one-bedroom replacement rental dwelling units at affordable rents and four one-bedroom replacement rental dwelling units at mid-range rents, for a period of at least 10 years, beginning from the date that each such replacement rental dwelling unit is first occupied. c. the owner will provide and maintain ensuite laundry facilities in each replacement rental dwelling unit; d. the owner will provide tenants of the replacement rental dwelling units with access to all indoor and outdoor amenities in the proposed mixed-use building. Access and use of these amenities will be on the same terms and conditions as any resident of the non-replacement dwelling units without the need to pre-book or pay a fee, unless specifically required as customary practices for private bookings; e. the owner will provide at least two vehicle parking spaces to tenants of the replacement rental dwelling units; f. the owner will enter into, and register on title to the site, one or more agreement(s) to secure the conditions outlined in Recommendations 1.a.b.c.d. and e. above to the satisfaction of the City Solicitor and the Chief Planner and Executive Director, City Planning. 2. City Council authorize the Chief Planner and Executive Director, City Planning, to issue Preliminary Approval for the Rental Housing Demolition Permit under Chapter 667 of the Toronto Municipal Code for the demolition of the 10 existing rental dwelling units at 3, 5 and 7 Cameron Street after all of the following have occurred: a. satisfaction or securing of the conditions in Recommendation 1 above; b. the site-specific Zoning By-law Amendments have come into full force and effect; c. the issuance of the Notice of Approval Conditions for site plan approval by the Chief Planner and Executive Director, City Planning, or their designate, pursuant to Section 114 of the City of Toronto Act, 2006; d. the issuance of excavation and shoring permits for the approved mixed-use building on the site; and e. the execution and registration of a Section 37 Agreement pursuant to the Planning Act securing Recommendation 1.a.b.c.d. and e. above and any other requirements of the Zoning-Bylaw Amendment. 3. City Council authorize the Chief Building Official and Executive Director, Toronto Building to issue the Rental Housing Demolition Permit under Chapter 667 of the Toronto Municipal Code after the Chief Planner and Executive Director, City Planning, has given preliminary approval referred to in Recommendation 2 above. 4. City Council authorize the Chief Building Official and Executive Director, Toronto Building to issue the Residential Demolition Permit under Chapter 363 of the Toronto Municipal Code and Section 33 of the Planning Act no earlier than the issuance of the first building permit for excavation and shoring of the proposed development, and after the Chief Planner and Executive Director, City Planning, has given preliminary approval referred to in Recommendation 2 above, which may be included in the Rental Housing Demolition permit under 363-11.1, of the Toronto Municipal Code, on condition that: a. the owner remove all debris and rubble from the site immediately after demolition; b. the owner erect solid construction hoarding to the satisfaction of the Chief Building Official and Executive Director, Toronto Building; c. the owner will erect the mixed-use building on the site no later than four (4) years from the day the demolition of the existing buildings commences; and d. should the owner fail to complete the proposed mixed-use building within the time specified in Recommendation 4.c. above, the City Clerk will be entitled to enter on the collector's roll, to be collected in a like manner as municipal taxes, the sum of twenty thousand dollars ($20,000.00) for each dwelling unit for which a Residential Demolition Permit is issued, and that each sum will, until payment, be a lien or charge upon the land for which the demolition permit is issued. 5. City Council instruct the City Solicitor to enter into an Agreement pursuant to Section 37 of the Planning Act satisfactory to the City Solicitor, together with satisfactory provisions in the amending By-laws, to secure the following, at the owner's expense, in connection with the development at 170 Spadina, 3, 5, and 7 Cameron Street, all to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor, with such agreement to be registered to the satisfaction of the City Solicitor: a. The following community benefit is recommended to be secured in a Section 37 Agreement: 1. A financial contribution of $575,000.00, indexed upwardly in accordance with the Statistics Canada Non-Residential Construction Price Index for Toronto for the period from the date of the execution of the Section 37 Agreement to the date of payment, towards the provision of affordable rental housing within Ward 10, in the vicinity of the site, to the satisfaction of the Chief Planner and Executive Director, City Planning, in consultation with the Ward Councillor. 2. In the event the financial contribution referred to in Recommendation 5.a.1. above has not been used for the intended purpose within five (5) years of this By-law coming into full force and effect, the financial contribution may be redirected for another purpose, at the discretion of the Chief Planner and Executive Director, City Planning, in consultation with the Ward Councillor, provided that the purpose(s) is/are identified in the Toronto Official Plan and will benefit the community in the vicinity of the site. b. The following maters of convenience are recommended to be secured in a Section 37 Agreement: 1. Prior to the issuance of the first above grade permit, the owner will submit a Wind Study which identifies recommendations for the pedestrian realm and the outdoor areas of the podiums to mitigate wind impacts year-round, which the owner will then implement and maintain; 2. the owner will design and construct the required improvements to municipal infrastructure identified in the Functional Servicing and Stormwater Management Reports; and, 3. Prior to the issuance of a permit for excavation and shoring work, the owner will submit a Construction Management Plan, to the satisfaction of the Chief Planner and Executive Director, City Planning, the General Manager, Transportation Services, and the Chief Building Official and Executive Director, Toronto Building, in consultation with the Ward Councillor, and thereafter will implement the plan during the course of construction. The Construction Management Plan will include the size and location of construction staging areas, dates of significant concrete pouring, lighting details, construction vehicle parking and queuing locations, refuse storage, site security, site supervisor contact information, a communication strategy with the surrounding community, and any other matters requested by the Chief Planner and Executive Director, City Planning, the General Manager, Transportation Services, in consultation with the Ward Councillor. 6. City Council authorize the appropriate City officials to take such actions as are necessary to implement the recommendations above, including execution of the Section 37 and Section 111 Agreements.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council approve the application for a Rental Housing Demolition Permit in accordance with Chapter 667 of the Toronto Municipal Code to allow for the demolition of 10 existing rental dwelling units located at 3, 5 and 7 Cameron Street, subject to the following conditions: a. the owner will provide and maintain 10 replacement rental dwelling units, comprised of eight one-bedroom and two three-bedroom rental units, within the proposed mixed-use building on the site, for a period of at least 20 years, beginning from the date that each such replacement rental dwelling unit is first occupied, and as generally illustrated in the plans provided to the City Planning Division dated April 2, 2018. The two three-bedroom replacement rental dwelling units will have unrestricted rents. Any revision to these plans will be to the satisfaction of the Chief Planner and Executive Director, City Planning Division; b. the owner will provide and maintain at least four one-bedroom replacement rental dwelling units at affordable rents and four one-bedroom replacement rental dwelling units at mid-range rents, for a period of at least 10 years, beginning from the date that each such replacement rental dwelling unit is first occupied. c. the owner will provide and maintain ensuite laundry facilities in each replacement rental dwelling unit; d. the owner will provide tenants of the replacement rental dwelling units with access to all indoor and outdoor amenities in the proposed mixed-use building. Access and use of these amenities will be on the same terms and conditions as any resident of the non-replacement dwelling units without the need to pre-book or pay a fee, unless specifically required as customary practices for private bookings; e. the owner will provide at least two vehicle parking spaces to tenants of the replacement rental dwelling units; f. the owner will enter into, and register on title to the site, one or more agreement(s) to secure the conditions outlined in a, b, c, d and e above to the satisfaction of the City Solicitor and the Chief Planner and Executive Director, City Planning Division. 2. City Council authorize the Chief Planner and Executive Director, City Planning Division, to issue Preliminary Approval for the Rental Housing Demolition Permit under Chapter 667 of the Toronto Municipal Code for the demolition of the 10 existing rental dwelling units at 3, 5 and 7 Cameron Street after all of the following have occurred: a. satisfaction or securing of the conditions in Recommendation 1 above; b. the site-specific Zoning By-law Amendments have come into full force and effect; c. the issuance of the Notice of Approval Conditions for site plan approval by the Chief Planner and Executive Director, City Planning Division, or their designate, pursuant to Section 114 of the City of Toronto Act, 2006; d. the issuance of excavation and shoring permits for the approved mixed-use building on the site; and e. the execution and registration of a Section 37 Agreement pursuant to the Planning Act securing Recommendation 1 a, b, c, d and e and any other requirements of the Zoning-Bylaw Amendment. 3. City Council authorize the Chief Building Official to issue the Rental Housing Demolition Permit under Chapter 667 of the Toronto Municipal Code after the Chief Planner and Executive Director, City Planning Division, has given preliminary approval referred to in Recommendation 2, above. 4. City Council authorize the Chief Building Official to issue the Residential Demolition Permit under Chapter 363 of the Toronto Municipal Code and Section 33 of the Planning Act no earlier than the issuance of the first building permit for excavation and shoring of the proposed development, and after the Chief Planner and Executive Director, City Planning Division, has given preliminary approval referred to in Recommendation 2, above, which may be included in the Rental Housing Demolition permit under 363-11.1, of the Toronto Municipal Code, on condition that: a. the owner remove all debris and rubble from the site immediately after demolition; b. the owner erect solid construction hoarding to the satisfaction of the Chief Building Official; c. the owner will erect the mixed-use building on the site no later than four (4) years from the day the demolition of the existing buildings commences; and d. should the owner fail to complete the proposed mixed-use building within the time specified in condition (c) above, the City Clerk will be entitled to enter on the collector's roll, to be collected in a like manner as municipal taxes, the sum of twenty thousand dollars ($20,000.00) for each dwelling unit for which a Residential Demolition Permit is issued, and that each sum will, until payment, be a lien or charge upon the land for which the demolition permit is issued. 5. City Council instruct the City Solicitor to enter into an Agreement pursuant to Section 37 of the Planning Act satisfactory to the City Solicitor, together with satisfactory provisions in the amending By-laws, to secure the following, at the owner's expense, in connection with the development at 170 Spadina, 3, 5, and 7 Cameron Street, all to the satisfaction of the Chief Planner and Executive Director, City Planning Division and the City Solicitor, with such agreement to be registered to the satisfaction of the City Solicitor: a. The following community benefit is recommended to be secured in a Section 37 Agreement: 1. A financial contribution of $575,000.00, indexed upwardly in accordance with the Statistics Canada Non-Residential Construction Price Index for Toronto for the period from the date of the execution of the Section 37 Agreement to the date of payment, towards the provision of affordable rental housing within Ward 10, in the vicinity of the site, to the satisfaction of the Chief Planner and Executive Director, City Planning Division, in consultation with the Ward Councillor. 2. In the event the financial contribution referred to in recommendation 5.a.1. has not been used for the intended purpose within five (5) years of this By-law coming into full force and effect, the financial contribution may be redirected for another purpose, at the discretion of the Chief Planner and Executive Director, City Planning Division, in consultation with the Ward Councillor, provided that the purpose(s) is/are identified in the Toronto Official Plan and will benefit the community in the vicinity of the site. b. The following maters of convenience are recommended to be secured in a Section 37 Agreement: 1. Prior to the issuance of the first above grade permit, the owner will submit a Wind Study which identifies recommendations for the pedestrian realm and the outdoor areas of the podiums to mitigate wind impacts year-round, which the owner will then implement and maintain; 2. the owner will design and construct the required improvements to municipal infrastructure identified in the Functional Servicing and Stormwater Management Reports; and, 3. Prior to the issuance of a permit for excavation and shoring work, the owner will submit a Construction Management Plan, to the satisfaction of the Chief Planner and Executive Director, City Planning Division, the General Manager of Transportation Services, and the Chief Building Official, in consultation with the Ward Councillor, and thereafter will implement the plan during the course of construction. The Construction Management Plan will include the size and location of construction staging areas, dates of significant concrete pouring, lighting details, construction vehicle parking and queuing locations, refuse storage, site security, site supervisor contact information, a communication strategy with the surrounding community, and any other matters requested by the Chief Planner and Executive Director, City Planning, the General Manager of Transportation Services, in consultation with the Ward Councillor. 6. City Council authorize the appropriate City officials to take such actions as are necessary to implement the foregoing, including execution of the Section 37 and Section 111 Agreements.
TE5.7adopted
Two applications have been submitted to facilitate the proposed residential development of 7 townhouses at 1025 Dupont Street (the "Subject Lands"). The first application (File No. 18 254683 STE 18 PL) requests exemption from the Part Lot Control provisions of the Planning Act to permit the creation of 8 parcels, which include 7 townhouse lots and a Common Elements Condominium. The second application (File No. 18 254688 STE 18 CD) proposes to establish a Common Elements Condominium for a shared driveway, pedestrian walkway and landscaped area. The Common Elements Condominium is required to provide vehicular access to the townhouse units and to ensure collective ownership and maintenance of the Common Element Condominium area by the condominium corporation. The applications are consistent with the Provincial Policy Statement (2014) and conform to the Growth Plan for the Greater Golden Horseshoe (2017) and the City of Toronto's Official Plan. The lifting of Part Lot Control and the creation of the Common Elements Condominium is appropriate for the orderly development of these lands. This report reviews and recommends approval of the Part Lot Control Exemption application. The approval of the Draft Plan of Common Elements Condominium application is delegated to the Chief Planner and Executive Director, City Planning. In addition, this report recommends that the owner of the Subject Lands be required to register a Section 118 Restriction under the Land Titles Act agreeing not to convey or mortgage any part of the Subject Lands without prior consent of the Chief Planner and Executive Director or his designate.
The Toronto and East York Community Council recommends that: 1. City Council enact a Part Lot Control Exemption By-law with respect to the Subject Lands as generally illustrated on Attachment 3 to the report (April 1, 2019) from the Director, Community Planning, Toronto and East York District, to be prepared to the satisfaction of the City Solicitor and to expire two years following enactment by City Council. 2. City Council require the owner to provide proof of payment of all current property taxes for the Subject Lands to the satisfaction of the City Solicitor, prior to the enactment of the Part Lot Control Exemption By-law. 3. Prior to the introduction of the Part Lot Control Exemption By-law, City Council require the owner to register on title to the Subject Lands and to the satisfaction of the City Solicitor, a Section 118 Restriction under the Land Titles Act agreeing not to transfer or charge any part of the Subject Lands without the written consent of the Chief Planner and Executive Director, City Planning or designate. 4. City Council authorize the City Solicitor to take the necessary steps to release the Section 118 Restriction from title to the Subject Lands at such time as confirmation is received that the Common Elements Condominium has been registered. 5. City Council authorize and direct the City Solicitor to register the Part Lot Control Exemption By-law on title to the Subject Lands. 6. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Part Lot Control Exemption By-law as may be required.
Staff recommendation as filed
The Director, Community Planning, Toronto and East York District recommends that: 1. City Council enact a Part Lot Control Exemption By-law with respect to the Subject Lands as generally illustrated on Attachment 3 to this report, to be prepared to the satisfaction of the City Solicitor and to expire two years following enactment by City Council. 2. City Council require the owner to provide proof of payment of all current property taxes for the Subject Lands to the satisfaction of the City Solicitor, prior to the enactment of the Part Lot Control Exemption By-law. 3. Prior to the introduction of the Part Lot Control Exemption By-law, City Council require the owner to register on title to the Subject Lands and to the satisfaction of the City Solicitor, a Section 118 Restriction under the Land Titles Act agreeing not to transfer or charge any part of the Subject Lands without the written consent of the Chief Planner and Executive Director or his/her designate. 4. City Council authorize the City Solicitor to take the necessary steps to release the Section 118 Restriction from title to the Subject Lands at such time as confirmation is received that the Common Elements Condominium has been registered. 5. City Council authorize and direct the City Solicitor to register the Part Lot Control Exemption By-law on title to the Subject Lands. 6. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Part Lot Control Exemption By-law as may be required.
TE5.8amended
485 Logan Avenue - Site Plan Control Application - Final Report
This application proposes to construct a four-storey residential building containing 41 dwelling units at 485 Logan Avenue. The local Councillor directed staff to report to City Council, through Toronto and East York Community Council, as per the provisions in By-law 438-2000 for Site Plan Control applications. This report reviews and recommends approval, in principle, of the Site Plan Control application for 485 Logan Avenue.
The Toronto and East York Community Council recommends that: 1. City Council approve, in principle, the conditions set out in Attachment 3 to the report (April 4, 2019) from the Director, Community Planning, Toronto and East York District for the proposed 4-storey residential building at 485 Logan Avenue. 2. City Council delegate back to the Chief Planner and Executive Director, City Planning or designate the authority to issue final Site Plan Approval. 3. City Council direct the applicant to establish a Construction Liaison Committee made up of local residents to the satisfaction of the local Councillor and that the Committee is to meet weekly at the beginning of construction. 4. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 5. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks, laneways and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 7. City Council direct the applicant to ensure that the existing sidewalks and all pedestrian walkways have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local businesses, residents and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct the applicant to post a contact number for the site superintendent on the construction hoarding. 11. City Council direct the Applicant to create a publicly accessible website with regular construction updates and post the website address on the subject site - 485 Logan Avenue. 12. City Council direct the Applicant to include a minimum of 75 percent of advertisement surface area on the construction hoarding to be allocated to artwork at their sole cost in collaboration with the STEPS Initiative and to the satisfaction of the Ward Councillor.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council approve, in principle, the conditions set out in Attachment 3 to the report dated April 4, 2019 from the Director, Community Planning, Toronto and East York District for the proposed 4-storey residential building at 485 Logan Avenue. 2. City Council delegate back to the Chief Planner or his designate the authority to issue final Site Plan Approval.
TE5.9adopted
The applications propose to amend the Official Plan and Zoning By-law for the properties at 1 Front Street West and 141 Bay Street to permit two residential towers of 45 and 49 storeys (156.9 and 168.7 metres respectively) containing 836 units on top of the 5-storey heritage designated Dominion Public Building. The Dominion Public Building is proposed to be altered to accommodate 8,989 square metres of retail space and 22,045 square metres for a hotel with 251 rooms. A 3-level underground garage is proposed to accommodate 199 vehicular parking spaces. This report reviews and recommends refusal of the applications to amend the Official Plan and Zoning By-law as it does not support the role of the Financial District in maintaining office use on-site, does not provide minimum tall building setbacks, and does not conserve the scale, form and massing of the heritage Dominion Public Building. Specifically: The proposal is inconsistent with the Provincial Policy Statement (2014), as it sets out inappropriate development standards including the absence of maximum building densities for the subject site; elimination of building setbacks from property lines and reduced tower setbacks between buildings; the inadequate mix of land uses to meet long term needs; and has not conserved the significant heritage values of the Dominion Public Building, Union Station and the Union Station Heritage Conservation District; The proposal fails to conform with the Growth Plan for the Greater Golden Horseshoe (2017). It does not: provide certainty on the scale and adequate transition to adjacent areas as it applies to the subject site; has not appropriately directed major office uses within the Downtown Urban Growth Centre; and does not conserve the significant heritage values of the Dominion Public Building, Union Station, and the Union Station Heritage Conservation District; The proposal is not consistent with the general intent of the Official Plan, as it does not focus office use in the Financial District, does not provide a built form parameter that fits within the existing and planned context, and does not conserve the significant heritage values of the Dominion Public Building, the adjacent Union Station, nor the Union Station Heritage Conservation District; The proposal does not maintain the intent and purpose of Official Plan Amendment 231, Official Plan Amendment 352 and Official Plan Amendment 406, particularly with respect to the elimination of existing office use on-site and the increase in residential uses beyond the as-of-right permission. The proposal does not address nor maintain the intent of the Council approved urban design guidelines, particularly with respect to the direction to provide a minimum 25 metres of separation distance between towers and a minimum 12.5 metre tower setback from the rear lot line; and The proposal does not conserve the significant heritage attributes of the Dominion Public Building as defined by the designating By-laws under Part IV and V the Ontario Heritage Act.
The Toronto and East York Community Council recommends that: 1. City Council refuse the application for Official Plan Amendment at 1 Front Street West and 141 Bay Street for the reasons set out in the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District. 2. City Council refuse the application for the Zoning By-law Amendment at 1 Front Street West and 141 Bay Street for the reasons set out in the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District. 3. City Council authorize the City Solicitor, together with appropriate staff, to appear before the Local Planning Appeal Tribunal (the "LPAT") in support of City Council's decision to refuse the application, in the event that the applications are appealed to the Local Planning Appeal Tribunal. 4. In the event the applications are appealed to the Local Planning Appeal Tribunal, City Council, pursuant to sections 22(8.1) and 34(11.0.0.1) of the Planning Act, use mediation, conciliation or other dispute resolution techniques in an attempt to resolve the Official Plan Amendment and Zoning By-law Amendment applications, to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor. 5. City Council direct the City Clerk, should an appeal be filed, to notify all persons or public bodies who may have filed an appeal to this decision of City Council's intention to rely on sections 22(8.1) and 34(11.0.0.1) of the Planning Act and the City Clerk shall provide notice to all prescribed persons or public bodies under sections 22(8.2) and 34(11.0.0.2) of the Planning Act. 6. City Council direct the City Clerk, should an appeal be filed, to notify the Local Planning Appeal Tribunal of City Council's intention pursuant to section 22(8.1) and 34(11.0.0.1) of the Planning Act, and that the Local Planning Appeal Tribunal shall receive the record, the notice of appeal and other prescribed documents and materials seventy-five (75) days after the last day for filing a notice of appeal for these matters. 7. City Council authorize the City Solicitor and other appropriate staff to take any necessary steps to implement the recommendations above.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council refuse the application for Official Plan Amendment at 1 Front Street West and 141 Bay Street for the reasons set out in the report from the Director, Community Planning, Toronto and East York District, dated April 10, 2019. 2. City Council refuse the application for the Zoning By-law Amendment at 1 Front Street West and 141 Bay Street for the reasons set out in the report from the Director, Community Planning, Toronto and East York District, dated April 10, 2019. 3. City Council authorize the City Solicitor, together with appropriate staff, to appear before the Local Planning Appeal Tribunal (the "LPAT") in support of City Council's decision to refuse the application, in the event that the applications are appealed to the LPAT. 4. In the event the applications are appealed to the LPAT, City Council, pursuant to sections 22(8.1) and 34(11.0.0.1) of the Planning Act, use mediation, conciliation or other dispute resolution techniques in an attempt to resolve the Official Plan Amendment and Zoning By-law Amendment applications, to the satisfaction of the Chief Planner and Executive Director, City Planning and City Solicitor. 5. City Council direct the City Clerk, should an appeal be filed, to notify all persons or public bodies who may have filed an appeal to this decision of City Council's intention to rely on sections 22(8.1) and 34(11.0.0.1) of the Planning Act and the City Clerk shall provide notice to all prescribed persons or public bodies under sections 22(8.2) and 34(11.0.0.2) of the Planning Act. 6. City Council direct the City Clerk, should an appeal be filed, to notify the LPAT of City Council's intention pursuant to section 22(8.1) and 34(11.0.0.1) of the Planning Act, and that the LPAT shall receive the record, the notice of appeal and other prescribed documents and materials seventy-five (75) days after the last day for filing a notice of appeal for these matters. 7. City Council authorize the City Solicitor and other appropriate staff to take any necessary steps to implement City Council's decision.
TE5.10adopted
598 and 596R Rushton Road - Zoning By-law Amendment Application - Request for Direction Report
On November 24, 2017 an application to amend the Zoning By-law was submitted to permit the conversion and enlargement of an existing vacant building on a lot fronting a public laneway at 596 R Rushton Road into a detached house. The proposed dwelling is two-storeys and 6.82 metres in height. A parking pad for one vehicle and an amenity space is proposed to be located on a portion of 598 Rushton Road. The existing single detached house at 598 Rushton Road will be maintained. On March 29, 2018 the applicant appealed the Zoning By-law Amendment application to the Local Planning Appeal Tribunal (LPAT), citing City Council's failure to make a decision within the allotted time in the Planning Act. A pre-hearing conference was held on January 9, 2019 and a second pre-hearing conference is scheduled for June 14, 2019. The proposal is appropriate for the site and compatible with the surrounding area. The proposed development is consistent with the Provincial Policy Statement (2014), conforms to the Growth Plan for the Greater Golden Horseshoe (2017) and conforms to the Toronto Official Plan. The purpose of this report is to seek City Council's direction with respect to the position of the City at the Local Planning Appeal Tribunal. This report recommends that City Council direct the City Solicitor, together with appropriate City staff, to support the proposal at the Local Planning Appeal Tribunal.
The Toronto and East York Community Council recommends that: 1. City Council direct the City Solicitor, together with Planning staff and other appropriate staff to attend the Local Planning Appeal Tribunal (LPAT) hearing in support of Zoning By-law Amendment Application File Number 17 266727 STE 21 OZ, at 598 and 596 R Rushton Road, provided all conditions listed below are satisfied to the City's satisfaction. 2. In the event that the Local Planning Appeal Tribunal allows the appeal in whole or in part, City Council direct the City Solicitor to request the Local Planning Appeal Tribunal to withhold its Order on the Zoning By-law Amendment until the City Solicitor confirms that: a. The owner has submitted revised engineering drawings to the satisfaction of the Manager, Development Engineering. b. The owner has provided documentation to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, to demonstrate that: 1. An easement has been secured in favour of the subject site, for the purposes of municipal servicing and site access; and 2. A consent to sever the subject site in accordance with the drawings dated February 14, 2019 has been approved. c. The owner has made a payment of $1,749.00 to the General Manager, Parks, Forestry and Recreation as a cash payment in lieu of the replacement of three trees; and d. The final form of the Zoning By-law Amendment is to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council direct the City Solicitor, together with Planning staff and other appropriate staff to attend the Local Planning Appeal Tribunal (LPAT) hearing in support of Zoning By-law Amendment Application File Number 17 266727 STE 21 OZ, at 598 and 596 R Rushton Road, provided all conditions listed below are satisfied to the City's satisfaction. 2. In the event that the LPAT allows the appeal in whole or in part, City Council direct the City Solicitor to request the LPAT to withhold its Order on the Zoning By-law Amendment until the City Solicitor confirms that: a. The owner has submitted revised engineering drawings to the satisfaction of the Manager of Development Engineering. b. The owner has provided documentation to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, to demonstrate that: 1. An easement has been secured in favour of the subject site, for the purposes of municipal servicing and site access; and 2. A consent to sever the subject site in accordance with the drawings dated February 14, 2019 has been approved. c. The owner has made a payment of $1,749.00 to the General Manager of Parks, Forestry and Recreation as a cash payment in lieu of the replacement of three trees; and d. The final form of the Zoning By-law Amendment is to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor.
TE5.11adopted
Inclusion on the City of Toronto's Heritage Register - 28, 38-52 and 66-74 Belmont Street
This report recommends that City Council include 14 properties identified in Recommendation 1 of this report on the City of Toronto's Heritage Register. The subject properties are located in the Yorkville neighbourhood, on the north side of Belmont Street, and contain a two and a half-storey detached house-form building completed by 1873 and 13 two-storey row houses that were completed between 1881 and 1886. The houses on Belmont Street have their origin in the century-long brickmaking industry of Toronto. Brickyards spread north to Yorkville in 1835, and gained prominence to the extent that a brick mould is featured in the Yorkville coat of arms. The properties at 40, 42, 46 & 48 Belmont Street were nominated for inclusion on the City's Heritage Register at the same time as the community's nomination for a Heritage Conservation District study in 2015. In 2016 City Council authorized the Belmont-Hillsboro Heritage Conservation District (HCD) study and it is included the City Planning Division's Work Program, however, it is on hold awaiting prioritization. A HCD study does not preclude Council from listing properties on the City's Heritage Register or designating individual properties in the study area under Part IV of the Ontario Heritage Act. In August 2018, the Committee of Adjustment deferred consideration of an application seeking variances to permit alterations and additions to the property at 40 Belmont Street pending a report from Heritage Preservation Services regarding the site's potential heritage value. This application was recently withdrawn by the property owner. Following research and evaluation, it has been determined that the 14 properties at 28, 38-52 and 66-74 Belmont Street meet Ontario Regulation 9/06, the criteria prescribed for municipal designation under Part IV, Section 29 of the Ontario Heritage Act, which the City of Toronto also applies when evaluating properties for its Heritage Register. Properties on the Heritage Register will be conserved and maintained in accordance with the Official Plan Heritage Policies.
The Toronto and East York Community Council recommends that: 1. City Council include the following 14 properties on Belmont Street on the City of Toronto's Heritage Register: 28 Belmont Street 38 Belmont Street 40 Belmont Street 42 Belmont Street 44 Belmont Street 46 Belmont Street 48 Belmont Street 50 Belmont Street 52 Belmont Street 66 Belmont Street 68 Belmont Street 70 Belmont Street 72 Belmont Street 74 Belmont Street
Staff recommendation as filed
The Senior Manager, Heritage Preservation Services, Urban Design, City Planning recommends that: 1. City Council include the following 14 properties on Belmont Street on the City of Toronto's Heritage Register: 28 Belmont Street 38 Belmont Street 40 Belmont Street 42 Belmont Street 44 Belmont Street 46 Belmont Street 48 Belmont Street 50 Belmont Street 52 Belmont Street 66 Belmont Street 68 Belmont Street 70 Belmont Street 72 Belmont Street 74 Belmont Street
TE5.12adopted
This report recommends that City Council include the property at 28-30 Langley Avenue on the City of Toronto's Heritage Register and state its intention to designate the property under Part IV, Section 29 of the Ontario Heritage Act to protect the exterior of the building and property. This report was prepared in response to the City Council request to evaluate the property at 28-30 Langley Avenue and report back to the April 24, 2019 meeting of the Toronto and East York Community Council, the April 30, 2019 meeting of the Toronto Preservation Board, and the May 14, 2019 meeting of City Council. The property at 28-30 Langley Avenue in Riverdale with the William C. Jones Houses (1893) is a rooming house undergoing interior renovations.
The Toronto and East York Community Council recommends that: 1. City Council include the property at 28-30 Langley Avenue on the City of Toronto's Heritage Register. 2. City Council state its intention to designate the property at 28-30 Langley Avenue under Part IV, Section 29 of the Ontario Heritage Act in accordance with the Statement of Significance: 28-30 Langley Avenue (Reasons for Designation) attached as Attachment 3 to the report (April 4, 2019) from the Senior Manager, Heritage Preservation Services, Urban Design, City Planning. 3. If there are no objections to the designation, City Council authorize the City Solicitor to introduce the bill in Council designating the property under Part IV, Section 29 of the Ontario Heritage Act. 4. If there are objections in accordance with the Ontario Heritage Act, City Council direct the City Clerk to refer the designation to the Conservation Review Board. 5. If the designation is referred to the Conservation Review Board, City Council authorize the City Solicitor and appropriate staff to attend any hearing held by the Conservation Review Board in support of Council's decision on the designation of the property.
Staff recommendation as filed
The Senior Manager, Heritage Preservation Services, Urban Design, City Planning recommends that: 1. City Council include the property at 28-30 Langley Avenue on the City of Toronto's Heritage Register. 2. City Council state its intention to designate the property at 28-30 Langley Avenue under Part IV, Section 29 of the Ontario Heritage Act in accordance with the Statement of Significance: 28-30 Langley Avenue (Reasons for Designation) attached as Attachment 3 to the report (April 4, 2019) from the Senior Manager, Heritage Preservation Services, Urban Design, City Planning. 3. If there are no objections to the designation, City Council authorize the City Solicitor to introduce the bill in Council designating the property under Part IV, Section 29 of the Ontario Heritage Act. 4. If there are objections in accordance with the Ontario Heritage Act, City Council direct the City Clerk to refer the designation to the Conservation Review Board. 5. If the designation is referred to the Conservation Review Board, City Council authorize the City Solicitor and appropriate staff to attend any hearing held by the Conservation Review Board in support of Council's decision on the designation of the property.
TE5.13deferred indefinitely
Refusal of an Application for a Boulevard Café Permit Located at 663-665 King Street West
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. To report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café located at 663-665 King Street West.
The Toronto and East York Community Council deferred consideration of Item TE5.13 indefinitely.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed boulevard cafe located at 663-665 King Street West be denied.
TE5.14amended
Refusal of an Application for a Boulevard Café Permit Located at 104 Portland Street
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. To report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café located at 104 Portland Street.
The Toronto and East York Community Council: 1. Approved the application for the proposed boulevard café locate at 104 Portland Street, with the following conditions: a. The patio will stop operations and be cleared out no later than 11:00 p.m. each night. b. Signage will be posted in a prominent location to remind people to be considerate of the surrounding community. c. A telephone number will be provided for neighbours to register concerns or complaints directly with restaurant management. d. There will be no outdoor music or amplified sound on the patio, and doors and windows to the establishment will not be left open or propped open while there is music or amplified sound in the interior. e. Municipal Licensing and Standards to review in 1 year and report to the Councillor's office on any complaints received.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed boulevard café located at 104 Portland Street be denied.
TE5.15withdrawn
Refusal of a Boulevard Café Permit Application Located at 191 College Street, Henry Street Flankage
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. This is a report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café permit located at 191 College Street, Henry Street flankage.
Item TE5.15 was withdrawn from the Agenda.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for an extension for the proposed boulevard café permit located at 191 College Street, Henry Street flankage be denied.
TE5.16deferred
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. To report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café permit located at 356 College Street, Brunswick Avenue flankage.
The Toronto and East York Community Council deferred consideration of the item until its May 22, 2019 meeting.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed boulevard café permit located at 356 College Street, Brunswick Avenue flankage be denied.
TE5.17amended
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. This is a report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café permit located at 596 College Street, Clinton Street flankage.
The Toronto and East York Community Council: 1. Approved the application for the proposed boulevard café located at 596 College Street, Clinton Street flankage, with the following conditions: a. The Licensee shall not sell or serve and shall not permit consumption of liquor on the flank patio after 11:00 p.m., and after 10:00 p.m. on Sundays through Thursdays. b. The Licensee shall ensure the maximum number of seating on the patio is 11 seats. c. The Licensee shall not provide or permit music in outdoor areas of the premises. d. The Licensee shall install a sound/visual barrier at the north end of the patio/outdoor area to minimize the emission of the noise from the patio, in consultation with a sound engineer. e. The Licensee shall ensure that any sound resulting from the operation of the business is not audible beyond the lot line of the property and likely to disturb the quiet, peace, rest, enjoyment, comfort, convenience or safety of the nearby neighbourhood inhabitants in their residences. f. The Licensee shall post prominent signage at the main exits that remind and/or encourage patrons to be considerate of the residents in the neighbouring community. g. The Licensee shall post prominent signage stating patio conditions of the premises. h. The Licensee shall provide a telephone number for residents to register concerns or complaints. This line will normally be answered by a staff member during the Licensee's published hours of operation. This line will be equipped with a functioning answering service for those periods when the Licensee's staff is otherwise occupied and when the establishment is closed. i. The Licensee shall use best efforts to ensure that all areas immediately adjacent to the establishment are clean and free of litter, refuse and other debris. j. The Licensee shall use best efforts to arrange garbage collection and recycling at times that will not disturb nearby residents. k. The Licensee shall undergo a review of the permit and conditions in one year's time by the local Councillor. l. Should transfer of ownership occur for the premises, the patio licence shall not be transferred. Municipal Licensing and Standards shall report on any transfer applications. m. No changes to conditions without notification to local residents and local Councillor.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed boulevard café located at 596 College Street, Clinton Street flankage be denied.
TE5.18amended
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. To report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café located at 800 Dundas Street West, Palmerston Avenue Flankage.
The Toronto and East York Community Council: 1. Approved the application for the proposed boulevard café located at 800 Dundas Street West, Palmerston Avenue flankage, the following conditions: a. A 2.18 metre clearance from the tree in the patio area be maintained at all times b. In consultation with Municipal Licensing and Standards, a 1 metre setback from the apartment building be maintained at all times. c. Photos supplied to Municipal Licensing and Standards to demonstrate that awning has been removed. d. Photos supplied to Municipal Licensing and Standards to demonstrate that propane heaters have been removed. e. The Licensee shall not sell or serve and shall not permit consumption of liquor on the flank patio after 11:00 p.m., and after 10:00 p.m. on Sundays through Thursdays. f. The Licensee shall not provide or permit music in outdoor areas of the premises. g. The Licensee shall install a sound/visual barrier at the north end of the patio/outdoor area to minimize the emission of the noise from the patio, in consultation with a sound engineer. h. The Licensee shall ensure that any sound resulting from the operation of the business is not audible beyond the lot line of the property and likely to disturb the quiet, peace, rest, enjoyment, comfort, convenience or safety of the nearby neighbourhood inhabitants in their residences. i. The Licensee shall post prominent signage at the main exits that remind and/or encourage patrons to be considerate of the residents in the neighbouring community. j. The Licensee shall post prominent signage stating patio conditions of the premises. k. The Licensee shall provide a telephone number for residents to register concerns or complaints. This line will normally be answered by a staff member during the Licensee's published hours of operation. This line will be equipped with a functioning answering service for those periods when the Licensee's staff is otherwise occupied and when the establishment is closed. l. The Licensee shall use best efforts to ensure that all areas immediately adjacent to the establishment are clean and free of litter, refuse and other debris. m. The Licensee shall use best efforts to arrange garbage collection and recycling at times that will not disturb nearby residents. n. The Licensee shall undergo a review of the permit and conditions in one year's time by the local Councillor. o. Should transfer of ownership occur for the premises, the patio licence shall not be transferred. Municipal Licensing and Standards shall report on any transfer applications. p. No changes to conditions without notification to local residents and Ward Councillor.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed boulevard café located at 800 Dundas Street West, Palmerston Avenue Flankage be denied.
TE5.19deferred
Refusal of a Curbside Café Permit application Located at 997 Bay Street, St. Joseph Street Flankage
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. To report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a curbside café permit located at 997 Bay Street, St. Joseph Street flankage.
The Toronto and East York Community Council deferred consideration of the item until its May 22, 2019 meeting.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed curbside café located at 997 Bay Street, St. Joseph Street flankage be denied.
TE5.20amended
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority from City Council to make a final decision. This is a report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a boulevard café permit located at 477 Church Street, Maitland Street flankage.
The Toronto and East York Community Council: 1. Approved the application for the proposed boulevard café permit located at 477 Church Street, with the following conditions: a. The patio shall only operate within the following hours Monday to Thursday - 7:00 a.m. to 11:00 p.m., with the patio cleared of all patrons, tables and chairs by 11:30 p.m. Friday to Saturday and days before statutory holidays - 7:00 a.m. to 11:59 p.m. with the patio cleared of all patrons, tables and chairs by 12:30 a.m. Sunday - 8:00 a.m. to 10:59 p.m. with the patio cleared of all patrons, tables and chairs by 11:30 p.m. b.There shall be no amplified sound and/or music at any time on the patio. c. Doors must always remain closed when music is being played inside the establishment. d. The Licensee shall provide a telephone number for residents to register concerns or complaints. This line will normally be answered by a staff member during the Licensee's published hours of operation. This line will be equipped with a functioning answering service for those periods when the Licensee's staff is otherwise occupied and when the establishment is closed. e. The Licensee shall ensure that any sound resulting from the operation of the business is not audible beyond a reasonable distance from the lot line of the property on which the premises are located. This clause refers to sound that is generated by any conversation by patrons within the premises, bussing of tables, garbage and bottle disposal. A reasonable distance for such sound to be considered in non-compliance is any point opposite the Licensee's premises that is separated by a public street, public or private laneway or a parting wall between the Licensee's premises and any adjacent space. f. The Licensee shall post prominent signage at the main exits that remind and/or encourage patrons to be considerate of the residents of the surrounding community. g. The Licensee shall ensure that a staff member patrols/monitors the events to ensure that noise is kept to a reasonable volume. h. The Licensee shall use best efforts to ensure that all areas immediately adjacent to the establishment are clean and free of litter, refuse and other debris. I. The Licensee shall use best efforts to arrange garbage collection and recycling at times that will not disturb nearby residents. 2. Directed that an operational review be conducted in two (2) years and sent back to Toronto and East York Community Council for review and renewal.
Staff recommendation as filed
The Director of Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. The application for the proposed boulevard café permit located at 477 Church Street, Maitland Street flankage be denied.
TE5.21deferred
Front Yard Parking Appeal-356 Bartlett Avenue North
This staff report is about a matter which Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed an appeal from the owner of 356 Bartlett Avenue North for front yard parking. Front yard parking at this location is not recommended because it does not meet the criteria of the City of Toronto Municipal Code Chapter 918. The Code does not permit the licensing of a front yard parking pad where neighbourhood polling yielded a negative result.
The Toronto and East York Community Council deferred consideration of the item until its May 22, 2019 meeting.
Staff recommendation as filed
The Manager, Permits and Enforcement - Parking, Transportation Services recommends that Toronto and East York Community Council: 1. Deny the request for front yard parking at 356 Bartlett Avenue North; and 2. Request that the owner restore a section of the paved area to greenspace, to prevent unauthorized parking to the satisfaction of the General Manager, Transportation Services, as indicated in Attachment 'C', attached to the report (March 25, 2019), from the Manager, Right of Way Management, Transportation Services, Toronto and East York District.
TE5.22deferred indefinitely
Front Yard Parking Appeal - 42 Bellhaven Road
This staff report is about a matter which Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed an appeal from the owner of 42 Bellhaven Road for front yard parking. Front yard parking at this location is not recommended because it does not meet the City of Toronto Municipal Code Chapter 918 in that the Code does not permit the licensing of a front yard parking pad where the landscaping requirements cannot be provided. The owner will be given an opportunity to make a deputation before Community Council.
The Toronto and East York Community Council deferred consideration of Item TE5.22 indefinitely.
Staff recommendation as filed
The Manager, Right of Way Management, Transportation Services Toronto and East York District recommends that: 1. Toronto and East York Community Council deny the request for front yard parking at 42 Bellhaven Road.
TE5.23adopted
The purpose of this report is to establish a board of management for and appoint directors to the new Little Portugal on Dundas Business Improvement Area; dissolve the boards of management of the Dundas West BIA and the Little Portugal BIA; appoint directors to the Korea Town, Little Portugal on Dundas, Queen Street West, and Riverside District BIA boards of management, remove directors from the Regal Heights Village and Riverside District BIA boards of management, and make necessary changes to Schedule A of Municipal Code, Chapter 19, Business Improvement Areas.
The Toronto and East York Community Council: 1. Established a board of management for the Little Portugal on Dundas BIA consisting of thirteen (13) directors, including three (3) Councillors (Ward 9 Davenport, Ward 10 Spadina-Fort York, and Ward 11 University-Rosedale) and make the necessary amendments to Schedule A of Municipal Code Chapter 19. 2. Dissolved the Dundas West BIA board of management and Little Portugal BIA board of management and make the necessary amendments to Schedule A of Municipal Code Chapter 19. 3. In accordance with the City's Public Appointments Policy, appoint the following nominees to the Business Improvement Area (BIA) boards of management set out below at the pleasure of Toronto and East York Community Council, and for a term expiring at the end of the term of Council or as soon thereafter as successors are appointed: Korea Town: Philip, Barbosa Ben, Castanie Lisung (Louis), Gil Jonathan, Hunt Soyeon, Jang Joseph, Kang Brandon, Lee Carrol, Lee Jason, Lee Matt, Lee Min Ho, Lee Suki, Lee Choong Ho, Park Alex, Rodrigues Paul, Sawers Goldie, Schlanger Soozi, Schlanger Little Portugal on Dundas: Bowring, Shaun Del Core, Anthony Dornelas, Carlos Jenkins, Tracy Kurina, Alex Silveira, Jose Rogerio (Roger) Sluyter, Maarten Taborda, Anabela Tavares, Benito Queen Street West: Amlani, Shamez Band, Ira Friedmann, George Gauthier, Philippe Geringas, Arthur Harris, Ian Hughes, Gene Jalloh, Jebril Leitner, Nathan White, Elana Riverside District: Zeldin, Jamie 4. Removed the following directors from the Business Improvement Area (BIA) boards of management set out below: Regal Heights Village: Martins, Christine Riverside District: Nelson, Ryan 5. Directed that Schedule A of the Municipal Code Chapter 19, Business Improvement Areas, be amended by changing the number of directors of the following boards of management: Korea Town 18 Queen Street West 11
Staff recommendation as filed
The General Manager, Economic Development and Culture recommends that Toronto and East York Community Council: 1. Establish a board of management for the Little Portugal on Dundas BIA consisting of thirteen (13) directors, including three (3) Councillors (Ward 9 Davenport, Ward 10 Spadina-Fort York, and Ward 11 University-Rosedale) and make the necessary amendments to Schedule A of Municipal Code Chapter 19. 2. Dissolve the Dundas West BIA board of management and Little Portugal BIA board of management and make the necessary amendments to Schedule A of Municipal Code Chapter 19. 3. In accordance with the City's Public Appointments Policy, appoint the following nominees to the Business Improvement Area (BIA) boards of management set out below at the pleasure of Toronto and East York Community Council, and for a term expiring at the end of the term of Council or as soon thereafter as successors are appointed: Korea Town: Philip, Barbosa Ben, Castanie Lisung (Louis), Gil Jonathan, Hunt Soyeon, Jang Joseph, Kang Brandon, Lee Carrol, Lee Jason, Lee Matt, Lee Min Ho, Lee Suki, Lee Choong Ho, Park Alex, Rodrigues Paul, Sawers Goldie, Schlanger Soozi, Schlanger Little Portugal on Dundas: Bowring, Shaun Del Core, Anthony Dornelas, Carlos Jenkins, Tracy Kurina, Alex Silveira, Jose Rogerio (Roger) Sluyter, Maarten Taborda, Anabela Tavares, Benito Queen Street West: Amlani, Shamez Band, Ira Friedmann, George Gauthier, Philippe Geringas, Arthur Harris, Ian Hughes, Gene Jalloh, Jebril Leitner, Nathan White, Elana Riverside District: Zeldin, Jamie 4. Remove the following directors from the Business Improvement Area (BIA) boards of management set out below: Regal Heights Village: Martins, Christine Riverside District: Nelson, Ryan 5. Direct that Schedule A of the Municipal Code Chapter 19, Business Improvement Areas, be amended by changing the number of directors of the following boards of management: Korea Town 18 Queen Street West 11
TE5.24adopted
The purpose of this staff report is to seek City Council approval of 440, 444, 450 and 462 Front Street West; 425,439, 441 and 443 Wellington Street West; 6-18 Spadina Avenue and 1 and 19 Draper Street - Public Art Plan. The Plan, which is included as Attachment 1 of this report, outlines the method by which the owner will commission public art on a publicly-accessible area of the development site. The Public Art Plan provides a framework and description of the commissioning of public art including; introduction and background; public art plan; site context; project team; public art site description; artwork selection criteria; artist selection process; competition process; the jury; maintenance obligation; mentorship program; artwork budget and project schedule. The attached plan meets the objectives of the City Planning's Percent for Public Art Guidelines and is supported by the Toronto Public Art Commission.
The Toronto and East York Community Council recommends that: 1. City Council approve 440, 444, 450 and 462 Front Street West; 425,439, 441 and 443 Wellington Street West; 6-18 Spadina Avenue and 1 and 19 Draper Street - Public Art Plan as attached in Attachment 1 to the report (March 25, 2019) from the Director, Urban Design, City Planning.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council approve 440, 444, 450 and 462 Front Street West; 425,439, 441 and 443 Wellington Street West; 6-18 Spadina Avenue and 1 and 19 Draper Street - Public Art Plan as attached (Attachment 1) to the report dated March 25, 2019 from the Director, Urban Design.
TE5.25adopted
To obtain Toronto and East York Community Council approval for the amendment of the Fire Route By-law to designate certain locations as fire routes within the meaning of City of Toronto Municipal Code Chapter 880, as amended. Fire Services uses designated fire routes as a key mechanism in regulating fire prevention, including the prevention of spreading of fires and the delivery of fire protection services.
The Toronto and East York Community Council: 1. Designated part or those parts of the private road or roads shown on the site plans filed with the Fire Chief and General Manager, Fire Services in respect of the municipal addresses set out below, as fire routes pursuant to Municipal Code Chapter 880 -Fire Routes -50 Curzon Street; 106 and 108 Goodwood Park Court. 2. Authorized the Fire Chief and General Manager, Fire Services, and the City Solicitor to take the appropriate action to make a designated Fire Route.
Staff recommendation as filed
The Fire Chief and General Manager, Toronto Fire Services recommends that: 1. Toronto and East York Community Council designate part or those parts of the private road or roads shown on the site plans filed with the Fire Chief in respect of the municipal addresses set out below, as fire routes pursuant to Municipal Code Chapter 880 -Fire Routes -50 Curzon Street; 106 and 108 Goodwood Park Court; and 2. Toronto and East York Community Council authorize the Fire Chief and City Solicitor to take the appropriate action to make a designated Fire Route.
TE5.26adopted
Exhibition Place - Cultural Heritage Landscape Assessment and Next Steps for Master Plan
The purpose of the report is to provide a summary of the Cultural Heritage Landscape Assessment (CHLA) completed for Exhibition Place, to afirm its importance in informing the on-going Master Plan exercise for Exhibition Place and to oultine the next steps for the Exhibition Place Master Plan process. Exhibition Place is a unique City-owned site comprising approximately 192 acres of land within the Central Waterfront area. The lands are situated between the Gardiner Expressway and Lake Shore Boulevard West, with access points from Lake Shore Boulevard West, Dufferin Street and Strachan Avenue. Exhibition Place is an important asset to the City, hosting major public events and celebrations and is the City's only dedicated downtown "exhibition" ground. It is also an important venue for trade and consumer shows, conferences and major sports and entertainment events. The CHLA provides a comperehensive assesssment of the heritage of Exhibition Place and its significance. Exhibition Place is home to a remarkable collection of heritage buildings set in a heritage landscape tracing its origin back to the original Provincial Exhibition. There are 18 listed or designated buildings on the site, many surrounded by unique landscaped open spaces which reflect the character and era of the buildings and structures they support. The site also includes interpretative installations, landmark entrances, commemorative and historical plaques and public art, as well as known archaeological resources and areas of archaeological potential. Exhibition Place has evolved over time, but it has sustained a dedicated focus on agricultural education and exhibition use. Through its architecture, designed landscapes and the axial planning that characterized the design of exhibition grounds across the continent in the early twentieth century, Exhibition Place remains a unique surviving example of this kind of cultural heritage landscape in North America. Over the years, a number of planning exrecises have focused on Exhibition Place, including some that have referenced a joint planning exercise with Ontario Place. Concurrently, new facilities such as Hotel X and the BMO Field have opened on the grounds. City staff have continued to work with the Exhibition Place Board of Governors and the Province on updated plans for Exhibition Place to identify opportunities and guide change. The Exhibition Place Master Plan and the Cultural Heritage Landscape Assessment will play a critical role in the continued evolution of Exhibition Place, including future business planning and decision making for this unique City-owned property. The Master Plan exercise will be informed by and coordinated with work on the new Exhibition Place Strategic Plan.
The Toronto and East York Community Council recommends that: 1. City Council adopt the recommendations of the Exhibition Place Cultural Heritage Landscape Assessment (CHLA) attached as Attachment 4 to the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District, and direct City Planning staff to utilize the Cultural Heritage Landscape Assessment and its recommendations in the development of the Exhibition Place Master Plan. 2. City Council direct City Planning staff to use the Cultural Heritage Landscape Assessment to inform more detailed study and to bring forward recommendation for inclusion of Exhibition Place as a "significant cultural heritage landscape" on the City's Heritage Register and/or designation under either Part IV or Part V of the Ontario Heritage Act. 3. City Council adopt the proposed Master Plan study framework as described in the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District to guide on-going work on the Master Plan. 4. City Council direct City Planning staff to undertake public consultations on the development of the Master Plan, including consultations with various stakeholder groups, the community at large and the Indigenous community. 5. City Council request the Province of Ontario to work jointly with the City on the revitalization of Ontario Place and develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 6. City Council forward a copy of the report (April 10, 2019) from the Director, Community Planning, Toronto and East York District to the Board of Governors of Exhibition Place for its information and direct City Planning staff to work with the Exhibition Place Board of Governors to coordinate work on the Master Plan with development of the new Strategic Plan for Exhibition Place.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council adopt the recommendations of the Exhibition Place Cultural Heritage Landscape Assessment (CHLA) attached at Attachment 4 to the report dated April 10, 2019 from the Director, Community Planning, Toronto and East York District, and direct City Planning staff to utilize the CHLA and its recommendations in the development of the Exhibition Place Master Plan. 2. City Council direct City Planning staff to use the CHLA to inform more detailed study and to bring forward recommendation for inclusion of Exhibition Place as a "significant cultural heritage landscape" on the City's Heritage Register and/or designation under either Part IV or Part V of the Ontario Heritage Act. 3. City Council adopt the proposed Master Plan study framework as described in this report to guide on-going work on the Master Plan. 4. City Council direct City Planning staff to undertake public consultations on the development of the Master Plan, including consultations with various stakeholder groups, the community at large and the Indigenous community. 5. City Council request that the Province of Ontario work jointly with the City on the revitalization of Ontario Place and develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 6. City Council forward a copy of this report to the Board of Governors of Exhibition Place for its information and direct City Planning staff to work with the Exhibition Place Board of Governors to coordinate work on the Master Plan with development of the new Strategic Plan for Exhibition Place.
TE5.27amended
Opened in 1971, Ontario Place was envisioned as a "provincial showcase" of the Province's history, culture, economy and peoples. Inspired by Expo '67, the design was conceived by highly renowned Canadian designers Eberhard Zeidler (architecture) with Michael Hough (landscape architecture). Ontario Place has since been recognized internationally as an urban waterfront park and iconic part of Toronto's Central Waterfront. Due to declining attendance, the facility was partially closed in 2012 to consider redevelopment and a reimaging of Ontario Place. In 2014, the Minister's Special Advisory Panel on Ontario Place released a report based on a comprehensive, Province wide consultation process. The report recognized the importance of public access and retention of parkland with a dynamic mix of uses to re-establish Ontario Place as a waterfront destination. Building on this vision, Trillium Park and the William G. Davis Trail opened in 2017, followed by the reopening of a refurbished Cinesphere. According to some reports, these recent investments in Ontario Place provided a significant boost in attendance in recent years. On January 18, 2019, the Government of Ontario announced its intent to release an Expression of Interest (EOI) to seek development concepts for Ontario Place. The announcement outlined specific parameters for development. The provincial government's stated vision for Ontario Place is to create "a world-class year round destination that will attract local, provincial and international visitors - with potential landmarks such as sports and entertainment attractions and retail." In advance of the EOI's expected release in the spring of 2019, the Toronto and East York Community Council established a Subcommittee on Ontario Place in order to solicit feedback from the public regarding their views and thoughts on the future of Ontario Place, and on the principles that should inform the redevelopment of the site. The Subcommittee's first public meeting was held on March 5, 2019. This report: Summarizes the public deputations and communications received by the Subcommittee; Sets out principles to guide the City in its discussions with the Province regarding the revitalization of Ontario Place; Provides an update regarding the status of consultations with the Mississaugas of the Credit First Nation; Provides an update on the ongoing heritage evaluation of Ontario Place being undertaken by City staff; and Identifies opportunities to coordinate planning and urban design initiatives across Ontario Place and Exhibition Place, including the Exhibition Place Master Plan process. As the owner of the adjacent Exhibition Place, the City of Toronto has a long-standing interest in the future of Ontario Place. Together, these facilities form an important component of the waterfront. The City's interests in and vision for the future of both properties are described in the Central Waterfront Secondary Plan (CWSP). Since 2003, the Central Waterfront Secondary Plan has informed the City's position on the future of Ontario Place directly and indirectly in the form of four Core Principles as follows: 1. Removing Barriers/Making Connections; 2. Building a Network of Spectacular Waterfront Parks & Public Spaces; 3. Promoting a Clean & Green Environment; and 4. Creating Dynamic & Diverse New Communities. At the March 5, 2019 Subcommittee meeting on Ontario Place, the Director of Community Planning, Toronto and East York District provided a presentation on Ontario Place that summarized the historical and current context of the site. Approximately 34 speakers provided the subcommittee with their comments regarding the Province's initiative. The subcommittee also received 28 written submissions. City staff were directed to report back on the substance of the public's comments to the April 24, 2019 meeting of the Toronto and East York Community Council. City staff were also directed to: consult with the Mississaugas of the Credit First Nation on the development of principles for the revitalization of Ontario Place; evaluate the inclusion of the site into the City's Heritage Register; and consider opportunities for coordinated planning and urban design initiatives with Exhibition Place. In response to the Subcommittee's directions, this report provides a summary of six key themes heard at the March 5 meeting, as well as updates on the status of ongoing consultations. The six key themes are as follows: 1. Public Ownership and Access; 2. Establishing and Strengthening Connections; 3. Indigenous Representation; 4. Cultural and Landscape Heritage; 5. Establish a Mix of Non-Residential Uses; and 6. More Consultation Required. After assessing the feedback received from the public, City staff are of the view that the current Central Waterfront Secondary Plan Core Principles remain an appropriate framework to guide the revitalization of Ontario Place. It is recommended that these principles be refined and expanded to reflect Ontario Place's unique context and comments from the public. Furthermore, given the level of public interest in Ontario Place, as well as its proximity to Exhibition Place and the City's interest in coordinating planning and urban design initiatives between the two facilities, two additional principles related to governance and transparency are also recommended. The refined and expanded principles shown in Recommendation 1 of this report are intended to provide a framework for the City's ongoing consultations with stakeholders and continuing dialogue with the Province regarding the revitalization of Ontario Place. They are also intended to be read and interpreted within the context of the in-force Central Waterfront Secondary Plan. In terms of consultation, staff from the City's Indigenous Affairs Office have begun the process of discussions on the principles identified to date, including the preliminary principle that the City should seek the preservation of existing Indigenous place-making features (e.g. the Moccasin Identifier Project in Trillium Park) and identify future opportunities for appropriate recognition, celebration and commemoration. Consultations will continue with the Mississaugas of the Credit First Nation and, given the importance of the waterfront to many Indigenous communities and other interested parties on an ongoing basis. Heritage Preservation staff are in the process of preparing a report to include the property on the City's Heritage Register in accordance with the Subcommittee's direction. A separate report on Exhibition Place, summarizing the findings of the Cultural Heritage Landscape Assessment and next steps for the site's Master Planning exercise, will also be before the April 24th meeting of the Toronto and East York Community Council. A map showing Ontario Place is provided in Attachment 2 of this report.
The Toronto and East York Community Council recommends that: 1. City Council adopt the following Proposed Guiding Principles for the Revitalization of Ontario Place. Based on the Central Waterfront Secondary Plan (CWSP), the principles have been revised and expanded to reflect Ontario Place's unique context as well as feedback received from the public. The principles, as shown below, are intended to be read and interpreted in the context of the Central Waterfront Secondary Plan; a. Removing Barriers/Making Connections i. The City of Toronto should work jointly with the Province of Ontario on the integration of planning, programming and governance and consider rationalizing land ownership matters at Ontario Place and Exhibition Place in order to realize natural synergies between the two properties; and ii. Explore opportunities to reduce the barrier effect of Lake Shore Boulevard West between Exhibition Place and Ontario Place. iii. Ensure any future planning along Lake Shore Boulevard West is coordinated with a strategy to improve connectivity between the two properties, and provides a human-scaled edge to the popular Martin Goodman Trail; b. Building a Network of Spectacular Waterfront Parks and Public Spaces i. Secure and enhance public access for the full length of the Ontario Place shoreline. ii. Retain Trillium Park and the William Davis Trail as key place-making features at Ontario Place. iii. Explore low-impact recreational uses for the West Island shoreline; and iv. Consult with Indigenous peoples, including the Mississaugas of the Credit First Nation on opportunities to weave Indigenous placemaking into the fabric of Ontario Place; c. Promoting a Clean and Green Environment i. Utilize findings of the Council-endorsed Waterfront Transit Network Plan to improve access to, from and between Ontario Place and Exhibition Place. ii. Explore opportunities to consolidate large expanses of surface parking below grade in order to create a more walkable and transit-supportive environment; iii. Implement the City's draft biodiversity strategy, build on the success of Trillium Park, extend green corridors into Exhibition Place; and iv. Protect and strengthen the site's shoreline Natural Heritage features; d. Creating Dynamic and Diverse New Communities i. The City of Toronto should seek to partner with the Province of Ontario on a coordinated consultation strategy for the redevelopment of both Ontario Place and Exhibition Place. This should involve consultation with local, regional and provincial-wide stakeholders; and ii. Ontario Place should include a mix of non-residential uses and activities that reflect its waterfront location and rebuild its original goal of being a showcase and destination for Ontario; e. Openness and Transparency i. Make decisions through public process, with full transparency of the governance decision-making processes; f. Responsiveness to the Broader Community i. Conduct inclusive and meaningful consultations, including the City, Toronto residents, Indigenous peoples and the broader citizens of Ontario. Make decisions in the broader public interest. 2. City Council request the Province of Ontario to work jointly with the City on the revitalization of Ontario Place and to develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 3. City Council authorize the City Manager and the Deputy City Manager, Infrastructure and Development Services, in consultation with the Mayor, the Chair of the Ontario Place Subcommittee and the Chair of the Exhibition Place Board, to engage in discussions with the Province on a joint planning and public consultation process for the revitalization of Ontario Place and Exhibition Place, subject to the guiding principles adopted by City Council. 4. City Council require an open and transparent decision-making process with regard to evaluating proposals for the revitalization of Ontario Place, that includes public and stakeholder consultation and uses the guiding principles adopted by City Council, and request the City Manager and the Deputy City Manager, Infrastructure and Development Services to report back on details of any proposed evaluation plan before any evaluation process begins. 5. City Council forward a copy of the report (April 5, 2019) from the Director, Community Planning, Toronto and East York District to the Board of Governors of Exhibition Place for its information.
Staff recommendation as filed
The Director, Community Planning, Toronto and East York District recommends that: 1. City Council adopt the following Proposed Guiding Principles for the Revitalization of Ontario Place. Based on the Central Waterfront Secondary Plan (CWSP), the principles have been revised and expanded to reflect Ontario Place's unique context as well as feedback received from the public. The principles, as shown below, are intended to be read and interpreted in the context of the CWSP; a. Removing Barriers/Making Connections i. The City of Toronto should work jointly with the Province of Ontario on the integration of planning, programming and governance and consider rationalizing land ownership matters at Ontario Place and Exhibition Place in order to realize natural synergies between the two properties; and ii. Explore opportunities to reduce the barrier effect of Lake Shore Boulevard West between Exhibition Place and Ontario Place. iii. Ensure any future planning along Lake Shore Boulevard West is coordinated with a strategy to improve connectivity between the two properties, and provides a human-scaled edge to the popular Martin Goodman Trail; b. Building a Network of Spectacular Waterfront Parks and Public Spaces i. Secure and enhance public access for the full length of the Ontario Place shoreline. ii. Retain Trillium Park and the William Davis Trail as key place-making features at Ontario Place. iii. Explore low-impact recreational uses for the West Island shoreline; and iv. Consult with Indigenous peoples, including the Mississaugas of the Credit First Nation on opportunities to weave Indigenous placemaking into the fabric of Ontario Place; c. Promoting a Clean and Green Environment i. Utilize findings of the Council-endorsed Waterfront Transit Network Plan to improve access to, from and between Ontario Place and Exhibition Place. ii. Explore opportunities to consolidate large expanses of surface parking below grade in order to create a more walkable and transit-supportive environment; iii. Implement the City's draft biodiversity strategy, build on the success of Trillium Park, extend green corridors into Exhibition Place; and iv. Protect and strengthen the site's shoreline Natural Heritage features; d. Creating Dynamic and Diverse New Communities i. The City of Toronto should seek to partner with the Province of Ontario on a coordinated consultation strategy for the redevelopment of both Ontario Place and Exhibition Place. This should involve consultation with local, regional and provincial-wide stakeholders; and ii. Ontario Place should include a mix of non-residential uses and activities that reflect its waterfront location and rebuild its original goal of being a showcase and destination for Ontario; e. Openness and Transparency i. Make decisions through public process, with full transparency of the governance decision-making processes; f. Responsiveness to the Broader Community i. Conduct inclusive and meaningful consultations, including the City, Toronto residents, Indigenous peoples and the broader citizens of Ontario. Make decisions in the broader public interest. 2. City Council request that the Province of Ontario work jointly with the City on the revitalization of Ontario Place and develop a coordinated planning process that leverages the opportunities and synergies of both the Ontario Place and Exhibition Place sites, and has regard for the City's Guiding Principles, City objectives for the development of the central waterfront, and existing City and Exhibition Place plans. 3. City Council authorize the City Manager and the Deputy City Manager of Infrastructure and Development Services to engage in discussions with the Province on a joint planning and public consultation process for the revitalization of Ontario Place and Exhibition Place. 4. City Council forward a copy of this report to the Board of Governors of Exhibition Place for its information.
TE5.28adopted
This report provides information, and identifies a preliminary set of issues regarding the development proposal to add a six-storey long-term care building at 150 Dunn Avenue. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the Zoning By-law Amendment application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 150 Dunn Avenue, together with the Ward Councillor. 2. Notice for the community consultation meeting is given to landowners and residents within 120 metres of the application site, and to additional residents, institutions, and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 150 Dunn Avenue, together with the Ward Councillor. 2. Notice for the community consultation meeting is given to landowners and residents within 120 metres of the application site, and to additional residents, institutions, and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.29amended
10-30 Dawes Road- Zoning By-law Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application for two residential towers located at 10-30 Dawes Road. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 10-30 Dawes Road together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 10-30 Dawes Road together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.30amended
1075 Bay Street - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application located at 1075 Bay Street for a 66-storey mixed-use building. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 1075 Bay Street, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. 3. The Director, Community Planning, Toronto and East York District and the applicant, in consultation with City Planning, Transportation Services, Parks, Forestry and Recreation and any other necessary City officials, to create a working group and to consult with the local community as part of the Site Plan process, including the local residents association and other stakeholders, on the following prior to the issuance of Final Site Plan Approval pursuant to Section 114 of the City of Toronto Act: a construction and traffic management plan, landscape and public realm plans, building materials and lighting, and other issues as identified by the Ward Councillor.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 1075 Bay Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.31amended
This report provides information and identifies a preliminary set of issues regarding the application located at 95 St. Joseph Street for a mixed-use building with 15- and 39-storey components. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 95 St. Joseph Street, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 95 St Joseph Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.32amended
This report provides information and identifies a preliminary set of issues regarding the application for an 18 storey seniors' residence located at 954-958 Broadview Avenue and 72 Chester Hill Road. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting to be held in May for the application located at 954-958 Broadview Avenue and 72 Chester Hill Road together with the Ward Councillor. 2. The community consultation notice be expanded beyond the 120 meters in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. 3. City Planning to meet with the Ward Councillor and representatives from the local residents associations including Helliwell Place, Playter and Chester Hill Cambridge Thorncliffe to identify their concerns and provide an opportunity for their feedback. 4. The Letter from the Heliwell Place Resident's Association (TESupp. 5.32.3) be referred to Community Planning Staff for consideration. 5. City Planning in consultation with the Ward Councillor convene a stakeholder committee to address local concerns.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 954-958 Broadview Avenue and 72 Chester Hill Road together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.33amended
78-90 Queen's Park - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application for a nine-storey institutional building located at 78-90 Queen's Park. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 78-90 Queen's Park together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 78-90 Queen's Park together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.34adopted
545 Lake Shore Boulevard West - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application for three mixed use buildings located at 545 Lake Shore Boulevard West. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. A community consultation meeting was held on March 19, 2019. Planning staff are of the opinion that the application in its current form is not supportable due to the overall building height and massing, proposed setbacks and the impacts on the heritage building and public realm.
The Toronto and East York Community Council directed: 1. Additional mailing costs resulting from an expanded notification area for the community consultation meeting held on March 19, 2019 beyond 120 metres from the site be borne by the applicant. 2. Staff continue to work with the applicant to address issues identified in this report including but not limited to heritage conservation, height, massing, setbacks and public realm enhancements.
Staff recommendation as filed
The City Planning Division recommends that: 1. Additional mailing costs resulting from an expanded notification area for the community consultation meeting held on March 19, 2019 beyond 120 metres from the site be borne by the applicant. 2. Staff continue to work with the applicant to address issues identified in this report including but not limited to heritage conservation, height, massing, setbacks and public realm enhancements.
TE5.35amended
193-201 Church Street - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application located at 193-201 Church Street. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 64-86 Bathurst Street, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. 3. The Director, Community Planning, Toronto and East York District and the applicant, in consultation with City Planning, Transportation Services, Parks, Forestry and Recreation and any other necessary City officials, to create a working group and to consult with the local community as part of the Site Plan process, including the local residents association and other stakeholders, on the following prior to the issuance of Final Site Plan Approval pursuant to Section 114 of the City of Toronto Act: a construction and traffic management plan, landscape and public realm plans, building materials and lighting, and other issues as identified by the Ward Councillor.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 193-201 Church Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.36amended
This report provides information and identifies a preliminary set of issues regarding the application for a mixed-use development located at 985 Woodbine Avenue and 2078, 2086, 2100, 2102 and 2106 Danforth. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff to schedule a community consultation meeting for the application located at 985 Woodbine Avenue and 2078, 2086, 2100, 2102 and 2106 Danforth together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 985 Woodbine Avenue and 2078, 2086, 2100, 2102 and 2106 Danforth together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.37amended
689 King Street West - Zoning Amendment Application - Preliminary Report
This report provides information and identifies a preliminary set of issues regarding the application located at 689 King Street West. Staff are currently reviewing the application, which has been circulated to all appropriate agencies and City divisions for comment. It is City Planning staff's opinion that the proposed building is not supportable in its current form due to its height, lack of setbacks and stepbacks, and transition to the surrounding context. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor.
The Toronto and East York Community Council directed: 1. Staff schedule a community consultation meeting for the lands pertaining to 689 King Street West, which includes the provision of light refreshments and, when required, childcare and accessibility resources including sign language interpretation at the sole cost of the applicant, together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
Staff recommendation as filed
The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 689 King Street West together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant.
TE5.38adopted
Construction Staging Area Time Extension - Bathurst Street - 578 Front Street West
As the Toronto Transit Commission (TTC) operates a transit service on Bathurst Street, City Council approval of this report is required. A mixed-use building consisting of four residential buildings is currently being constructed by Bathurst and Front Development Ltd. at the lands municipally known as 578 Front Street West. The site is bounded by Niagara Street to the north, existing residential uses (560 Front Street West) to the east, Front Street West to the south and Bathurst Street to the west. Temporary 30 day permits were provided by to the site during the election break of 2018. A construction staging area for the development has been setup within the east sidewalk and a portion of the northbound curb lane on Bathurst Street abutting the site. City Council, at its meeting on October 5, 2016, approved the subject construction staging area on Bathurst Street, from September 8, 2016 to July 31, 2018. 2018). Construction staging area for the development has been setup within the east sidewalk and a portion of the northbound curb lane on Bathurst Street abutting the site. City Council, at its meeting on October 5, 2016, approved the subject construction staging area on Bathurst Street, from September 8, 2016 to July 31, 2018. Transportation Services is requesting approval to extend the duration of the subject construction staging area for a period of 5 months (i.e. August 1, 2018 to December 31, 2018). Transportation Services is requesting this construction staging be extended from May 31, 2019 to June 30, 2019. The construction staging operations for the development also take place on the north side of Front Street West and south side of Niagara Street abutting the site. Matters related to the existing construction staging areas on Front Street West and Niagara Street will be discussed in a companion report "Construction Staging Area Time Extension - 578 Front Street West and Niagara Street" requiring Toronto and East York Community Council approval.
The Toronto and East York Community Council recommends that: 1. City Council approve the continuation of the closure of the east sidewalk and a portion of the northbound curb lane on Bathurst Street, between Front Street West and a point 71.0 metres north, from May 31, 2019 to June 30, 2019. 2. City Council approve the continuation of stopping prohibition at all times on the east side of Bathurst Street, between Front Street West and a point 87.5 metres north, from May 31, 2019 to June 30, 2019. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct Bathurst Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the continuation of the closure of the east sidewalk and a portion of the northbound curb lane on Bathurst Street, between Front Street West and a point 71.0 metres north, from May 31, 2019 to June 30, 2019. 2. City Council approve the continuation of stopping prohibition at all times on the east side of Bathurst Street, between Front Street West and a point 87.5 metres north, from May 31, 2019 to June 30, 2019. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct that Bathurst Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.39adopted
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. EllisDon Corporation is constructing a 17-storey institutional building at the lands located at 11 and 33 Centre Avenue and 80 Chestnut Street. The site is bounded by an existing commercial building (55 Centre Avenue and 108-110 Chestnut Street to the north, Chestnut Street to the east, Armoury Street to the south and Centre Avenue to the west. Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound lane on Centre Avenue and the west sidewalk and a portion of the southbound lane on Chestnut Street, for a period of 24 months to accommodate construction staging areas. Pedestrian movements will be accommodated within the closed curb lanes.
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 1.9 metre wide portion of the northbound curb lane on Centre Avenue, between Armoury Street and a point 102 metres north, from May 1, 2019 to May 1, 2021. 2. Authorized the closure of the west sidewalk and a 2.2 metre wide portion of the southbound curb lane on Chestnut Street, between Armoury Street and a point 67 metres north, from May 1, 2019 to May 1, 2021. 3. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the east side of Centre Avenue, between a point 39.6 metres north of Armoury Street and a point 115 metres north of Armoury Street. 4. Rescinded the existing parking prohibition in effect at all times on the east side of Centre Avenue, between Armoury Street and a point 39.6 metres north. 5. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 6. Rescinded the existing parking prohibition in effect at all times on the west side of Chestnut Street, between Armoury Street and a point 29 metres north. 7. Prohibited stopping at all times on the east side of Centre Avenue, between Armoury Street and a point 115 metres north. 8. Prohibited stopping at all times on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 9. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed Centre Avenue and Chestnut Street be returned to their pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 1.9 metre wide portion of the northbound curb lane on Centre Avenue, between Armoury Street and a point 102 metres north, from May 1, 2019 to May 1, 2021. 2. Toronto and East York Community Council authorize the closure of the west sidewalk and a 2.2 metre wide portion of the southbound curb lane on Chestnut Street, between Armoury Street and a point 67 metres north, from May 1, 2019 to May 1, 2021. 3. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the east side of Centre Avenue, between a point 39.6 metres north of Armoury Street and a point 115 metres north of Armoury Street. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Centre Avenue, between Armoury Street and a point 39.6 metres north. 5. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 6. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the west side of Chestnut Street, between Armoury Street and a point 29 metres north. 7. Toronto and East York Community Council prohibit stopping at all times on the east side of Centre Avenue, between Armoury Street and a point 115 metres north. 8. Toronto and East York Community Council prohibit stopping at all times on the west side of Chestnut Street, between Armoury Street and a point 72 metres north. 9. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community Council direct that Centre Avenue and Chestnut Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.40adopted
Construction Staging Area - 171 East Liberty Street
As the Toronto Transit Commission (TTC) operates a transit service on East Liberty Street, City Council approval of this report is required. A 28-storey condominium building is currently being constructed by Lifetime Developments at 171 East Liberty Street. The site is bounded by East Liberty Street to the north, existing commercial (Lifetime) property to the west, private laneways to the east and south. A construction staging area for the development will be set up within the south sidewalk and a portion of the eastbound lane on the south side of East Liberty Street abutting the site. A protected public walkway will be provided within a portion of the eastbound curb lane on East Liberty Street fronting the site. Transportation Services is requesting closure of a portion of the eastbound lane on East Liberty Street for construction staging for a period of 31 months, from May 15, 2019 to December 31, 2021.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the sidewalk and 3 metres of the curb lane on East Liberty Street between Lynn Williams Street and a point 102 metres east and the provision of a covered public sidewalk within the closed eastbound lane, from May 15, 2019 to December 31, 2021. 2. City Council rescind the existing standing prohibition in effect at all times on the south side of East Liberty Street, between Lynn Williams Street and a point 102 metres east from May 15, 2019 to December 31, 2021. 3. City Council prohibit stopping at all times on the south side of East Liberty Street between Lynn Williams Street and a point 102 metres east, from May 15, 2019 to December 31, 2021. 4. City Council direct the applicant to posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. City Council direct the applicant to work with STEPS Initiative to provide and install public art including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. City Council direct that East Liberty Street be returned to its pre-construction when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council approve the closure of the sidewalk and 3 metres of the curb lane on East Liberty Street between Lynn Williams Street and a point 102 metres east and the provision of a covered public sidewalk within the closed eastbound lane, from May 15, 2019 to December 31, 2021. 2. City Council rescind the existing standing prohibition in effect at all times on the south side of East Liberty Street, between Lynn Williams Street and a point 102 metres east from May 15, 2019 to December 31, 2021. 3. City Council prohibit stopping at all times on the south side of East Liberty Street between Lynn Williams Street and a point 102 metres east, from May 15, 2019 to December 31, 2021. 4. City Council direct the applicant to posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. City Council direct the applicant to work with STEPS Initiative to provide and install public art including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. City Council direct that East Liberty Street be returned to its pre-construction when the project is complete.
TE5.41adopted
Construction Staging Area Time Extension - 578 Front Street West and Niagara Street
This staff report is also about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. A mixed-use building consisting of four residential buildings is currently being constructed, by Bathurst and Front Development Ltd. at the lands municipally known as 578 Front Street West. The site is bounded by Niagara Street to the north, existing residential uses, 560 Front Street West to the east, Front Street West to the south and Bathurst Street to the west. Temporary 30 day permits were provided by to the site during the election break of 2018. Construction staging areas for the development have been setup within the north sidewalk and a portion of the westbound curb lane on Front Street West and the south sidewalk and a portion of the eastbound lane on Niagara Street abutting the site. Toronto and East York Community Council, at its meeting on September 7, 2016, approved the subject construction staging areas on Front Street West and Niagara Street, from September 8, 2016 to July 31, 2018 and from September 8, 2016 to October 31, 2018, respectively. Transportation Services is requesting approval to extend the duration of the existing construction staging area on Front Street West from May 31, 2019 to June 30, 2019. Also, approval is being requested to extend the duration of the existing construction staging area on Niagara Street from May 31, 2019 to June 30, 2019. A construction staging area for the development has also been setup within the east sidewalk and a portion of the northbound curb lane on Bathurst Street abutting the site. Matters related to the existing construction staging on Bathurst Street will be discussed in a companion report, Bathurst Street, 578 Front Street West, requiring City Council approval. City Council, at its meeting on October 5, 2016, approved the subject construction staging area on Bathurst Street, from September 8, 2016 to July 31, 2018. 2018. Consequently, the duration of the existing construction staging on Bathurst Street has been requested to be extended from May 31, 2019 to June 30, 2019.
The Toronto and East York Community Council: 1. Approved the continuation of the closure of the north sidewalk and a portion of the westbound curb lane on Front Street West, between Bathurst Street and a point 114.9 metres further east, from June 1, 2019 to June 30, 2019. 2. Approved the continuation of the closure of the south sidewalk and a portion of the curb lane on Niagara Street, between Bathurst Street and a point 102 metres east, from June 1, 2019 to June 30, 2019. 3. Approved the continuation of the stopping prohibition in effect at all times on both side of Front Street West, between Bathurst Street and a point 129.5 metres east, from June 1, 2019 to June 30, 2019. 4. Approved the continuation of the stopping prohibition in effect at all times on both sides of Niagara Street, between Bathurst Street and a point 118 metres east, from June 1, 2019 to June 30, 2019. 5. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed the applicant to continue securing off-street parking spaces in sufficient number to replace the on-street permit parking spaces that were displaced by these construction staging areas. 8. Directed the applicant to continue making the replacement spaces available to all 6E on-street parking permit holders, and prominently posting directions for permit holders at the location of the displaced on-street spaces. 9. Directed that Front Street West be returned to its pre-construction traffic and parking regulations when the project is complete. 10. Directed that Niagara Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the continuation of the closure of the north sidewalk and a portion of the westbound curb lane on Front Street West, between Bathurst Street and a point 114.9 metres further east, from June 1, 2019 to June 30, 2019. 2. Toronto and East York Community Council approve the continuation of the closure of the south sidewalk and a portion of the curb lane on Niagara Street, between Bathurst Street and a point 102 metres east, from June 1, 2019 to June 30, 2019. 3. Toronto and East York Community Council approve the continuation of the stopping prohibition in effect at all times on both side of Front Street West, between Bathurst Street and a point 129.5 metres east, from June 1, 2019 to June 30, 2019. 4. Toronto and East York Community Council approve the continuation of the stopping prohibition in effect at all times on both sides of Niagara Street, between Bathurst Street and a point 118 metres east, from June 1, 2019 to June 30, 2019. 5. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct the applicant to continue securing off-street parking spaces in sufficient number to replace the on-street permit parking spaces that were displaced by these construction staging areas. 8. Toronto and East York Community Council direct the applicant to continue making the replacement spaces available to all 6E on-street parking permit holders, and prominently posting directions for permit holders at the location of the displaced on-street spaces. 9. Toronto and East York Community Council direct that Front Street West be returned to its pre-construction traffic and parking regulations when the project is complete. 10. Toronto and East York Community Council direct that Niagara Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.42adopted
Construction Staging Area - 321-333 King Street West
As the Toronto Transit Commission (TTC) operates a transit service on King Street West, City Council approval of this report is required. Empire Communities is constructing a 49-storey residential condominium building at 321-333 King Street West, located on the south side of King Street West between John Street and Blue Jays Way. Transportation Services is requesting approval to close the sidewalk and curb lane on the south side of King Street West for a period of 25 months in order to enable construction of the above mentioned development. Pedestrian operations will be maintained within the closed portion of the existing curb lane on King Street West.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the south sidewalk on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 2. City Council approve the closure of the south curb lane on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 3. City Council rescind the designated taxi cab stand on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 4. City Council prohibit stopping at all times on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct King Street West be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council approve the closure of the south sidewalk on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 2. City Council approve the closure of the south curb lane on King Street West, between a point 61 metres east of Blue Jays Way and a point 36 metres further east from June 1, 2019 to July 1, 2022. 3. City Council rescind the designated taxi cab stand on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 4. City Council prohibit stopping at all times on the south side of King Street West, between a point 45 metres east of Blue Jays Way and a point 33 metres further east. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct that King Street West be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
TE5.43adopted
Construction Staging Area - 497-511 Richmond Street West - Maud Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City policy or by-laws. A 13-storey condominium is being constructed by MOD Developments at 497-511 Richmond Street West located in the south-east quadrant of Richmond Street West and Maud Street. Transportation Services is requesting approval to close the east sidewalk on Maud Street adjacent to this site to facilitate construction operations for a period of 21 months. Pedestrians will be directed to use the west sidewalk on Maud Street.
The Toronto and East York Community Council: 1. Approved the closure of the east sidewalk on Maud Street, between Richmond Street West and Adelaide Street West, from May 1, 2019 to December 31, 2020. 2. Rescinded the existing standing prohibition in effect at all times on both sides of Maud Street, between a point 16 metres south of Richmond Street West and a point 60 metres further south. 3. Rescinded the existing parking prohibition in effect at all times on both sides of Maud Street, between Richmond Street West and Adelaide Street West. 4. Prohibited "Stopping" at all times on both the both sides of Maud Street, from Richmond Street West to Adelaide Street West. 5. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed Maud Street be returned to its pre-construction conditions when the project is completed.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the east sidewalk on Maud Street, between Richmond Street West and Adelaide Street West, from May 1, 2019 to December 31, 2020. 2. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on both sides of Maud Street, between a point 16 metres south of Richmond Street West and a point 60 metres further south. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on both sides of Maud Street, between Richmond Street West and Adelaide Street West. 4. Toronto and East York Community Council prohibit "Stopping" at all times on both the both sides of Maud Street, from Richmond Street West to Adelaide Street West. 5. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct that Maud Street be returned to its pre-construction conditions when the project is completed.
TE5.44amended
Construction Staging Area - Cumberland Street - 826-834 Yonge Street and 2-8 Cumberland Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City policy or by-laws. Great Gulf is constructing a 51-storey residential condominium building at 826-834 Yonge Street and 2-8 Cumberland Street. The site is bounded by existing residential condominium building (1 Yorkville Avenue) to the north, Yonge Street to the east, Cumberland Street to the south and existing commercial buildings (12-14 Cumberland Street) to the west. The development is currently in progress, operating under a monthly Street Occupation Permit. Transportation Services is requesting approval to close the sidewalk and a portion of the eastbound lane on the north side of Cumberland Street for a period of 42 months to enable construction of the above mentioned development.
The Toronto and East York Community Council: 1. Authorized the closure of the north sidewalk and the occupation of a portion of the eastbound curb lane on Cumberland Street, between Yonge Street and a point 52 metres west, May 1, 2019 to October 31, 2022. 2. Rescinded the existing parking machine regulation in effect from 4:00 p.m. to 12:00 a.m., Monday to Friday; 8:00 a.m. to 6:00 p.m. Saturday; 6:00 p.m. to 12:00 a.m. Saturday; and 10:00 a.m. to 12:00 a.m. Sunday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 3. Rescinded the existing commercial loading zone in effect from 6:00 a.m. to 4:00 p.m., Monday to Friday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 4. Prohibited stopping at all times on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 5. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Directed that Cumberland Street be returned to its pre-construction traffic and parking regulations when the project is complete. 8. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the north sidewalk and the occupation of a portion of the eastbound curb lane on Cumberland Street, between Yonge Street and a point 52 metres west, May 1, 2019 to October 31, 2022. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 4:00 p.m. to 12:00 a.m., Monday to Friday; 8:00 a.m. to 6:00 p.m. Saturday; 6:00 p.m. to 12:00 a.m. Saturday; and 10:00 a.m. to 12:00 a.m. Sunday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 3. Toronto and East York Community Council rescind the existing commercial loading zone in effect from 6:00 a.m. to 4:00 p.m., Monday to Friday, on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 4. Toronto and East York Community Council prohibit stopping at all times on the south side of Cumberland Street, between Yonge Street and a point 100 metres west. 5. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. Toronto and East York Community Council direct that Cumberland Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.45adopted
Construction Staging Area - Elizabeth Street and Elm Street - 175 Elizabeth Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. PCL Constructors is constructing a 22-storey building for institutional use at 175 Elizabeth Street, also commonly known as "Sick Kids Patient Support Centre". The site is bounded by Walton Street to the north, industrial use building - 85 Walton Street, a research and education building - 72-78 Elm Street and 675 Bay Street - to the east, Elm Street to the south and Elizabeth Street to the west. Transportation Services is requesting approval to close the east sidewalk and a portion of the northbound lane on Elizabeth Street and the north sidewalk and a portion of the westbound lane on Elm Street for a period of 41 months to accommodate construction staging areas. Pedestrian movements will be accommodated within the closed curb lanes.
The Toronto and East York Community Council: 1. Authorized the closure of the east sidewalk and a 4.0 metre wide portion of the northbound curb lane on Elizabeth Street, between Walton Street and Elm Street, from May 1, 2019 to September 30, 2022. 2. Authorized the closure of the north sidewalk and a 5.2 metre wide portion of the westbound curb lane on Elm Street, between Elizabeth Street and a point 41 metres east, from May 1, 2019 to September 30, 2022. 3. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 3:30 p.m. and 6:30 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m., Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 4. Rescinded the existing parking prohibition in effect from 3:30 p.m. to 6:30 p.m. Monday to Friday, except public holidays, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 5. Rescinded the existing parking prohibition in effect at all times, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 6. Rescinded the existing stopping prohibition in from 3:30 p.m. to 6:30 p.m., Monday to Friday, except public holidays, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 7. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the east side of Elizabeth Street, between Elm Street and Walton Street. 8. Rescinded the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Elm Street and a point 9 metres north. 9. Rescinded the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Walton Street and a point 9 metres south. 10. Rescinded the existing maximum one-hour parking limit in effect from 8:00 a.m. to 6:00 p.m., daily, on the west side of Elizabeth Street, between Elm Street and Gerrard Street West. 11. Rescinded the existing standing prohibition in effect at all times on the west side Elizabeth Street, between Elm Street and Walton Street. 12. Prohibited stopping at all times on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 13. Prohibited stopping at all times on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 14. Prohibited stopping at all times on both sides of Elizabeth Street, between Elm Street and Walton Street. 15. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. Directed Elizabeth Street (except fpr maximum one-hour parking) and Elm Street be returned to pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the closure of the east sidewalk and a 4.0 metre wide portion of the northbound curb lane on Elizabeth Street, between Walton Street and Elm Street, from May 1, 2019 to September 30, 2022. 2. Toronto and East York Community Council authorize the closure of the north sidewalk and a 5.2 metre wide portion of the westbound curb lane on Elm Street, between Elizabeth Street and a point 41 metres east, from May 1, 2019 to September 30, 2022. 3. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 3:30 p.m. and 6:30 p.m. to 9:00 p.m., Monday to Friday; 8:00 a.m. to 9:00 p.m., Saturday; and 1:00 p.m. to 9:00 p.m., Sunday, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect from 3:30 p.m. to 6:30 p.m. Monday to Friday, except public holidays, on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 5. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 6. Toronto and East York Community Council rescind the existing stopping prohibition in from 3:30 p.m. to 6:30 p.m., Monday to Friday, except public holidays, on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 7. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday; and 1:00 p.m. to 9:00 p.m. Sunday, on the east side of Elizabeth Street, between Elm Street and Walton Street. 8. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Elm Street and a point 9 metres north. 9. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the east side Elizabeth Street, between Walton Street and a point 9 metres south. 10. Toronto and East York Community Council rescind the existing maximum one-hour parking limit in effect from 8:00 a.m. to 6:00 p.m., daily, on the west side of Elizabeth Street, between Elm Street and Gerrard Street West. 11. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the west side Elizabeth Street, between Elm Street and Walton Street. 12. Toronto and East York Community Council prohibit stopping at all times on the north side of Elm Street, between Elizabeth Street and a point 61 metres east. 13. Toronto and East York Community Council prohibit stopping at all times on the south side of Elm Street, between Elizabeth Street and a point 60 metres east. 14. Toronto and East York Community Council prohibit stopping at all times on both sides of Elizabeth Street, between Elm Street and Walton Street. 15. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 17. Toronto and East York Community Council direct that Elizabeth Street (except fpr maximum one-hour parking) and Elm Street be returned to pre-construction traffic and parking regulations when the project is complete.
TE5.46amended
Construction Staging Area - 75 The Esplanade - Church Street
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. Transportation Services is requesting approval to close the west sidewalk and curb lane on Church Street for a period of 16 months. Harhay Construction Management Ltd. is building a 29-storey condominium with a total of 308 units, together with ground floor retail and three level underground parking. The site is located on the West side of Church Street, between The Esplanade on the north side and a private lane on the south side. To enable construction, the applicant requires the aforementioned closures.
The Toronto and East York Community Council: 1. Approved the closure of the west sidewalk and southbound parking lane on Church Street, from The Esplanade and a point 49 metres further south of Church Street, from April 29, 2019 to August 31, 2020. 2. Rescinded the existing parking prohibition in effect at all times on the east side of Church Street, from The Esplanade to the south end of Church Street. 3. Rescind the existing parking prohibition in effect at all times on the west side of Church Street, from The Esplanade to a point 30.5 metres south and from a point 41.5 metres south of The Esplanade to the south end of Church Street. 4. Rescinded the existing car-share vehicle parking area on the west side of Church Street, from a point 30.5 metres south of The Esplanade to a point 11 metres further south (see below for agreement with Enterprise CarShare) 5. Prohibited stopping at all times on both sides of Church Street, from the Esplanade to the south end of Church Street. 6. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Directed that Church Street be returned to its pre-construction traffic regulations when the project is completed. 9. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 10. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 12. In areas where no cycling lanes exist, directed the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 13. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 14. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 15. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 16. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Building, adjacent neighbours, local resident groups, and local BIAs. 17. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the west sidewalk and southbound parking lane on Church Street, from The Esplanade and a point 49 metres further south of Church Street, from April 29, 2019 to August 31, 2020. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Church Street, from The Esplanade to the south end of Church Street. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the west side of Church Street, from The Esplanade to a point 30.5 metres south and from a point 41.5 metres south of The Esplanade to the south end of Church Street. 4. Toronto and East York Community Council rescind the existing car-share vehicle parking area on the west side of Church Street, from a point 30.5 metres south of The Esplanade to a point 11 metres further south (see below for agreement with Enterprise CarShare) 5. Toronto and East York Community Council prohibit stopping at all times on both sides of Church Street, from the Esplanade to the south end of Church Street. 6. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. Toronto and East York Community direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. Toronto and East York Community direct that Church Street be returned to its pre-construction traffic regulations when the project is completed.
TE5.47adopted
Construction Staging Area Time Extension - Church Street - 70-72 Carlton Street
Tribute Communities is constructing a 41-storey mixed-use development at 70-72 Carlton Street and 403 Church Street. The site is located in the north-east quadrant of Carlton Street and Church Street. The sidewalk and a portion of the northbound curb lane on the east side of Church Street fronting the site are currently closed to accommodate construction staging operations for the development. Toronto and East York Committee Council, at its meeting on May 2, 2017, approved the subject construction staging area on Church Street, from June 1, 2017 to May 31, 2019. Transportation Services is requesting approval to extend the duration of the construction staging area on Church Street for an additional 18 months (i.e. from June 1, 2019 to November 30, 2020), in order to complete the construction of the development. The developer has requested an extension of the duration of the construction staging area on Church Street, in order to complete the construction of the development. Based on the information provided by the developer, site has experienced a number of construction delays due to inclement weather and an extended amount of time redesigning the substructure and construction four additional levels.
The Toronto and East York Community Council: 1. Approved the continuation of the closure of the sidewalk and the northbound curb lane on Church Street, between Carlton Street and a point 50.5 metres north, from June 1, 2019 to November 30, 2020. 2. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Directed Church Street be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the continuation of the closure of the sidewalk and the northbound curb lane on Church Street, between Carlton Street and a point 50.5 metres north, from June 1, 2019 to November 30, 2020. 2. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Toronto and East York Community Council direct that Church Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.48amended
Construction Staging Area - Dalhousie Street - 215-229 Church Street and 117 Dundas Street East
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Sentinel (Church) Holdings Inc. is constructing a 52-storey mixed-use development at 215-229 Church Street and 117 Dundas Street East. The site is located in the south-east corner of Dundas Street East and Church Street. Transportation Services is requesting approval to close the sidewalk and a portion of the southbound lane on the west side of Dalhousie Street for a period of 48 months. In addition, approval is requested to temporarily convert a section of Dalhousie Street abutting the site from a two-way traffic operation to a one-way northbound traffic operation.
The Toronto and East York Community Council: 1. Authorized the closure of the west sidewalk and a 2.8 metre wide portion of the southbound lane on Dalhousie Street, between Dundas Street East and a point 54 metres south, from May 1, 2019 to April 30, 2023. 2. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and 1:00 p.m. to 9:00 p.m., Sunday on the east side of Dalhousie Street, between a point 33.5 metres south of Dundas Street East and a point 42 metres further south. 3. Rescinded the existing standing prohibition in effect at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south. 4. Rescinded the existing standing prohibition in effect at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 5. Amended the existing one-way traffic operation on Dalhousie Street, between Shuter Street and a point 52 metres north to be in effect from Shuter Street to Dundas Street East. 6. Prohibited stopping at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 7. Prohibited stopping at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south 8. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 9. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 10. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 12. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 13. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 14. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 15. Directed that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 16. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 17. In areas where no cycling lanes exist, direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 18. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 19. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the west sidewalk and a 2.8 metre wide portion of the southbound lane on Dalhousie Street, between Dundas Street East and a point 54 metres south, from May 1, 2019 to April 30, 2023. 2. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m., Monday to Saturday and 1:00 p.m. to 9:00 p.m., Sunday on the east side of Dalhousie Street, between a point 33.5 metres south of Dundas Street East and a point 42 metres further south. 3. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south. 4. Toronto and East York Community Council rescind the existing standing prohibition in effect at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 5. Toronto and East York Community Council amend the existing one-way traffic operation on Dalhousie Street, between Shuter Street and a point 52 metres north to be in effect from Shuter Street to Dundas Street East. 6. Toronto and East York Community Council prohibit stopping at all times on the west side of Dalhousie Street, between Dundas Street East and a point 61.5 metres south. 7. Toronto and East York Community Council prohibit stopping at all times on the east side of Dalhousie Street, between Dundas Street East and a point 64.5 metres south 8. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 9. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 10. Toronto and East York Community Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 11. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 12. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 13. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 14. Toronto and East York Community Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 15. Toronto and East York Community Council direct that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.49amended
Construction Staging Area - 177 Front Street East
As the Toronto Transit Commission (TTC) operates a transit service on Princess Street City Council approval of this report is required. Saddlebrook Management Consultants Inc., is constructing a 30-storey mix-use condominium building with 1531 units, with one level underground parking facility at 177 Front Street East. The site is bounded by The Esplanade to the south, Front Street East to the north, Princess Street to the east and Lower Sherbourne Street to the west. Transportation Services is requesting approval to close the sidewalk and the southbound parking lane on the west side of Princess Street for a period of 47 months. Pedestrian movements will be accommodated on the east side of Princess Street as there are no pedestrian generators on the west side.
The Toronto and East York Community Council recommends that: 1. City Council approve the closure of the sidewalk and the southbound parking lane on the west side of Princess Street from Front Street East to 20 metres north of The Esplanade, from March 29, 2019 to January 31, 2023. 2. City Council rescind the existing permit parking regulation in effect from 2:00 a.m. to 7:00 a.m. on the (even side) west side of Princess Street, from The Esplanade to Front Street East. 3. City Council rescind the existing two-hour maximum parking limit in effect from 8:00 a.m. to 6:00 p.m. on the (even side) west side of Princess Street from The Esplanade to Front Street East. 4. City Council rescind the existing parking machine regulation in effect for, 8:00 a.m. to 9:00 p.m., and from Monday to Saturday; 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Princess Street, between Front Street East and The Esplanade. 5. City Council prohibit stopping at all times on the west side of Princess Street, from Front Street East to The Esplanade. 6. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. City Council direct Princess Street be returned to its pre-construction parking regulations when the project is completed. 14. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 15. In areas where no cycling lanes exist, City Council direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 16. City Council direct the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 17. City Council direct the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the closure of the sidewalk and the southbound parking lane on the west side of Princess Street from Front Street East to 20 metres north of The Esplanade, from March 29, 2019 to January 31, 2023. 2. City Council rescind the existing permit parking regulation in effect from 2:00 a.m. to 7:00 a.m. on the (even side) west side of Princess Street, from The Esplanade to Front Street East. 3. City Council rescind the existing two-hour maximum parking limit in effect from 8:00 a.m. to 6:00 p.m. on the (even side) west side of Princess Street from The Esplanade to Front Street East. 4. City Council rescind the existing parking machine regulation in effect for, 8:00 a.m. to 9:00 p.m., and from Monday to Saturday; 1:00 p.m. to 9:00 p.m., Sunday, on the west side of Princess Street, between Front Street East and The Esplanade. 5. City Council prohibit stopping at all times on the west side of Princess Street, from Front Street East to The Esplanade. 6. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 7. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 8. City Council direct the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 10. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 11. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. City Council direct that Princess Street be returned to its pre-construction parking regulations when the project is completed.
TE5.50amended
Construction Staging Area - 65 King Street East - Colborne Street, Leader Lane
This staff report is about a matter that Community Council has delegated authority to make a final decision provided that it is not amended so that it varies with City policy or by-laws. PCL Constructors Canada Inc. (Toronto) will redevelop the lands located at the municipal addresses of 65-89 King Street East and 46 Colborne Street. The site is located in the south-east quadrant of King Street East and Leader Lane. Existing commercial buildings located at the site and fronting onto King Street East are designated heritage structures. The heritage facades of the existing buildings will be preserved as part of the development proposal. A façade retention steel structure has been installed externally to support the heritage facades while building structure behind the retained facades is reconstructed. Transportation Services is requesting approval to close the north sidewalk and west bound curb lane on Colborne Street and the east sidewalk and portion of the curb lane on Leader Lane for a period of 20 months. (Start date to be confirmed at a later date due to ongoing ECS Water Main Project) with an ending date of December 31, 2020. PCL will not be allowed to occupy Colborne Street until the ECS project has been completed. The construction staging area closure in the curb lane ( north side) of Colborne Street will result in removal of the existing all parking on the south side of Colborne Street from Leader lane to Church Street. Pedestrians will also be directed to walk on the south side sidewalk due to closure of north side sidewalk. Leader Lane will be reduced to one south bound lane and the west side sidewalk will remain open for pedestrians from King Street East to Colborne Street due to east side sidewalk and lane width reduction.
The Toronto and East York Community Council: 1. Approved the closure of the north sidewalk and a 4 metre wide portion of the westbound lane (north side) on Colborne Street, from a point 50 metres west of Church Street to a point 43 metres further west, until December 31, 2020. 2. Rescinded the parking prohibition in effect at all times on the north side of Colborne Street, from Leader Lane to Church Street. 3. Rescinded the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m. Monday to Saturday; 1:00 p.m. to 9:00 p.m. Sunday on the south side of Colborne Street, from Leader Lane to Church Street. 4. Rescinded the existing stopping prohibition in effect at all times on the north side of Colborne Street, from Church Street to a point 49.2 metres west and on the south side of Colborne Street, from Church Street to Colborne Lane. 5. Prohibited stopping at all times on both sides of Colborne Street, between Leader Lane and Church Street. 6. Approved the closure of the east sidewalk and a 1.3 metres wide portion of the southbound lane (east side) on Leader Lane, from King Street East to a point 43 metres further west, until December 31, 2020. 7. Rescinded the existing Commercial Loading Zone on the west side of Leader Lane between and a point 30.5 metres south of King Street East and Colborne Street. 8. Prohibited standing at all times on the west side of Leader Lane, from a point approximately 30.5 metres south of King Street East to Colborne Street. 9. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Directed that Colborne Street and Leader Lane be returned to pre-construction traffic regulations when the project is completed. 12. Directed the applicant to sweep the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 13. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 14. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 15. In areas where no cycling lanes exist, direct the applicant, in consultation with Transportation Services, to install sharrow markings onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclist to safely share the road. 16. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 17. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 18. Directed the applicant to install appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 19. Directed the applicant to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, and local BIAs. 20. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the site.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council approve the closure of the north sidewalk and a 4 metre wide portion of the westbound lane (north side) on Colborne Street, from a point 50 metres west of Church Street to a point 43 metres further west, until December 31, 2020. 2. Toronto and East York Community Council rescind the parking prohibition in effect at all times on the north side of Colborne Street, from Leader Lane to Church Street. 3. Toronto and East York Community Council rescind the existing parking machine regulation in effect from 8:00 a.m. to 9:00 p.m. Monday to Saturday; 1:00 p.m. to 9:00 p.m. Sunday on the south side of Colborne Street, from Leader Lane to Church Street. 4. Toronto and East York Community Council rescind the existing stopping prohibition in effect at all times on the north side of Colborne Street, from Church Street to a point 49.2 metres west and on the south side of Colborne Street, from Church Street to Colborne Lane. 5. Toronto and East York Community Council prohibit stopping at all times on both sides of Colborne Street, between Leader Lane and Church Street. 6. Toronto and East York Community Council approve the closure of the east sidewalk and a 1.3 metres wide portion of the southbound lane (east side) on Leader Lane, from King Street East to a point 43 metres further west, until December 31, 2020. 7. Toronto and East York Community Council rescind the existing Commercial Loading Zone on the west side of Leader Lane between and a point 30.5 metres south of King Street East and Colborne Street. 8. Toronto and East York Community Council prohibit standing at all times on the west side of Leader Lane, from a point approximately 30.5 metres south of King Street East to Colborne Street. 9. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 10. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 11. Toronto and East York Community direct that Colborne Street and Leader Lane be returned to pre-construction traffic regulations when the project is completed.
TE5.51adopted
Construction Staging Area Time Extension - 81 Wellesley Street East
As the Toronto Transit Commission (TTC) operates a transit service on Wellesley Street East, City Council approval of this report is required. Aragon Properties Ltd. is constructing a 28-storey residential condominium building at 81 Wellesley Street East. The site is located the south side of Wellesley Street East, between Church Street and Jarvis Street. The sidewalk, bike lane and a portion of the eastbound lane on the south side of Wellesley Street East fronting the site are currently closed to accommodate construction staging operations for the development. City Council, at its meeting on April 24, 25, 26 and 27, 2018, approved the subject construction staging area on Wellesley Street East, from May 1, 2018 to May 1, 2019. Transportation Services is requesting approval to extend the duration of the construction staging area on Wellesley Street East for an additional 24 months (i.e. from May 16, 2019 to April 30, 2021) in order to complete the construction of the development. The developer has requested an extension of the duration of the construction staging area on Wellesley Street East, in order to complete the construction of the development. Based on the information provided by the developer, site has experienced a number of construction delays due to inclement weather, equipment breakdown, and site logistics due to size of the site and limited available space to manoeuver equipment.
The Toronto and East York Community Council recommends that: 1. City Council approve the continuation of the closure of the south sidewalk on Wellesley Street East, between a point 34 metres east of Church Street and a point 19.5 metres further east, from May 16, 2019 to April 30, 2021. 2. City Council approve the continuation of the closure of the bike lane and a portion of the eastbound curb lane on the south side of Wellesley Street East, between a point 11 metres east of Church Street and a point 68.5 meters further east and the provision of a temporary pedestrian walkway within the closed lane, from May 16, 2019 to April 30, 2021. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Wellesley Street East be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council approve the continuation of the closure of the south sidewalk on Wellesley Street East, between a point 34 metres east of Church Street and a point 19.5 metres further east, from May 16, 2019 to April 30, 2021. 2. City Council approve the continuation of the closure of the bike lane and a portion of the eastbound curb lane on the south side of Wellesley Street East, between a point 11 metres east of Church Street and a point 68.5 meters further east and the provision of a temporary pedestrian walkway within the closed lane, from May 16, 2019 to April 30, 2021. 3. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. City Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. City Council direct the applicant to continue pressure washing the construction site and adjacent sidewalks and roadways weekly, or more frequently as needed to be cleared of any construction debris and made safe. 7. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. City Council direct that Wellesley Street East be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.52adopted
Realignment of Permit Parking Area 3J to exclude the development located at 871 - 899 College Street
Transportation Services is requesting approval from City Council to prohibit the General Manager from accepting applications from residents of, visitors to, and tradespersons at the development properties municipally known as 871 - 899 College Street from residential on-street permit parking. Transportation Services has assessed the realignment of permit parking area 3J and the exclusion of the development property located at 871 - 899 College Street as requested by Toronto and East York Community Council, Item TE4.83, on March 19, 2019. Transportation Services is recommending approval of the exclusion as it will not impact negatively on College Street and neighbouring residents.
The Toronto and East York Community Council recommends that: 1. City Council approve the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of permit parking area "3J", as attached in Appendix A to the report (April 2, 2019) from the Manager, Permits and Enforcement, Parking, Transportation Services.
Staff recommendation as filed
The Manager, Permits and Enforcement, Parking, Transportation Services recommends that: 1. City Council approve the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of permit parking area "3J", as attached in Appendix A of the report dated April 2, 2019 from the Manager, Permits and Enforcement, Parking, Transportation Services.
TE5.53adopted
Installation/Removal of On-Street Accessible Parking Spaces - March 2019 - Delegated
This staff report concerns a matter for which Community Council has delegated authority from City Council to make a final decision. The purpose is to obtain approval for the installation/removal of a number of on-street accessible parking spaces.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Appendix A attached to the report (April 3, 2019) from the Acting Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services Division, recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Appendix A attached to the report (April 3, 2019) from the Acting Director, Traffic Management, Transportation Services.
TE5.54adopted
Accessible Loading Zone - Coe Hill Drive
As the Toronto Transit Commission (TTC) operates a transit service on Coe Hill Drive, City Council approval of this report is required. Transportation Services is requesting approval to implement a designated on-street accessible loading zone, fronting No. 80 Coe Hill Drive, located on the west side of Coe Hill Drive, between Windermere Avenue and The Queensway. The establishment of an accessible loading zone will provide unimpeded curbside access for Wheel-Trans and accessible permit holders. This proposal will not result in the loss of any parking spaces.
The Toronto and East York Community Council recommends that: 1. City Council designate an accessible loading zone to operate at all times on the west side of Coe Hill Drive, between a point 247 metres south of Windermere Avenue and a point 11 metres further south.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council designate an accessible loading zone to operate at all times on the west side of Coe Hill Drive, between a point 247 metres south of Windermere Avenue and a point 11 metres further south.
TE5.55adopted
Accessible Loading Zone - Jennings Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to implement a designated on-street accessible loading zone, in front of the main entrance to Annette Street Public School, located on the north side of Jennings Avenue. The establishment of an accessible loading zone will provide unimpeded curbside access for pick-up and drop-off of students with accessible permits. This proposal will not result in the loss of any permit parking spaces.
The Toronto and East York Community Council: 1. Designated an accessible loading zone to operate from 7:30 a.m. to 6:00 p.m., Monday to Friday, except public holidays, on the north side of Jennings Avenue, between a point 65 metres west of Clendenan Avenue and a point 9.6 metres further west. 2. Rescinded the existing parking prohibition in effect from 9:30 a.m. to 11:00 a.m. and from 1:00 p.m. to 3:00 p.m., Monday to Friday, except public holidays, on the north side of Jennings Avenue, between a point 65 metres west of Clendenan Avenue and a point 9.6 metres further west. 3. Rescinded the existing maximum 10-minute parking in effect from 7:30 a.m. to 9:30 a.m., from 11:00 a.m. to 1:00 p.m. and from 3:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the north side of Jennings Avenue, between a point 65 metres west of Clendenan Avenue and a point 9.6 metres further west.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council designate an accessible loading zone to operate from 7:30 a.m. to 6:00 p.m., Monday to Friday, except public holidays, on the north side of Jennings Avenue, between a point 65 metres west of Clendenan Avenue and a point 9.6 metres further west. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect from 9:30 a.m. to 11:00 a.m. and from 1:00 p.m. to 3:00 p.m., Monday to Friday, except public holidays, on the north side of Jennings Avenue, between a point 65 metres west of Clendenan Avenue and a point 9.6 metres further west. 3. Toronto and East York Community Council rescind the existing maximum 10-minute parking in effect from 7:30 a.m. to 9:30 a.m., from 11:00 a.m. to 1:00 p.m. and from 3:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the north side of Jennings Avenue, between a point 65 metres west of Clendenan Avenue and a point 9.6 metres further west.
TE5.56adopted
Accessible Loading Zone - St. Clair Avenue West
As the Toronto Transit Commission (TTC) operates a transit service on St. Clair Avenue West, City Council approval of this report is required. Transportation Services is requesting approval to implement an accessible loading zone on the south side of St. Clair Avenue West, west of Christie Street, fronting the St. Matthew's Bracondale House, 707 St. Clair Avenue West. The establishment of an accessible loading zone will provide unimpeded curb side access for Wheel-Trans vehicles and patrons.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing parking prohibition in effect at all times on the south side of St. Clair Avenue West, between a point 66 metres west of Christie Street and a point 15 metres further west. 2. City Council designate an accessible loading zone to operate all times, except from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays, on the south side of St. Clair Avenue West, between a point 66 metres west of Christie Street and a point 15 metres further west.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council rescind the existing parking prohibition in effect at all times on the south side of St. Clair Avenue West, between a point 66 metres west of Christie Street and a point 15 metres further west. 2. City Council designate an accessible loading zone to operate all times, except from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays, on the south side of St. Clair Avenue West, between a point 66 metres west of Christie Street and a point 15 metres further west.
TE5.57adopted
Road Alteration - O'Connor Drive and St. Clair Avenue East
In support of the Vision Zero Road Safety Plan, Transportation Services is requesting approval to alter the roadway at the intersection of O'Connor Drive and St. Clair Avenue East in order to improve safety and accessibility for pedestrians. The alterations would include the removal of the westbound right-turn channel to allow for the installation of Accessible Pedestrian Signals (APS) at the intersection, the introduction of a dedicated westbound right-turn lane, as well as curb radii reductions at both the northeast and northwest corners. The alterations would also enhance safety for cyclists through the installation of a left turn bike box on the northwest side of O'Connor Drive. As the Toronto Transit Commission (TTC) operates bus service on O'Connor Drive and St. Clair Avenue East, City Council approval of this report is required.
The Toronto and East York Community Council recommends that: 1. City Council authorize the alteration of the intersection of O'Connor Drive and St. Clair Avenue East, including removal of the westbound right-turn channel, designation of a westbound right-turn lane, reduction of the curb radius at the northeast and northwest corners, removal of a westbound bus lay-by and installation of various cycling infrastructure improvements, generally as shown on Drawing 421G-3036, dated February 2019, included in the report (April 24, 2019) from the Director, Transportation Services, Project Design and Management. 2. In conjunction with the completion of road alteration set out in Recommendation 1 above, City Council designate the northerly westbound lane on St. Clair Avenue East, between O'Connor Drive and a point 30.5 metres east, for westbound right turns only.
Staff recommendation as filed
The Director, Transportation Services, Project Design and Management, recommends that: 1. City Council authorize the alteration of the intersection of O'Connor Drive and St. Clair Avenue East, including removal of the westbound right-turn channel, designation of a westbound right-turn lane, reduction of the curb radius at the northeast and northwest corners, removal of a westbound bus lay-by and installation of various cycling infrastructure improvements, generally as shown on Drawing 421G-3036, dated February 2019, included in the report entitled "Road Alteration - O'Connor Drive and St. Clair Avenue East", dated April 24, 2019, from the Director, Transportation Services, Project Design and Management. 2. City Council, in conjunction with the completion of road alteration set out in Recommendation 1 of the report dated April 24, 2019, from the Director, Transportation Services, Project Design and Management, designate the northerly westbound lane on St. Clair Avenue East, between O'Conner Drive and a point 30.5 metres east, for westbound right turns only.
TE5.58adopted
Parking Amendments - Ripley Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City policy or by-laws. The purpose of this report is to prohibit parking on the north side of Ripley Avenue, between South Kingsway and a point 63 metres east. Residents brought a petition to the Councillor's office to prohibit parking in this area, as their section of the roadway is too narrow, especially in winter, with parking on both sides of the street.
The Toronto and East York Community Council: 1. Prohibited parking at all times on the north side of Ripley Avenue, from South Kingsway to a point 63 metres east.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council prohibit parking at all times on the north side of Ripley Avenue, from South Kingsway to a point 63 metres east.
TE5.59adopted
Parking Amendments - Warren Crescent
As the Toronto Transit Commission (TTC) operate a transit service on Warren Crescent, City Council approval of this report is required. Transportation Services is requesting approval to rescind the alternate-side parking regulation on Warren Crescent, between Varsity Road and Crosby Avenue, and provide parking on the east and south sides of the street at all times. The proposed parking amendment will increase on-street parking availability for permit holders, it will not impact traffic operations, but it may have a negative impact on mechanical street cleaning.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing parking prohibition in effect from December 1 of one year to March 31 of the next following year, inclusive, on the east side of Warren Crescent, between Crosby Avenue and Lundy Avenue. 2. City Council rescind the existing parking prohibition in effect from the 16th day to the last day of each month from April 1 to November 30, inclusive, on the east and south sides of Warren Crescent, between Crosby Avenue and a point 29 metres west of Varsity Road. 3. City Council rescind the existing parking prohibition in effect from the 1st day of each month to the 15th day of each month from April 1 to November 30, inclusive, on the west and north sides of Warren Crescent between Crosby Avenue and Varsity road. 4. City Council rescind the existing parking prohibition in effect from December 1 to March 31 inclusive, on the north side of Warren Crescent, between Lundy Avenue and Varsity Road. 5. City Council prohibit parking at all times on the west and north sides of Warren Crescent, between Crosby Avenue and Varsity Road.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services recommends that: 1. City Council rescind the existing parking prohibition in effect from December 1 of one year to March 31 of the next following year, inclusive, on the east side of Warren Crescent, between Crosby Avenue and Lundy Avenue. 2. City Council rescind the existing parking prohibition in effect from the 16th day to the last day of each month from April 1 to November 30, inclusive, on the east and south sides of Warren Crescent, between Crosby Avenue and a point 29 metres west of Varsity Road. 3. City Council rescind the existing parking prohibition in effect from the 1st day of each month to the 15th day of each month from April 1 to November 30, inclusive, on the west and north sides of Warren Crescent between Crosby Avenue and Varsity road. 4. City Council rescind the existing parking prohibition in effect from December 1 to March 31 inclusive, on the north side of Warren Crescent, between Lundy Avenue and Varsity Road. 5. City Council prohibit parking at all times on the west and north sides of Warren Crescent, between Crosby Avenue and Varsity Road.
TE5.60adopted
Parking Amendments - Heath Street West
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to increase the current parking prohibition on the south side of Heath Street West from a point 21.6 metres east of Deer Park Crescent to a point 34.7 metres further east. This is in response to multiple instances where a parked vehicle would partially block the driveway access for residents between 67 and 71 Heath Street West. This proposal will improve driveway access for residents in the area and will result in the loss of one parking space.
The Toronto and East York Community Council: 1. Rescinded the existing maximum one hour parking regulation in effect from 7:00 a.m. to 6:00 p.m., daily, on the south side of Heath Street West, between Deer Park Crescent and a point 56.3 metres east. 2. Prohibited parking at all times on the south side of Heath Street West, between Deer Park Crescent and a point 56.3 metres east.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council rescind the existing maximum one hour parking regulation in effect from 7:00 a.m. to 6:00 p.m., daily, on the south side of Heath Street West, between Deer Park Crescent and a point 56.3 metres east. 2. Toronto and East York Community Council prohibit parking at all times on the south side of Heath Street West, between Deer Park Crescent and a point 56.3 metres east.
TE5.61adopted
Parking Amendments - Hendrick Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to prohibit standing at all times on the west side and prohibit parking at all times on the east side of Hendrick Avenue, south of St. Clair Avenue West. This is in response to concerns received from the condominium board of 835 St. Clair Avenue West about vehicles parking illegally on west side of Hendrick Avenue which adding difficulty to vehicle entrance or egress manoeuvres.
The Toronto and East York Community Council: 1. Prohibited standing at all times on the west side of Hendrick Avenue, between St. Clair Avenue West and the first lane south. 2. Prohibited parking at all times on the east side of Hendrick Avenue, between St. Clair Avenue West and the first lane south. 3. Rescinded the existing parking prohibition in effect at all times, except each Thursday, from April 1 to November 30, inclusive, on the west side of Hendrick Avenue, between St. Clair Avenue West and the first lane south. 4. Rescinded the existing parking prohibition in effect on each Thursday, from April 1 to November 30, inclusive, on the east side of Hendrick Avenue, between St. Clair Avenue West and the first lane south.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council prohibit standing at all times on the west side of Hendrick Avenue, between St. Clair Avenue West and the first lane south. 2. Toronto and East York Community Council prohibit parking at all times on the east side of Hendrick Avenue, between St. Clair Avenue West and the first lane south. 3. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, except each Thursday, from April 1 to November 30, inclusive, on the west side of Hendrick Avenue, between St. Clair Avenue West and the first lane south. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect on each Thursday, from April 1 to November 30, inclusive, on the east side of Hendrick Avenue, between St. Clair Avenue West and the first lane south.
TE5.62adopted
Parking Amendments - Lonsdale Road
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to extend the existing pick-up/drop-off area on the north side of Lonsdale Road in order to provide additional short-term parking opportunities for parents/guardians to escort their children to and from the Grace Church Daycare (No. 300 Lonsdale Road). This proposal will not adversely impact traffic or parking operations on Lonsdale Road and it will add approximately eight additional parking spaces to the existing pick-up/drop-off area.
The Toronto and East York Community Council: 1. Rescinded the existing parking prohibition in effect at all times on the north side of Lonsdale Road, between Russell Hill Road and a point 60 metres west. 2. Amended the existing parking prohibition in effect from 6:30 p.m. of one day to 7:30 a.m. of the following day, Monday to Friday and at all times, Saturday and Sunday, on the north side of Lonsdale Road, between a point 60 metres west of Russell Hill Road and a point 25 metres further west, to be in effect between a point 15 metres west of Russell Hill Road and a point 70 metres further west. 3. Amended the existing maximum 10-minute parking regulation in effect from 7:30 a.m. to 6:30 p.m., Monday to Friday, on the north side of Lonsdale Road, between a point 60 metres west of Russell Hill Road and a point 25 metres further west, to be in effect between a point 15 metres west of Russell Hill Road and a point 70 metres further west.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the north side of Lonsdale Road, between Russell Hill Road and a point 60 metres west. 2. Toronto and East York Community Council amend the existing parking prohibition in effect from 6:30 p.m. of one day to 7:30 a.m. of the following day, Monday to Friday and at all times, Saturday and Sunday, on the north side of Lonsdale Road, between a point 60 metres west of Russell Hill Road and a point 25 metres further west, to be in effect between a point 15 metres west of Russell Hill Road and a point 70 metres further west. 3. Toronto and East York Community Council amend the existing maximum 10-minute parking regulation in effect from 7:30 a.m. to 6:30 p.m., Monday to Friday, on the north side of Lonsdale Road, between a point 60 metres west of Russell Hill Road and a point 25 metres further west, to be in effect between a point 15 metres west of Russell Hill Road and a point 70 metres further west.
TE5.63adopted
Parking Amendments - Merton Street
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to implement a "No Stopping Anytime" regulation on the south side of Merton Street, fronting the driveway of Nos. 119 and 139 Merton Street. This change will improve the sightlines between motorists travelling east-west and motorists exiting the driveway and will not result in the loss any parking spaces on Merton Street.
The Toronto and East York Community Council: 1. Rescinded the existing parking prohibition in effect at all times, on the south side of Merton Street, from a point 322.1 metres east of Yonge Street and a point 18.2 metres east further east. 2. Prohibited stopping on the south side of Merton Street, from a point 322.1 metres east of Yonge Street to a point 18.2 metres further east.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, on the south side of Merton Street, from a point 322.1 metres east of Yonge Street and a point 18.2 metres east further east. 2. Toronto and East York Community Council prohibit stopping on the south side of Merton Street, from a point 322.1 metres east of Yonge Street to a point 18.2 metres further east.
TE5.64adopted
Parking Amendments - Parkwood Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to implement a "No Stopping Anytime" regulation on the west side of Parkwood Avenue, fronting the entrance to the condominium complex at No. 6 Parkwood Avenue. This proposal would provide residents clear access to the road and would result in the loss of one parking space on the west side of Parkwood Avenue.
The Toronto and East York Community Council: 1. Rescinded the existing maximum one hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., daily, on the west side of Parkwood Avenue, between St. Clair Avenue West and Montclair Avenue. 2. Prohibited stopping at all times on the west side of Parkwood Avenue, between a point 25.2 metres north of St. Clair Avenue West and a point 5.1 metres further north. 3. Authorized parking for a maximum period of one hour from 10:00 a.m. to 6:00 p.m., daily on the on the west side of Parkwood Avenue, between St. Clair Avenue West and a point 25.2 metres north and between a point 30.3 metres north of St. Clair Avenue West and Montclair Avenue.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council rescind the existing maximum one hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., daily, on the west side of Parkwood Avenue, between St. Clair Avenue West and Montclair Avenue. 2. Toronto and East York Community Council prohibit stopping at all times on the west side of Parkwood Avenue, between a point 25.2 metres north of St. Clair Avenue West and a point 5.1 metres further north. 3. Toronto and East York Community Council authorize parking for a maximum period of one hour from 10:00 a.m. to 6:00 p.m., daily on the on the west side of Parkwood Avenue, between St. Clair Avenue West and a point 25.2 metres north and between a point 30.3 metres north of St. Clair Avenue West and Montclair Avenue.
TE5.65adopted
Parking Amendments - Carlaw Avenue
As the Toronto Transit Commission (TTC) operates a transit service on Carlaw Avenue, City Council approval of this report is required. Transportation Services is requesting approval to prohibit standing at all times on the east side of Carlaw Avenue fronting the driveway servicing No. 53 Carlaw Avenue (Gensco Equipment Inc.). The proposed standing prohibition is being requested to prevent motorist from blocking the driveway, and impacting access during loading/unloading activities.
The Toronto and East York Community Council recommends that: 1. City Council rescind the existing parking prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the east side of Carlaw Avenue, between a point 222 metres north of Lake Shore Boulevard East and a point 9 metres further north. 2. City Council prohibit standing at all times on the east side of Carlaw Avenue, between a point 222 metres north of Lake Shore Boulevard East and a point 9 metres further north.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council rescind the existing parking prohibition in effect from 4:00 p.m. to 6:00 p.m., Monday to Friday, except public holidays, on the east side of Carlaw Avenue, between a point 222 metres north of Lake Shore Boulevard East and a point 9 metres further north. 2. City Council prohibit standing at all times on the east side of Carlaw Avenue, between a point 222 metres north of Lake Shore Boulevard East and a point 9 metres further north.
TE5.66adopted
Parking Amendments - Floyd Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to extend the existing no standing anytime regulation on the north side of Floyd Avenue between Pape Avenue and a point 20 metres west, to be in effect from Pape Avenue and a point 38 metres west. This is in response to a concern received from Solid Waste Management Services regarding access issues to the first laneway west of Pape Avenue, north of Floyd Avenue.
The Toronto and East York Community Council: 1. Prohibited standing at all times on the north side of Floyd Avenue, between a point 20 metres west of Pape Avenue and a point 18 metres further west. 2. Amended the existing parking machine regulation in effect on the north side of Floyd Avenue, between Carlaw Avenue and Pape Avenue, from 9:00 a.m. to 6:00 p.m., Monday to Saturday, to operate on the north side of Floyd Avenue, between a point 38 metres west of Pape Avenue and a point 18 metres further west.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council prohibit standing at all times on the north side of Floyd Avenue, between a point 20 metres west of Pape Avenue and a point 18 metres further west. 2. Toronto and East York Community Council amend the existing parking machine regulation in effect on the north side of Floyd Avenue, between Carlaw Avenue and Pape Avenue, from 9:00 a.m. to 6:00 p.m., Monday to Saturday, to operate on the north side of Floyd Avenue, between a point 38 metres west of Pape Avenue and a point 18 metres further west.
TE5.67adopted
Parking Amendments - Hampton Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to extend the existing 15-minute pick-up/drop-off parking zone on the east side of Hampton Avenue to be in effect between Danforth Avenue and a point 79.6 metres south. The proposal will provide two additional spaces for pick-up and drop-off activity for the Children's Circle Daycare.
The Toronto and East York Community Council: 1. Amended the existing maximum 15-minute parking regulation in effect from 7:00 a.m. to 9:00 a.m., from 11:30 a.m. to 1:30 p.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday, on the east side of Hampton Avenue, between Danforth Avenue and a point 22.9 metres south, to be in effect between Danforth Avenue and a point 79.6 metres south. 2. Amended the existing maximum one hour parking regulation in effect from 9:00 a.m. to 11:30 a.m., from 1:30 p.m. to 4:00 p.m., Monday to Friday, and from 9:00 a.m. to 6:00 p.m., Saturday and Sunday, on the east side of Hampton Avenue, between Danforth Avenue and a point 22.9 metres south, to be in effect between Danforth Avenue and a point 79.6 metres south. 3. Rescinded the existing maximum one hour parking regulation in effect from 9:00 a.m. to 6:00 p.m., on the east side of Hampton Avenue between a point 22.9 metres south of Danforth Avenue and a point 74.6 metres north of Garnock Avenue.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council amend the existing maximum 15-minute parking regulation in effect from 7:00 a.m. to 9:00 a.m., from 11:30 a.m. to 1:30 p.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday, on the east side of Hampton Avenue, between Danforth Avenue and a point 22.9 metres south, to be in effect between Danforth Avenue and a point 79.6 metres south. 2. Toronto and East York Community Council amend the existing maximum one hour parking regulation in effect from 9:00 a.m. to 11:30 a.m., from 1:30 p.m. to 4:00 p.m., Monday to Friday, and from 9:00 a.m. to 6:00 p.m., Saturday and Sunday, on the east side of Hampton Avenue, between Danforth Avenue and a point 22.9 metres south, to be in effect between Danforth Avenue and a point 79.6 metres south. 3. Toronto and East York Community Council rescind the existing maximum one hour parking regulation in effect from 9:00 a.m. to 6:00 p.m., on the east side of Hampton Avenue between a point 22.9 metres south of Danforth Avenue and a point 74.6 metres north of Garnock Avenue.
TE5.68adopted
All-way Stop Control - Northcliffe Boulevard and Keywest Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services staff have reviewed the need for an all-way stop control at the intersection of Northcliffe Boulevard and Keywest Avenue, to address residents' concerns regarding safety. Our assessment indicates the criteria as set out in the all-way stop warrant has been satisfied at this intersection. Therefore, all-way stop control should be installed at the intersection of Northcliffe Boulevard and Keywest Avenue.
The Toronto and East York Community Council: 1. Authorized all-way compulsory stop control at the intersection of Northcliffe Boulevard and Keywest Avenue.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize all-way compulsory stop control at the intersection of Northcliffe Boulevard and Keywest Avenue.
TE5.69amended
Traffic Control Signals - Lumsden Avenue and Cedarvale Avenue
As the Toronto Transit Commission (TTC) operates a transit service on Lumsden Avenue, City Council approval of this report is required. Transportation Services is recommending that the installation of traffic control signals at the intersection of Lumsden Avenue and Cedarvale Avenue not be authorized as the technical justification for the installation of traffic control signals is not satisfied.
The Toronto and East York Community Council recommends that: 1. City Council not authorize the installation of traffic control signals at the intersection of Lumsden Avenue and Cedarvale Avenue. 2. City Council request the General Manager, Transportation services to review the intersection of Lumsden Avenue and Cedarvale Avenue, as part of the 2020 Toronto Safety and Local Improvement Program and in coordination with the Vision Zero team, to design the inclusion of enhanced pedestrian safety.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. City Council not authorize the installation of traffic control signals at the intersection of Lumsden Avenue and Cedarvale Avenue.
TE5.70adopted
Speed Limit Reduction - Glenlake Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is requesting approval to reduce the speed limit from 40 km/h to 30 km/h on Glenlake Avenue, between Glendonwynne Avenue and Oakmount Road. The results of the assessment based on the City's 30 km/h speed limit warrant policy and the existing 30 km/h speed limit on a segment of Glenlake Avenue, the speed limit on this segment of Glenlake Avenue is supported to be 30 km/h. This proposal will increase the safety of all road users and maintain consistency of the speed limit.
The Toronto and East York Community Council: 1. Amended the existing speed limit from 40 km/h to 30 km/h on Glenlake Avenue, between Glendonwynne Avenue and Oakmount Road.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council amend the existing speed limit from 40 km/h to 30 km/h on Glenlake Avenue, between Glendonwynne Avenue and Oakmount Road.
TE5.71amended
Speed Hump Poll Results - Delisle Avenue
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended so that it varies with City Policy or by-laws. Transportation Services is reporting on the results of the traffic calming poll undertaken on Delisle Avenue, between Yonge Street and Deer Park Crescent. The poll provided a response rate of less than the 50 percent plus one ballot required by the traffic calming policy needed to confirm that there is a favourable consensus in the community to install speed humps on the subject section of Delisle Avenue. Accordingly, continuing the process to install speed humps on Delisle Avenue, between Yonge Street and Deer Park Crescent, is not recommended.
The Toronto and East York Community Council directed: 1. The installation of traffic calming (speed humps) on Delisle Avenue, between Yonge Street and Deer Park Crescent be authorized. 2. City Solicitor prepare a by-law to alter the roadway to install five speed humps on Delisle Avenue, between Yonge Street and Deer Park Crescent, generally as shown on Drawing No. 421G-2452, dated March 2017 attached to the report (April 2, 2019) from the Acting Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Acting Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming - speed humps - on Delisle Avenue, between Yonge Street and Deer Park Crescent.
TE5.72deferred
Transportation Services is responding to a request from Toronto and East York Community Council, Item TE27.49, to develop and implement a public consultation plan on the proposal to implement Residential On-street Permit Parking on streets that do not have permit parking in the Toronto and East York District. In addition, Transportation Services were asked to undertake on-street parking field surveys to calculate the number of potential parking spaces that can be added to the current permit parking inventory from streets that fall within the (former) boundary of the Toronto and East York District that currently do not have permit parking. Further consideration will also be given to Toronto and East York Community Council, Item TE2.76, to outline implementation timelines.
The Toronto and East York Community Council deferred consideration of the item until its June 25, 2019 meeting.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council receive this report for information.
TE5.73adopted
This staff report is about a matter which Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed a request from Aquavista Bayside Toronto Inc., the owners of the property currently known as 261 Queens Quay East, for the installation of two temporary free-standing pillar signs fronting the premises at 261 Queens Quay East, near the east and west intersections of Merchants Warf. The signs will identify the retail uses which are located out of view on Edgewater Drive and Merchants Wharf adjacent to the subject property. As the signs are temporary in nature, and will not pose a significant negative impact on the public right of way, Transportation Services recommends approval of the encroachment(s).
The Toronto and East York Community Council: 1. Approved the installation of two temporary free-standing pillar signs which will encroach within the public right of way fronting 261 Queens Quay East, indicating the businesses to be located on Edgewater Drive, and Merchants Wharf adjacent to the property subject to the owners entering into an encroachment agreement with the City of Toronto agreeing to, but not limited to the following: a. indemnify the City from and against all actions, suits, claims or demands and from all loss, costs, damages and expenses that may result from such permission granted and providing an insurance policy for such liability for the lifetime of the Agreement in a form as approved by the Deputy City Manager in an amount not less than $5,000,000.00 or such greater amount as the Deputy City Manager and Chief Financial Officer may require; b. agree that the City and/or utility companies may remove the free standing pillar signs in order to install or maintain services within the affected public right of way with no obligations to replace the encroachments; c. maintain the signs at their own expense in good repair and a condition satisfactory to the General Manager, Transportation Services and will not make any additions or modifications to the encroachment beyond what is allowed under the terms of the Agreement; d. pay for the costs of preparing the Agreement and the registration of the Agreement on title; e. remove the signs upon receiving 90 days written notice to do so; f. remove the signs when the permanent streetscape plan is implemented on Queens Quay East by Waterfront Toronto; g. Prior to the issuance of the permit, contact Urban Forestry to enter into any protection plans and/or tree permits for City owned trees that may be in the area and pay any deposits which may be required; and h. accept such additional conditions as the City Solicitor or the General Manager, Transportation Services may deem necessary in the interest of the City.
Staff recommendation as filed
The Manager, Permits and Enforcement, Transportation Services recommends that Toronto and East York Community Council: 1. Approve the installation of two temporary free-standing pillar signs which will encroach within the public right of way fronting 261 Queens Quay East, indicating the businesses to be located on Edgewater Drive, and Merchants Wharf adjacent to the property subject to the owners entering into an encroachment agreement with the City of Toronto agreeing to, but not limited to the following: a. indemnify the City from and against all actions, suits, claims or demands and from all loss, costs, damages and expenses that may result from such permission granted and providing an insurance policy for such liability for the lifetime of the Agreement in a form as approved by the Deputy City Manager in an amount not less than $5,000,000.00 or such greater amount as the Deputy City Manager and Chief Financial Officer may require; b. agree that the City and/or utility companies may remove the free standing pillar signs in order to install or maintain services within the affected public right of way with no obligations to replace the encroachments; c. maintain the signs at their own expense in good repair and a condition satisfactory to the General Manager of Transportation Services and will not make any additions or modifications to the encroachment beyond what is allowed under the terms of the Agreement; d. pay for the costs of preparing the Agreement and the registration of the Agreement on title; e. remove the signs upon receiving 90 days written notice to do so; f. remove the signs when the permanent streetscape plan is implemented on Queens Quay East by Waterfront Toronto; g. Prior to the issuance of the permit, contact Urban Forestry to enter into any protection plans and/or tree permits for City owned trees that may be in the area and pay any deposits which may be required; and h. accept such additional conditions as the City Solicitor or the General Manager of Transportation Services may deem necessary in the interest of the City.
TE5.74adopted
Proposed Relocation of On-Street Electric Vehicle Charging Stations - Wellington Street West
This staff report is about a matter for which this Community Council has delegated authority from City Council to make a final decision. Transportation Services, working with Toronto Hydro, is in the midst of implementing the placement of electric vehicle charging stations associated with the On-Street Electric Vehicle Charging Stations - Pilot Project. In doing so, it was determined that the two Community Council approved locations on the south side of Wellington Street West, east of Clarence Square be shifted the equivalent of one parking space (i.e. 5.5 metres) further to the east to where the charging infrastructure would be better suited to facilitate an easier connection to the underground electrical power source. This report outlines the parking regulation amendments required to implement the requisite shift.
The Toronto and East York Community Council: 1. Authorized the relocation of the existing on-street electric vehicle charging station parking area on the south side of Wellington Street West to be in effect between a point 42.5 metres east of Clarence Square and a point 11 metres further east, and amend the related parking regulations as set out in Attachment 1 to the report (March 28, 2019) from the Director, Transportation Policy and Innovation.
Staff recommendation as filed
The Director, Policy and Innovation, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the relocation of the existing on-street electric vehicle charging station parking area on the south side of Wellington Street West to be in effect between a point 42.5 metres east of Clarence Square and a point 11 metres further east, and amend the related parking regulations as set out in Attachment 1 to the report dated March 28, 2019 from the Director, Transportation Policy and Innovation.
TE5.75adopted
TD Toronto Jazz Festival 2019 in Bloor-Yorkville
This staff report is about a matter that Community Council has delegated authority to make a final decision, provided that it is not amended to be inconsistent with City policy or by-laws. Transportation Services is requesting approval to temporarily close Cumberland Street between Old York Lane and the west side of Bellair Street from Friday June 21, 2019 to Monday June 1, 2019 and Hazelton Avenue between Yorkville Avenue and Scollard Street, from Monday June 24, 2019 to Sunday June 30, 2019 to facilitate the TD Toronto Jazz Festival street event hosted by Toronto Downtown Jazz and amend the necessary traffic regulations.
The Toronto and East York Community Council: 1. Authorized the General Manager, Transportation Services to temporarily close Cumberland Street between Old York Lane and Bellair Street from Friday June 21, 2019 to Monday July 1, 2019 and Hazelton Avenue between Yorkville Avenue and Scollard Street, from Monday June 24, 2019 to Sunday June 30, 2019 to facilitate the TD Toronto Jazz Festival street event and to amend the necessary traffic regulations. 2. Authorized and direct the appropriate City Officials to take the necessary action to give effect to the recommendation above, including the introduction of any Bills that may be required.
Staff recommendation as filed
Transportation Services recommends that Toronto and East York Community Council: 1. Authorize the General Manager of Transportation Services to temporarily close Cumberland Street between Old York Lane and Bellair Street from Friday June 21, 2019 to Monday July 1, 2019 and Hazelton Avenue between Yorkville Avenue and Scollard Street, from Monday June 24, 2019 to Sunday June 30, 2019 to facilitate the TD Toronto Jazz Festival street event and to amend the necessary traffic regulations; and 2. Authorize and direct the appropriate City Officials to take the necessary action to give effect thereto, including the introduction of any Bills that may be required.
TE5.76adopted
Removal of Taxi Stand - Portland Street
Toronto and East York Community Council, at its meeting of October 17, 2017 adopted Item TE27.56 entitled, "Installation/Removal of On-Street Parking Restrictions - Various Streets in Wards 20 and 28" and in so doing authorized taxi stands on Portland Street, Brant Street, Wellington Street, and Widmer Street. This was to accommodate additional taxi stand spaces in the vicinity of the King Street Transit Pilot. Based on field observations and in consultation with the Toronto Police Service and the Councillor's Office, Transportation Services recommends that the taxi stand that was introduced on Portland Street be removed. This staff report concerns a matter for which the Community Council has delegated authority from City Council to make a final decision, provided that it is not amended so that it varies with City policy or by-laws.
The Toronto and East York Community Council: 1. Rescinded the existing taxi stand for four taxis operating at all times on the east side of Portland Street, between a point 15 metres north of King Street West and a point 24 metres further north. 2. Rescinded the existing No Standing prohibition in effect at all times on the east side of Portland Street, between a point 15 metres north of King Street West and a point 24 metres further north.
Staff recommendation as filed
The Director, Transportation Project Design and Management recommends that: 1. Toronto and East York Community Council rescind the existing taxi stand for four taxis operating at all times on the east side of Portland Street, between a point 15 metres north of King Street West and a point 24 metres further north. 2. Toronto and East York Community Council rescind the existing No Standing prohibition in effect at all times on the east side of Portland Street, between a point 15 metres north of King Street West and a point 24 metres further north.
TE5.77adopted
Appointment of Public Members to the William H. (Bill) Bolton Arena Board
At its meeting on December 4, 5, and 13, 2018, City Council amended the Public Appointments process by authorizing the City Clerk to shortlist, interview and recommend candidates to Community Councils for appointment to the Bill Bolton Arena Board.
The Toronto and East York Community Council: 1. Appointed the following candidates to the William H. (Bill) Bolton Arena Board, at pleasure of Council, for a term of office ending on April 24, 2023, and until successors are appointed: Sharon Bider Richard Bornet Jan Hughes James Lam Caralyn Quan 2. Directed the confidential information contained in Confidential Attachment 1 to the report (April 24, 2019) from the City Clerk remain confidential in its entirety as it relates to personal matters about identifiable individuals being considered for appointment to the William H. (Bill) Bolton Board.
Staff recommendation as filed
The City Clerk recommends that: 1. Toronto and East York Community Council appoint the following candidates to the William H. (Bill) Bolton Arena Board, at pleasure of Council, for a term of office ending on April 24, 2023, and until successors are appointed: Sharon Bider Richard Bornet Jan Hughes James Lam Caralyn Quan 2. Toronto and East York Community Council direct that the confidential information contained in Confidential Attachment 1 remain confidential in its entirety as it relates to personal matters about identifiable individuals being considered for appointment to the William H. (Bill) Bolton Board.
TE5.78adopted
Appointment of Stakeholder Member to the Moss Park Arena Board
At its meeting on December 4, 5, and 13, 2018, City Council amended the Public Appointments process by authorizing the City Clerk to shortlist, interview and recommend candidates to Community Councils for appointment to the Moss Park Arena Board.
The Toronto and East York Community Council: 1. Appointed Chris Poirier as the Central Toronto Skating Club representative to the Moss Park Arena Board, at pleasure of Council, for a term of office ending on April 23, 2023, and until a successor is appointed. 2. Directed Confidential Attachment 1 to the report (April 24, 2019) from the City Clerk remain confidential in their entirety as they relate to personal matters about identifiable individuals being considered for appointment to the Moss Park Arena Board.
Staff recommendation as filed
The City Clerk recommends that: 1. Toronto and East York Community Council appoint Chris Poirier as the Central Toronto Skating Club representative to the Moss Park Arena Board, at pleasure of Council, for a term of office ending on April 23, 2023, and until a successor is appointed. 2. Toronto and East York Community Council direct that Confidential Attachment 1 to the report (April 4, 2019) from the City Clerk remain confidential in their entirety as they relate to personal matters about identifiable individuals being considered for appointment to the Moss Park Arena Board.
TE5.79adopted
Downtown Yonge BIA 2019 Parklets Program
The Downtown Yonge Business Improvement Area (DYBIA) is proposing a parklet and greening project within the limits of existing street parking spaces along the south side of Elm Street, between Yonge Street and Bay, beginning in May 2019. Parklets are sidewalk extensions that provide space and amenities for residents and visitors to stop, sit, and rest while taking in the activities of the street. This particular installation was piloted for the last two years, and enhanced the general pedestrian and retail experience on Elm Street. Over the years, t- Downtowhe project has been supported by local businesses, Toronto Parking Authority, and has been well-received by the community. All costs and insurance requirements associated with the parklets are to be borne by the DYBIA and its agents.
The Toronto and East York Community Council: 1. Approved an exemption from Municipal Code Chapter 743, Streets and Sidewalks to permit within the Downtown Yonge Business Improvement Area, parklets in the eastbound, south curb lane of Elm Street, within existing street parking spaces in front of 15 and 17 Elm Street, between the dates of May 1, 2019 and October 31, 2019 including set-up and take-down. 2. Directed the General Manager, Transportation Services to issue a street occupation permit from May 1, 2019 to October 31, 2019 in the eastbound south curb lane of Elm Street in front of 15 and 17 Elm Street to facilitate the implementation of parklets and a complimentary greening strategy subject to terms and conditions to the satisfaction of the General Manager, Transportation Services. 3. Directed the General Manager, Transportation Services to collaborate with the Downtown Yonge Business Improvement Area on the design of the parklets for the south curb lane of Elm Street in front of 15 and 17 Elm Street to support new designs to the satisfaction of the General Manager, Transportation Services
Staff recommendation as filed
That the Toronto and East York Community Council: 1. Approve an exemption from Municipal Code Chapter 743, Streets and Sidewalks to permit within the Downtown Yonge Business Improvement Area, parklets in the eastbound, south curb lane of Elm Street, within existing street parking spaces in front of 15 and 17 Elm Street, between the dates of May 1, 2019 and October 31, 2019 including set-up and take-down. 2. Direct the General Manager, Transportation Services to issue a street occupation permit from May 1, 2019 to October 31, 2019 in the eastbound south curb lane of Elm Street in front of 15 and 17 Elm Street to facilitate the implementation of parklets and a complimentary greening strategy subject to terms and conditions to the satisfaction of the General Manager, Transportation Services. 3. Direct the General Manager, Transportation Services to collaborate with the DYBIA on the design of the parklets for the south curb lane of Elm Street in front of 15 and 17 Elm Street to support new designs to the satisfaction of the General Manager, Transportation Services
TE5.80adopted
Waiving Fee for Hello Seaton Street Event
Residents in Cabbagetown South have come together to organize Hello Seaton Street - a street event to encourage neighbours to get to know one another, promote a sense of inclusivity and sharing among the community. It is a significant step towards making Seaton Street more safe and inviting. Residents hope that this event will contribute to a more positive perception of their neighbourhood. The community has expressed a lack of social cohesion and bonds, as there are limited opportunities for neighbours to come together locally and there have been challenges with litter and hazardous waste improperly disposed. These and other issues have made the street feel unsafe. Neighbours have expressed that these challenges have made it uncomfortable for them to idle outdoors talking to one another or spend time in their front yards. Residents have initiated this street event in the hopes of starting longer-term, positive change. Hello Seaton Street is a local, volunteer-organized street event that will be open to all, with no fee to participate. Toronto and East York Community Council is being asked to waive the user fees for street events, as a means to support this important local community event. As the local Councillor, I can personally attest to the residents' commitment to promoting active citizenship, greater civic engagement for all and the strengthening of community bonds.
The Toronto and East York Community Council recommends that: 1. City Council direct the General Manager, Transportation Services to waive the permit fee charged for the 2019 Hello Seaton Street event (fee ref. no. 61.09, Toronto Municipal Code Chapter 441, Fees and Charges, Appendix C - Schedule 2, Transportation Services).
Staff recommendation as filed
Councillor Wong Tam recommend that Toronto and East York Community Council recommend: 1. City Council direct the General Manager, Transportation Services to waive the permit fee charged for the 2019 Hello Seaton Street event (fee ref. no. 61.09, Toronto Municipal Code Chapter 441, Fees and Charges, Appendix C - Schedule 2, Transportation Services).
TE5.81adopted
Follow-up to the Avenue Road Corridor Safety Review
The Avenue Road corridor between St. Clair Avenue West and Bloor Street West has been identified by residents as one of concern for pedestrian safety, which led to the 2017 Corridor Safety Review (TE27.48) by Transportation Services. Staff recommendations from the report led to some changes, including a pilot project at the existing School Safety Zone near Brown Junior Public School, but concerns over pedestrian safety remained. This led a number of community organizations and stakeholders to come together and create the 'Avenue Road Safety Coalition' with the aim of improving pedestrian safety along the corridor. The Coalition has reached out to our offices and we have been working together toward addressing many of the issues identified with Transportation staff. Please see the attached recommendations for your consideration.
The Toronto and East York Community Council directed: 1. Transportation Services to conduct a comprehensive intersection safety review at all intersections along the Avenue Road corridor between St. Clair Avenue West and Bloor Street West, with specific focus on Avenue Road and St. Clair Avenue West, Avenue Road and Dupont Street, and Avenue Road and Davenport Road, including but not limited to: a. Reviewing all intersections for leading pedestrian interval (LPI) installation; b. Investigating the feasibility of restricting right-turn movements on red traffic signals at the intersections of Avenue Road and Davenport Road, and Avenue Road and St. Clair Avenue West; c. Compiling and publishing all available collision and near-miss data on Avenue Road from St. Clair Avenue West to Bloor Street West, including those two intersections; and d. Report back to the Toronto and East York Community Council with findings and recommendations by the third quarter of 2019. 2. Request Transportation Services conduct a speed limit review across the Avenue Road corridor between St. Clair Avenue West and Bloor Street West, and report back to Toronto and East York Community Council by the third quarter of 2019.
Staff recommendation as filed
Councillor Josh Matlow, Ward 12 Toronto-St. Paul's, and Councillor Mike Layton, Ward 11 University-Rosedale recommend: 1. Toronto and East York Community Council request Transportation Services conduct a comprehensive intersection safety review at all intersections along the Avenue Road corridor between St. Clair Avenue West and Bloor Street West, with specific focus on Avenue Road and St. Clair Avenue West, Avenue Road and Dupont Street, and Avenue Road and Davenport Road, including but not limited to: a. Reviewing all intersections for leading pedestrian interval (LPI) installation; b. Investigating the feasibility of restricting right-turn movements on red traffic signals at the intersections of Avenue Road and Davenport Road, and Avenue Road and St. Clair Avenue West; c. Compiling and publishing all available collision and near-miss data on Avenue Road from St. Clair Avenue West to Bloor Street West, including those two intersections; d. Report back to Toronto and East York Community Council with findings and recommendations by Q3 2019. 2. Request Transportation Services conduct a speed limit review across the Avenue Road corridor between St. Clair Avenue West and Bloor Street West, and report back to Toronto and East York Community Council by Q3 2019.
TE5.82adopted
Realignment of Permit Parking Area "5E" to exclude 33 Yorkville Avenue
The exclusion of the development located at 33 Yorkville Avenue from the 5E permit parking area is a means to ensure that current permit holders have sufficient parking space. The issuance of parking permits to residents of these developments would negatively impact on the already limited supply of parking spaces. Councillor Layton is requesting approval from Toronto and East York Community Council to prohibit the General Manager from accepting applications from residents of, visitors to, and tradespersons at the subject development property. Residents have reported that it is difficult to find a parking space close to home. The area cannot absorb the potential influx from another development.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services, to review and report back to Toronto and East York Community Council on the realignment of Permit Parking Area "5E" to exclude the development located at 33 Yorkville Avenue.
Staff recommendation as filed
Councillor Mike Layton recommends that: 1. Toronto and East York Community Council requests the General Manager, Transportation Services, to review and report back to Toronto and East York Community Council on the realignment of Permit Parking Area "5E" to exclude the development located at 33 Yorkville Avenue.
TE5.83adopted
Broadview and Danforth Intersection Safety Review
The intersection of Broadview and Danforth is a busy intersection used by pedestrians, cyclists, cars and TTC streetcars daily. Immediately north of the intersection is Broadview Subway Station and to the west is the Bloor Viaduct. The intersection is busy with pedestrian and vehicular traffic throughout the day. Residents have expressed concerns about the safety of this intersection, particularly during the afternoon rush hour period, when eastbound traffic becomes backed up across the viaduct as drivers try to turn left to go north on Broadview Avenue.
The Toronto and East York Community Council: 1. Requested Transportation staff study eastbound, left-turning traffic at the intersection of Broadview Avenue and Danforth Avenue and report back with their findings to Toronto and East York Community Council at their meeting on September 16, 2019. 2. Requested Transportation staff to include collision data for the intersection of Broadview Avenue and Danforth Avenue from Toronto Police Services in their report to the September 16, 2019 meeting of the Toronto and East York Community Council.
Staff recommendation as filed
Councillor Paula Fletcher, Ward 14 Toronto-Danforth recommends that: 1. Toronto and East York Community Council request Transportation staff study eastbound, left-turning traffic at the intersection of Broadview and Danforth and report back with their findings to Toronto and East York Community Council at their meeting on September 16, 2019. 2. Toronto and East York Community Council request that Transportation staff include collision data for the intersection of Broadview and Danforth from Toronto Police Services in their report to Toronto and East York Community Council on September 16, 2019.
TE5.84adopted
Traffic Calming on Milverton Boulevard
Milverton Boulevard is a two-way residential street north of Danforth Avenue. Residents along Milverton Boulevard are concerned about vehicles speeding along their street and they have submitted a petition in favour of installing traffic calming on Milverton Boulevard between Greenwood Avenue and Linsmore Crescent. I will also be circulating a ballot to the residents along this section of Milverton Boulevard to gauge their support for speed hump installation.
The Toronto and East York Community Council: 1. Requested Transportation staff to conduct a study for the installation of speed humps on Milverton Boulevard between Greenwood Avenue and Linsmore Crescent and report back with their findings to Toronto and East York Community Council at its meeting on September 16, 2019.
Staff recommendation as filed
Councillor Paula Fletcher, Ward 14 Toronto-Danforth recommends that: 1. The Toronto and East York Community Council request Transportation staff to conduct a study for the installation of speed humps on Milverton Boulevard between Greenwood Avenue and Linsmore Crescent and report back with their findings to Toronto and East York Community Council at its meeting on September 16, 2019.
TE5.85amended
Villiers Street Pay and Display
Villiers Street, in the Portlands, is an important site for jobs and employment in the East End. However due to a lack of parking regulations there is an issue with long-term parking and storage of vehicles. Implementing pay-and-display on Villiers will ensure that businesses have spots and cut down on long-term parking. I am asking you to support this request.
The Toronto and East York Community Council directed: 1. Transportation Services to bring forward a report and accompanying by-laws implementing pay-and-display parking on Villiers Street between Don Roadway and Cherry Street.
Staff recommendation as filed
Councillor Fletcher recommends that: 1. Transportation Services report to the Toronto and East York Community Council meeting on October 10th, 2019 on implementing Pay and Display parking on Villiers Street between Saulter Street South and Cherry Street.
TE5.86adopted
Parking Amendments - Danforth Avenue
Businesses from the Danforth have been in touch with my office requesting help in dealing with a problem of driveways that are consistently blocked. Transportation Services has provided language to install No-Parking signs around the driveways to make it clear and obvious to cars that they cannot park there. This will not impact parking on the Danforth as it will only cover the driveway entrance. In order to move this change forward quickly I am asking that you support the recommendations in my letter, which have been provided by Transportation Services.
The Toronto and East York Community Council recommends that: 1. City Council prohibit parking at all times on the north side of Danforth Avenue, between a point 47.5 metres east Playter Boulevard and a point 3 metres further east. 2. City Council prohibit parking at all time on the north side of Danforth Avenue, between a point 41 metres west of Jackman Avenue and a point 4.5 metres further west.
Staff recommendation as filed
Councillor Fletcher recommends that: 1. City Council prohibit parking at all times on the north side of Danforth Avenue, between a point 47.5 metres east Playter Boulevard and a point 3 metres further east. 2. City Council prohibit parking at all time on the north side of Danforth Avenue, between a point 41 metres west of Jackman Avenue and a point 4.5 metres further west.
TE5.87adopted
Heritage Evaluation of 245 Logan
245 Logan was one of the first Dominion Stores in Canada and is on property that was earlier owned by Samuel Sewell, a patriarch of Leslieville's black community, who escaped slavery in Virginia to found a thriving community of refugees around the corner of Logan and Queen. It is also attached to 889-893 Queen Street East, which were identified as being of potential heritage significance in the Leslieville Urban Design Guidelines. Changes to this property would have potential impacts on the conjoined buildings above and beyond any impacts just on the property.
The Toronto and East York Community Council directed: 1. The Senior Manager, Heritage Preservation Services, Urban Design, City Planning to research and evaluate the properties 245 Logan Avenue according to provincial criteria Regulation 9/06, to gain a better understanding of the cultural heritage value of the property, and to report to the Toronto Preservation Board meeting on June 20, 2019.
Staff recommendation as filed
Councillor Fletcher recommends that: 1. The Toronto and East York Community Council direct the Senior Manager, Heritage Preservation Services, research and evaluate the properties 245 Logan according to provincial criteria Regulation 9/06, to gain a better understanding of the cultural heritage value of the property, and report to the Toronto Preservation Board meeting of June 20th, 2019.
TE5.88adopted
Traffic Calming - St. Clarens Avenue between Dupont Street and Lappin Avenue
On September 6, 2017, Toronto and East York Community Council adopted, as amended, Item TE26.106 entitled "Traffic Calming (Speed Humps) - St. Clarens Avenue" and, in doing so, authorized the installation of traffic calming on St. Clarens Avenue, between Dupont Street and Lappin Avenue, subject to a favorable poll of residents. The speed hump poll on the section of St. Clarens Avenue was conducted in December 2017. Based on the poll results, the minimum response rate of (50% + 1) was not reached; however, of the residents that responded, the majority supported the idea of having speed humps installed on St. Clarens Avenue. Given the negative poll results, speed humps were not installed at the time. Residents continue to contact my office to this day with concerns over speeding on St. Clarens Avenue and are asking that speed humps be installed on their street in order to improve safety. Given the previous poll results (majority resident support), I am requesting to have speed humps installed on St. Clarens Avenue by way of this motion. In early April 2019, I sent a letter to St. Clarens Avenue residents informing them of my intention to proceed with having speed humps installed on their street. To date, feedback has been positive and in support of having speed humps installed on St. Clarens Avenue, between Dupont Street and Lappin Avenue.
The Toronto and East York Community Council: 1. Directed the City Solicitor to prepare a by-law to alter the roadway on St. Clarens Avenue, between Dupont Street and Lappin Avenue, for traffic calming purposes, generally as shown on the attached copy of Drawing No. 421G-2599, dated August 2017.
Staff recommendation as filed
Councillor Bailão recommends that: 1. The Toronto and East York Community Council directs the City Solicitor to prepare a by-law to alter the roadway on St. Clarens Avenue, between Dupont Street and Lappin Avenue, for traffic calming purposes, generally as shown on the attached copy of Drawing No. 421G-2599, dated August 2017.
TE5.89adopted
Intersection Safety at Pape and Danforth
The intersection of Pape and Danforth is a busy intersection used by pedestrians, cyclists, cars and TTC busses daily. Immediately north of the intersection is Pape Subway Station, which recently had a traffic light installed. Residents have expressed concerns about the safety of these two intersections, and in particular the way the two traffic lights operate together. Transportation Services is undertaking a review of the two intersections. I am asking that the review be brought to Community Council to ensure that the community has the opportunity to give feedback.
The Toronto and East York Community Council requested: 1. Transportation Services to report to the September 16, 2019 meeting of the Toronto and East York Community Council with the results of the intersection safety and signal timing/phase review at Pape Avenue and Danforth Avenue, and Pape Avenue and Lipton Avenue.
Staff recommendation as filed
Councillor Fletcher recommends that: 1. The Toronto and East York Community Council request Transportation Services to report to September Toronto and East York Community Council with the results of the intersection safety and signal timing/phase review at Pape and Danforth, and Pape and Lipton.
TE5.90adopted
Introduction and consideration of bills for enactment of By-laws.
General Bill Toronto and East York Community Council enacted By-laws 621-2019 to 671- 2019. Confirmatory Bill Toronto and East York Community Council passed a Confirmatory Bill as By-law 672-2019.