Toronto and East York Community Council
The full agenda, as filed
All 105 items in the clerk’s order. Each carries the city’s own words: the staff recommendation, what the body decided, and its status. Nothing below is written by us.
Items 51 to 75 of 105Show 2550100all
TE32.51adopted
Construction Staging Area Time Extension - 462 Eastern Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. 462 Developments Inc. is building an eight-storey condominium with a total of 286 units at 462 Eastern Ave. The site is located on the north side of Eastern Avenue, between Logan Avenue and Booth Avenue. The north sidewalk and westbound curb lane of Eastern Avenue, from the west side of Logan Avenue to the east side of Booth Ave, are closed to accommodate construction staging operations for the development. In addition, the west sidewalk and a portion of the southbound lane on Logan Avenue is closed, from Eastern Avenue to a point 90 metres north. Toronto and East York Community Council, at its meeting on December 3, 2019, approved the construction staging areas on Eastern Avenue and Logan Avenue from December 2, 2019 to March 31, 2022. The developer has requested an extension of the duration of the construction staging areas on Eastern Avenue and Logan Avenue, in order to complete the construction of the development. Based on the information provided by the developer, the site has experienced a number of construction delays due to COVID-19 and inclement weather. Transportation Services is requesting authorization to extend the duration of the construction staging areas on Eastern Avenue and Logan Avenue until September 1, 2022 in order to complete the construction of the development.
The Toronto and East York Community Council: 1. Authorized the continuation of the closure of the north sidewalk and westbound curb lane of Eastern Avenue, from the west side of Logan Avenue to the east side of Booth Ave, from April 22, 2022 to September 1, 2022. 2. Authorized the continuation of the closure of the west sidewalk and a 3 metre-wide portion of the southbound lane on Logan Avenue from Eastern Avenue to a point 90 metres further north, from April 22, 2022 to September 1, 2022. 3. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. Directed the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. Directed the applicant to continue to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Directed the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. Directed the applicant to continue to establish a Construction Liaison Committee made up of local residents and business owners to the satisfaction of the local Councillor, that the Committee is to meet weekly at the beginning of construction, and that minutes of the meetings are forwarded to the Local Councillor. 9. Directed the applicant to consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. Directed the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Directed that Eastern Avenue and Logan Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the continuation of the closure of the north sidewalk and westbound curb lane of Eastern Avenue, from the west side of Logan Avenue to the east side of Booth Ave, from April 22, 2022 to September 1, 2022. 2. Toronto and East York Community Council authorize the continuation of the closure of the west sidewalk and a 3 metre-wide portion of the southbound lane on Logan Avenue from Eastern Avenue to a point 90 metres further north, from April 22, 2022 to September 1, 2022. 3. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 4. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 5. Toronto and East York Community Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 6. Toronto and East York Community Council direct the applicant to continue to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 7. Toronto and East York Community Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 8. Toronto and East York Community Council direct the applicant to continue to establish a Construction Liaison Committee made up of local residents and business owners to the satisfaction of the local Councillor, that the Committee is to meet weekly at the beginning of construction, and that minutes of the meetings are forwarded to the Local Councillor. 9. Toronto and East York Community Council direct the applicant to consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 10. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 14. Toronto and East York Community Council direct that Eastern Avenue and Logan Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
TE32.52adopted
Port Lands Flood Protection and Enabling Infrastructure - Construction Staging Time Extension
As the Toronto Transit Commission (TTC) operates a transit service on Commissioners Street, City Council approval is required. The TTC service has been rerouted along Villiers Street and Saulter Street South. Waterfront Toronto, City of Toronto, Toronto and Region Conservation Authority (TRCA) and the Toronto Port Lands Company (TPLC) have developed the Port Lands Flood Protection Project (PLFPP) to protect the Lower Don Lands and adjacent areas from potential loss of life and costly flood damage associated with a flood event, while triggering economic development. The solution involves creating two additional outlets for the Don River, which ultimately will be surrounded by new parks, green space and public realm enhancements. Several roads within the Port Lands area will be impacted. City Council, at its meeting on November 26, 2019, authorized a full closure of Commissioners Street, from Cherry Street to 120 metres east of Don Roadway from October 30, 2019 to May 16, 2022; and a full closure of Don Roadway, from Villiers Street to Commissioners Street, from October 30, 2019 to May 16, 2022. Waterfront Toronto has requested an extension of the duration of the road closures on Commissioners Street and Don Roadway, in order to complete the road reconstruction. Based on the information provided by Waterfront Toronto, the site has experienced issues with poor soil conditions and design approvals for utility relocations and enhancements, resulting in construction delays. Transportation Services is requesting authorization to extend the duration of the full closure of Commissioners Street and Don Roadway until May 31, 2023 and August 31, 2024, respectively.
The Toronto and East York Community Council recommends that: 1. City Council authorize the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway, from May 17, 2022 to May 31, 2023. 2. City Council authorize the temporary full closure of Don Roadway to all road users from the south curb line of Villiers Street to the north curb line of Commissioners Street, from May 17, 2022 to August 31, 2024. 3. City Council designate the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only, from May 17, 2022 to May 31, 2023. 4. City Council designate the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, from May 17, 2022 to May 31, 2023. 5. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street, from May 17, 2022 to May 31, 2023. 6. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway, from May 17, 2022 to May 31, 2023. 7. City Council authorize an all way stop control at the intersection of Villiers Street and Saulter Street South, from May 17, 2022 to May 31, 2023. 8. City Council designate the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, from May 17, 2022 to May 17, 2023. 9. City Council designate the southerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound left turns only, from May 17, 2022 to May 31, 2023. 10. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway, from May 17, 2022 to May 31, 2023. 2. City Council authorize the temporary full closure of Don Roadway to all road users from the south curb line of Villiers Street to the north curb line of Commissioners Street, from May 17, 2022 to August 31, 2024. 3. City Council designate the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only, from May 17, 2022 to May 31, 2023. 4. City Council designate the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, from May 17, 2022 to May 31, 2023. 5. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street, from May 17, 2022 to May 31, 2023. 6. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway, from May 17, 2022 to May 31, 2023. 7. City Council authorize an all way stop control at the intersection of Villiers Street and Saulter Street South, from May 17, 2022 to May 31, 2023. 8. City Council designate the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, from May 17, 2022 to May 17, 2023. 9. City Council designate the southerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound left turns only, from May 17, 2022 to May 31, 2023. 10. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed.
TE32.53adopted
Parking Amendments - High Park Avenue
As the Toronto Transit Commission (TTC) operates a transit service on High Park Avenue, City Council approval of this report is required. Transportation Services is recommending that stopping be prohibited on the west side of High Park Avenue, in the vicinity of High Park Subway Station driveway loop. The proposed amendment will deter vehicles from parking/stopping on the west side of High Park Avenue, just south of the High Park Subway Station driveway loop, improving maneuverability and sight lines for TTC buses turning between High Park Avenue and the driveway.
The Toronto and East York Community Council recommends that: 1. City Council amend the existing parking prohibition in effect from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the west side of High Park Avenue between Bloor Street West and Humberside Avenue to be in effect from 7:00 a.m. to 8:00 a.m. daily, between Bloor Street West and a point 59.1 metres further north. 2. City Council prohibit parking from 7:00 a.m. to 8:00 a.m. on the west side of High Park Avenue between a point 81.8 metres north of Bloor Street West and Glenlake Avenue. 3. City Council prohibit parking from 7:00 a.m. to 9:00 a.m. on the west side of High Park Avenue between Glenlake Avenue and Humberside Avenue. 4. City Council prohibit stopping at all times on the west side of High Park Avenue between a point 59.1 metres north of Bloor Street West and a point 22.7 metres further north.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council amend the existing parking prohibition in effect from 7:00 a.m. to 9:00 a.m., Monday to Friday, except public holidays on the west side of High Park Avenue between Bloor Street West and Humberside Avenue to be in effect from 7:00 a.m. to 8:00 a.m. daily, between Bloor Street West and a point 59.1 metres further north. 2. City Council prohibit parking from 7:00 a.m. to 8:00 a.m. on the west side of High Park Avenue between a point 81.8 metres north of Bloor Street West and Glenlake Avenue. 3. City Council prohibit parking from 7:00 a.m. to 9:00 a.m. on the west side of High Park Avenue between Glenlake Avenue and Humberside Avenue. 4. City Council prohibit stopping at all times on the west side of High Park Avenue between a point 59.1 metres north of Bloor Street West and a point 22.7 metres further north.
TE32.54adopted
Parking Amendments - Woodfield Road
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that the existing parking prohibition, from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the west side of Woodfield Road, north of Queen Street East, be rescinded. The proposed amendment will add about nine parking spaces on the west side of Woodfield Road, north of Queen Street East. During the course of the investigation, it was noted that there is a discrepancy between the posted signs and the existing parking regulations. Recommendation 2 will correct this inconsistency.
The Toronto and East York Community Council: 1. Rescinded the existing parking prohibition if effect, from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the west side of Woodfield Road, from Queen Street East and a point 64 metres north. 2. Amended the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., except no parking from 8:00 a.m. to 6:00 p.m. on the even (west) side of Woodfield Road, from Queen Street East to Dundas Street East, to be in effect from 12:01 a.m. to 7:00 a.m., daily.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing parking prohibition if effect, from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the west side of Woodfield Road, from Queen Street East and a point 64 metres north. 2. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., except no parking from 8:00 a.m. to 6:00 p.m. on the even (west) side of Woodfield Road, from Queen Street East to Dundas Street East, to be in effect from 12:01 a.m. to 7:00 a.m., daily.
TE32.55adopted
Parking Amendments - Munro Street, Matilda Street and Sammon Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. The purpose of this report is to resolve by-law amendments missed in Item TE11.35 "Residential On-street Permit Parking - Status Update on the Expansion of On-Street Permit Parking in the Toronto and East York Community Council Area". Transportation Services is recommending that overnight on-street permit parking be introduced on Munro Street, between Dundas Street East and Matilda Avenue/Kintyre Avenue from 12:01 a.m. to 7:00 a.m., daily and to move permit parking on Sammon Avenue, from the odd to even side of the street. These proposed by-law amendments will ensure that the intent of Item TE11.35, as adopted with amendments by City Council on January 29, 2020 can be properly installed and enforced.
The Toronto and East York Community Council: 1. Authorized parking by permit only on an area name basis, within permit parking area 7F, from 12:01 a.m. to 7:00 a.m. daily on odd side of Munro Street, between Dundas Street East and Thompson Street. 2. Authorized parking by permit only on an area name basis, within permit parking area 7F, from 12:01 a.m. to 7:00 a.m. daily on odd side of Matilda Street, between Munro Street and Davies Avenue. 3. Amended the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily on the odd side of Sammon Avenue, between Pape Avenue to Woodycrest Avenue, to be in effect from 12:01 a.m. to 7:00 a.m., daily on the even side of Sammon Avenue, from Pape Avenue to Woodycrest Avenue. 4. Prohibited parking at all times on the south side of Sammon Avenue, between Pape Avenue and Woodycrest Avenue. 5. Rescinded the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily on the odd side of Sammon Avenue, between Woodycrest Avenue and Dewhurst Boulevard North. 6. Prohibited parking at all times on the south side of Sammon Avenue, between Woodycrest Avenue and Dewhurst Boulevard North.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council authorize parking by permit only on an area name basis, within permit parking area 7F, from 12:01 a.m. to 7:00 a.m. daily on odd side of Munro Street, between Dundas Street East and Thompson Street. 2. Toronto and East York Community Council authorize parking by permit only on an area name basis, within permit parking area 7F, from 12:01 a.m. to 7:00 a.m. daily on odd side of Matilda Street, between Munro Street and Davies Avenue. 3. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily on the odd side of Sammon Avenue, between Pape Avenue to Woodycrest Avenue, to be in effect from 12:01 a.m. to 7:00 a.m., daily on the even side of Sammon Avenue, from Pape Avenue to Woodycrest Avenue. 4. Toronto and East York Community Council prohibit parking at all times on the south side of Sammon Avenue, between Pape Avenue and Woodycrest Avenue. 5. Toronto and East York Community Council rescind the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m., daily on the odd side of Sammon Avenue, between Woodycrest Avenue and Dewhurst Boulevard North. 6. Toronto and East York Community Council prohibit parking at all times on the south side of Sammon Avenue, between Woodycrest Avenue and Dewhurst Boulevard North.
TE32.56adopted
Accessible Parking Spaces - April 2022 (Delegated)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation/removal of on-street accessible parking spaces for persons with disabilities.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1, attached to the report (April 1, 2022) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1, attached to the report entitled "Accessible Parking Spaces-April 2022 (Delegated), dated April 1, 2022 from the Director, Traffic Management, Transportation Services.
TE32.57adopted
Accessible Parking Space - Lansdowne Avenue (Non-Delegated)
As the Toronto Transit Commission (TTC) operates a transit service on Lansdowne Avenue, City Council approval of this report is required. Transportation Services is requesting approval for the installation of an on-street accessible parking space on the west side of Lansdowne Avenue. During the course of the investigation, it was noted that there is a discrepancy between posted signs and the by-law. Recommendation 2 will correct the inconsistency.
The Toronto and East York Community Council recommends that: 1. City Council designate an on-street accessible parking space on the west side of Lansdowne Avenue, between a point 180.7 metres north of Whytock Avenue and a point 5.5 metres further north. 2. City Council amend the existing maximum one-hour parking regulation in effect on both sides of Lansdowne Avenue, between College Street and Whytock Avenue to be in effect on the west side.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council designate an on-street accessible parking space on the west side of Lansdowne Avenue, between a point 180.7 metres north of Whytock Avenue and a point 5.5 metres further north. 2. City Council amend the existing maximum one-hour parking regulation in effect on both sides of Lansdowne Avenue, between College Street and Whytock Avenue to be in effect on the west side.
TE32.58adopted
Encroachment Agreement - 60 Mill Street
This staff report is about a matter for which Community Council has delegated authority from City Council to make a final decision. Transportation Services has reviewed an application to construct an encroachment within the public right-of-way at 60 Mill Street. The encroachment consists of a private sanitary control manhole which is in contravention of City of Toronto Municipal Code Chapter 743, Streets and Sidewalks, Use Of. The purpose of this report is to request authority to enter into an encroachment agreement with the property owner to permit the construction of the private maintenance manhole within the City's right-of-way on Trinity Street, subject to conditions.
The Toronto and East York Community Council: 1. Authorized the City to enter into an encroachment agreement (the "Agreement") with property owner of 60 Mill Street permitting a private sanitary control manhole (the "Encroachment") on the terms and conditions to be set out by the Director, Permits and Enforcement, Transportation Services and on any other or amended terms and conditions satisfactory to the General Manager, Transportation Services (the "GM"), and in a form satisfactory to the City Solicitor.
Staff recommendation as filed
The Director Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the City to enter into an encroachment agreement (the "Agreement") with property owner of 60 Mill Street permitting a private sanitary control manhole (the "Encroachment") on the terms and conditions to be set out by the Director, Permits and Enforcement, Transportation Services and on any other or amended terms and conditions satisfactory to the General Manager of Transportation Services (the "GM"), and in a form satisfactory to the City Solicitor.
TE32.59adopted
All-Way Stop Control - Duncan Street and Nelson Street
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to install all-way stop control at the intersection of Duncan Street and Nelson Street. Based on the assessment undertaken, the installation of all-way stop control is recommended and should enhance safety for all road users.
The Toronto and East York Community Council: 1. Authorized all-way compulsory stop control at the intersection of Duncan Street and Nelson Street.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize all-way compulsory stop control at the intersection of Duncan Street and Nelson Street.
TE32.60adopted
Realignment of Permit Parking Area 2 to Exclude the Development Located at 72 Perth Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. The purpose of this report is to respond to Toronto and East York Community Council's direction to review and report back on the realignment of Permit Parking Area 2 to exclude the development located at 72 Perth Avenue. Staff have determined the realignment of the Permit Parking Area 2 is feasible and has no objections to excluding the development located at 72 Perth Avenue. If Toronto and East York Community Council excludes this address from the subject Permit Parking Area, residents and visitors of this address will be prohibited from participating in the on-street permit parking program.
The Toronto and East York Community Council: 1. Approved the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "2", as shown in Attachment 1 of the report (April 1, 2022) from the Director, Permits and Enforcement, Transportation Services.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. Toronto and East York Community Council approve the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "2", as shown in Attachment 1 of the report dated April 1, 2022 from the Director, Permits and Enforcement, Transportation Services.
TE32.61amended
Traffic Calming (Speed Humps) - Elmsdale Road
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has reviewed the need for traffic calming (speed humps) on Elmsdale Road, between Donlands Avenue and O'Connor Drive. The assessment indicates the warrant criteria as set out in the City of Toronto's Traffic Calming Policy has not been satisfied. Therefore, staff do not recommend the installation of speed humps on Elmsdale Road.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Elmsdale Road. 2. Authorized the installation of traffic calming (speed humps) on Elmsdale Road, between Donlands Avenue and O'Connor Drive. 3. Directed the City Solicitor to prepare a by-law to alter sections of the roadway to install two speed humps on Elmsdale Road, between Donlands Avenue and O'Connor Drive, for traffic calming purposes, generally as shown on Attachment 2, dated March 2022, attached to the report (April 1, 2022) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming (speed humps) on Elmsdale Road, between Donlands Avenue and O'Connor Drive.
TE32.62amended
Traffic Calming (Speed Humps) - Milverton Boulevard
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has reviewed the need for traffic calming (speed humps) on Milverton Boulevard, between Greenwood Avenue and Caithness Avenue. The assessment indicates the warrant criteria as set out in the City of Toronto's Traffic Calming Policy has not been satisfied. Therefore, staff do not recommend the installation of speed humps on Milverton Boulevard.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Milverton Boulevard. 2. Authorized the installation of traffic calming (speed humps) on Milverton Boulevard, between Greenwood Avenue and Caithness Avenue. b. Directed the City Solicitor to prepare a by-law to alter sections of the roadway to install three speed humps on Milverton Boulevard, between Greenwood Avenue and Caithness Avenue, for traffic calming purposes, generally as shown on Attachment 2, dated 18 January 2022, attached to the report (April 1, 2022) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council not authorize the installation of traffic calming (speed humps) on Milverton Boulevard, between Greenwood Avenue and Caithness Avenue.
TE32.63adopted
Appointments to the Board of Management of the Applegrove Community Complex
The Board further confirms that each of these nominees is qualified to serve under the provisions of the City of Toronto's Public Appointments Policy and the Relationship Framework for Community Centre Boards of Management. On behalf of the Board, I respectfully request that the City take the necessary steps to appoint these nominated candidates. The following public member's terms are coming to an end: • Timothy McNab, term ending March 31, 2022, and until a successor is appointed. • Jean Lim-O'Brien, resigned effective March 31, 2022.
The Toronto and East York Community Council: 1. Appointed the following candidates for appointment to the Board of Management of the Applegrove Community Complex, at pleasure of Council, for the terms of office noted below and until successors are appointed: Eadit Rokach, for a term of office ending March 31, 2024 Jim Valentine, for a term of office ending March 31, 2024 Moneca Yardley, for a term of office ending March 31, 2024 Shirin Karim, for a term of office ending March 31, 2024 Vai Teng Law, for a term of office ending March 31, 2023
Staff recommendation as filed
The Applegrove Community Complex Board of Management recommends that the Toronto and East York Community Council: 1. Appoint the following candidates for appointment to the Board, at pleasure of Council, for the terms of office noted below and until successors are appointed: Eadit Rokach, for a term of office ending March 31, 2024 Jim Valentine, for a term of office ending March 31, 2024 Moneca Yardley, for a term of office ending March 31, 2024 Shirin Karim, for a term of office ending March 31, 2024 Vai Teng Law, for a term of office ending March 31, 2023
TE32.64amended
Endorsement of Events for Liquor Licensing Purposes
The City Clerk's Office has received two requests for municipal endorsement for temporary liquor licence extensions that do not meet the criteria of the delegated authority.
The Toronto and East York Community Council recommends that: 1. City Council endorse the applications listed below for extensions to licensed areas as set out in Attachment 1 and direct the City Clerk to issue a letter of municipal significance and non-objection to the Alcohol and Gaming Commission of Ontario: - Big on Bloor - Taste of Little Italy.
Staff recommendation as filed
The City Clerk recommends that: 1. Community Council decide whether to consider the following is an "event of municipal significance" under Chapter 27-18.4, Delegation to Community Councils: - Big on Bloor - Taste of Little Italy 2. City Council decide whether to endorse applications for extensions to licensed hours or areas for the establishments listed in Attachment 1 and direct the City Clerk to issue letters of municipal significance and non-objection to the Alcohol and Gaming Commission of Ontario.
TE32.65adopted
Parking Amendments in front of 17 High Park Avenue - Early Learning Centre
Users of the Early Learning Centre at 17 High Park Avenue expressed concerns about vehicles that remain in the pick-up / drop-off spot in the mornings. Transportation staff have provided the below recommendations.
The Toronto and East York Community Council recommends that: 1. City Council amend the existing maximum 15 minute parking regulation in effect from 7:00 a.m. to 6:00 p.m., Monday to Friday on the east side of High Park Avenue from a point 51 metres north of Bloor Street West and a point 21 metres further north to be in effect from 7:15 a.m. to 6:00 p.m., Monday to Friday. 2. City Council prohibit parking from 7:00 a.m. to 7:15 a.m., Monday to Friday on the east side of High Park Avenue from a point 51 metres north of Bloor Street West and a point 21 metres further north.
Staff recommendation as filed
Councillor Perks recommends that: 1. City Council amend the existing maximum 15 minute parking regulation in effect from 7:00 a.m. to 6:00 p.m., Mon-Fri. on the east side of High Park Avenue from a point 51 metres north of Bloor Street West and a point 21 metres further north to be in effect from 7:15 a.m. to 6:00 p.m., Mon-Fri 2. City Council prohibit parking from 7:00 a.m. to 7:15 a.m., Mon-Fri on the east side of High Park Avenue from a point 51 metres north of Bloor Street West and a point 21 metres further north.
TE32.66adopted
All-Way Stop at St. Mark’s Road and Humbercrest Boulevard
Stop signs currently exist for north and south bound motorists navigating through the intersection. The St. Mark's Road and Humbercrest Boulevard intersection was reviewed by Transportation Engineers in 2013 and 2019. In consultation with Transportation Services, Transportation Services recommend an All-Way Stop control at St. Mark's Road and Humbercrest Blvd. Councillor Perks supports the below recommendations from Transportation Services:
The Toronto and East York Community Council: 1. Authorized all-way stop control at the intersection of St. Mark's Road and Humbercrest Boulevard. 2. Subject to approval of and in conjunction with the installation of the all-way stop control at St. Mark's Road and Humbercrest Boulevard, Toronto and East York Community Council authorized removal of the existing pedestrian crossover on St. Mark's Road immediately east of Humbercrest Boulevard.
Staff recommendation as filed
Councillor Perks recommends that: 1. Toronto and East York Community Council authorize all-way stop control at the intersection of St. Mark's Road and Humbercrest Boulevard. 2. Subject to approval of and in conjunction with the installation of the all-way stop control at St. Mark's Road and Humbercrest Boulevard, Toronto and East York Community Council authorize removal of the existing pedestrian crossover on St. Mark's Road immediately east of Humbercrest Boulevard.
TE32.67adopted
Bollard Installation - 10 Earlscourt Avenue
Over the past year, I have heard from residents across Ward 9 (Davenport) requesting bollard installations and replacements on account of safety concerns. Bollards act as both a physical and visual barrier, protecting people and property from damage without impeding the public right of way. In the case of 10 Earlscourt Avenue, the homeowner is concerned about property damage as vehicles enter the laneway. Commonly used applications such as signage and traditional police enforcement have been ineffective and do not provide enough of a deterrent against potential vehicle impact. As a result, I am recommending the installation of rigid, impact resistant, fixed-in-place bollards at the following locations to protect property and enhance community safety.
The Toronto and East York Community Council: 1. Directed the General Manager, Transportation Services, install bollards in the first east/west public lane on the west side of Earlscourt Avenue, north of St. Clair Avenue West along the flankage of 10 Earlscourt Avenue.
Staff recommendation as filed
Councillor Bailão recommends that: 1. Toronto and East York Community Council direct the General Manager, Transportation Services, install bollards in the first east/west public lane on the west side of Earlscourt Avenue, north of St. Clair Avenue West along the flankage of 10 Earlscourt Avenue.
TE32.68adopted
Speed Hump Installation on Ford Street
In January 2021, residents reached out to my office with an urgent concern about speeding along their street and requested via an online survey that traffic calming measures (speed humps) be installed as a method of addressing these concerns. Unanimously, the residents that responded were in support of making this change. I am requesting that speed humps be installed on Ford Street from Davenport Road to St. Clair Avenue West.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorized the installation of traffic calming (speed humps) on Ford Street, between Davenport Road and St. Clair Avenue West. 2. Directed the City Solicitor to prepare a by-law to alter sections of the roadway on Ford Street, between Davenport Road and St. Clair Avenue West, to install three speed humps, generally as shown on the copy of 'Drawing No. 421G-4004' dated April 2022 from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Bailão recommends that the Toronto and East York Community Council: 1. Waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Ford Street, between Davenport Road and St. Clair Avenue West. 2. Direct the City Solicitor to prepare a by-law to alter sections of the roadway on Ford Street, between Davenport Road and St. Clair Avenue West, to install three speed humps, generally as shown on the copy of 'Drawing No. 421G-4004' dated April 2022 from the Director, Traffic Management, Transportation Services.
TE32.69adopted
Speed Hump Installation on Gordon Street
In May 2021, residents reached out to my office with an urgent concern about speeding along their street and requested via an online survey that traffic calming measures (speed humps) be installed as a method of addressing these concerns. Of the residents that responded, 89% were in support of making this change. I am requesting that speed humps be installed on Gordon Street from Sheridan Avenue to Dufferin Street.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Gordon Street, between Sheridan Avenue and Dufferin Street. 2. Directed the City Solicitor to prepare a by-law to alter sections of the roadway on Gordon Street, between Sheridan Avenue and Dufferin Street, to install two speed humps, generally as shown on the copy of 'Drawing No. 421G-4003' dated April 2022 from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Bailão recommends that the Toronto and East York Community Council: 1. Waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Gordon Street, between Sheridan Avenue and Dufferin Street. 2. Direct the City Solicitor to prepare a by-law to alter sections of the roadway on Gordon Street, between Sheridan Avenue and Dufferin Street, to install two speed humps, generally as shown on the copy of 'Drawing No. 421G-4003' dated April 2022 from the Director, Traffic Management, Transportation Services.
TE32.70adopted
Speed Hump Installation on Sheridan Avenue
In January 2021, residents reached out to my office with an urgent concern about speeding along their street and requested via an online survey that traffic calming measures (speed humps) be installed as a method of addressing these concerns. Of those that responded, 91% were in support of making this change. I am requesting that speed humps be installed on Sheridan Avenue from College Street to Dundas Street.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Sheridan Avenue, between College Street and Dundas Street West. 2. Directed the City Solicitor to prepare a by-law to alter sections of the roadway on Sheridan Avenue, between College Street and Dundas Street West, to install three speed humps, generally as shown on the copy of 'Drawing No. 421G-4005' dated April 2022 from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Bailão recommends that the Toronto and East York Community Council: 1. Waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Sheridan Avenue, between College Street and Dundas Street West. 2. Direct the City Solicitor to prepare a by-law to alter sections of the roadway on Sheridan Avenue, between College Street and Dundas Street West, to install three speed humps, generally as shown on the copy of 'Drawing No. 421G-4005' dated April 2022 from the Director, Traffic Management, Transportation Services.
TE32.71adopted
Speed Bump Installation on Public Lane South of Wallace Avenue and West of Brock Avenue
At the February 2022 meeting of Toronto East York Community Council authorized the installation of speed bumps in Cosmos Nature Lane, bounded by Bloor Street West, Margueretta Street, Wallace Avenue and Brock Avenue (TE31.96). To further deter speeding in the laneway and enhance safety, I am requesting that a speed bump be installed at the entry of the laneway, which operates east-west, located south of Wallace Avenue and west of Brock Avenue.
The Toronto and East York Community Council: 1. Authorized the installation of a speed bump in Cosmos Nature Lane (east-west section), south of Wallace Avenue, west of Brock Avenue, as shown on 'Drawing 421G-4002', dated April 2022, from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Bailão recommends that: 1. Toronto and East York Community Council authorize the installation of a speed bump in Cosmos Nature Lane (east-west section), south of Wallace Avenue, west of Brock Avenue, as shown on 'Drawing 421G-4002', dated April 2022, from the Director, Traffic Management, Transportation Services.
TE32.72adopted
I am writing to respectfully request that the development at 2112-2114 Yonge Street be excluded from the permit parking program, specifically from neighbouring Hillsdale Avenue West. This exclusion would ensure that current permit holders have sufficient parking space, as the issuance of parking permits following this development would negatively impact the already limited supply of parking spaces on Hillsdale Avenue West. Moreover, this action would prohibit the General Manager, Transportation Services, from accepting applications from residents of, visitors to, and tradespersons at the subject development property. Residents have reported to my office that it is difficult to find a parking space close to home. As such, my office has worked closely with the Oriole Park Association (OPA), the South Eglinton Davisville Residents' Association (SEDRA) and City staff in coming up with this recommendation.
The Toronto and East York Community Council: 1. Requested the General Manager, Transportation Services, amend Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to exclude the development located at 2112-2114 Yonge Street from permit parking on Hillsdale Avenue West.
Staff recommendation as filed
Councillor Matlow recommends that the Toronto and East York Community Council: 1. Request the General Manager, Transportation Services, amend Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to exclude the development located at 2112-2114 Yonge Street from permit parking on Hillsdale Avenue West.
TE32.73adopted
Chester Hill Road and Lookout - Update
Chester Hill Road is a residential street in East York which dead ends to the west at the Chester Hill Lookout. In 2019, I held a site visit with City staff and residents and moved a motion to address safety concerns which were brought to my attention. I have since been working with local residents to have speed humps and a CCTV camera installed as well as road design improvements. The CCTV camera was installed several months ago but remains unconnected and non-functional. City staff also have not provided an update on the street redesign since the 2019 site visit. I am writing today to request an update on these initiatives.
The Toronto and East York Community Council: 1. Requested Transportation Services provide an update on the street redesign and installation of the CCTV camera at the Chester Hill Lookout and report back to Toronto and East York Community Council at the May 26, 2022 meeting.
Staff recommendation as filed
Councillor Fletcher recommends that the Toronto and East York Community Council: 1. Request Transportation Services provide an update on the street redesign and installation of the CCTV camera at the Chester Hill Lookout and report back to Toronto and East York Community Council at the May 26, 2022 meeting.
TE32.74adopted
Speed Bumps - Lane South of Hartford Avenue, between Herbert Avenue and Elmer Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the installation of speed bumps in the lane south of Hartford Avenue, between Herbert Avenue and Elmer Avenue.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the lane south of Hartford Avenue, between Herbert Avenue and Elmer Avenue, at the locations as shown on Attachment 1 dated January 2022, attached to the report (April 1, 2022) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the lane south of Hartford Avenue, between Herbert Avenue and Elmer Avenue, at the locations as shown on Attachment 1 dated January 2022, attached to the report entitled "Speed Bumps - Lane South of Hartford Avenue, between Herbert Avenue and Elmer Avenue", dated April 1, 2022 from the Director, Traffic Management, Transportation Services.
TE32.75adopted
Re-Open TE27.59 Speed Hump Installation on St. Clarens Avenue
In August 2020, residents reached out to my office with an urgent concern about speeding along their street and requested via a community-led petition that traffic calming measures (speed humps) be installed as a method of addressing these concerns. Unanimously, the residents surveyed were in support of making this change. By way of re-opening this item, I am requesting that Traffic Operations staff amend TE27.59, as per the recommendations, to include information that was omitted in the Community Council decision regarding the installation of speed humps on St. Clarens Avenue.
The Toronto and East York Community Council: 1. Re-opened TE27.59 entitled "Speed Hump Installation on St. Clarens Avenue", with respect to Recommendation 2 of the Toronto and East York Community Council's decision. 2. Deleted Recommendation 2 of its decision with respect to Item TE27.59 and adopt the following: "2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter sections of the roadway on St. Clarens Avenue, to install seven speed humps, generally as shown on the copy of Drawing No. 421G-3910 and Drawing No. 421G-3920, dated August 2021, from the Acting Director, Traffic Management, Transportation Services, Toronto and East York District."
Staff recommendation as filed
Councillor Bailão recommends that the Toronto and East York Community Council: 1. Re-open TE27.59 entitled "Speed Hump Installation on St. Clarens Avenue", with respect to Recommendation 2 of the Toronto and East York Community Council's decision.' 2. Delete Recommendation 2 of its decision with respect to Item TE27.59 and adopt the following: "2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter sections of the roadway on St. Clarens Avenue, to install seven speed humps, generally as shown on the copy of Drawing No. 421G-3910 and Drawing No. 421G-3920, dated August 2021, from the Acting Director, Traffic Management, Transportation Services, Toronto and East York District."