The full agenda, as filed
All 55 items in the clerk’s order. Each carries the city’s own words: the staff recommendation, what the body decided, and its status. Nothing below is written by us.
TE5.1adopted
This report recommends that the name Pura Vida Lane be approved to identify an existing public lane located south of Hallam Street extending between Delaware Avenue and Concord Avenue. This naming proposal complies with the City of Toronto Street Naming Policy which can be found at https://www.toronto.ca/city-government/planning-development/street-naming/
The Toronto and East York Community Council: 1. Approved the name "Pura Vida Lane" for an existing public lane located south of Hallam Street extending between Delaware Avenue and Concord Avenue.
Staff recommendation as filed
Engineering and Construction Services recommends that Toronto and East York Community Council: 1. Approve the name "Pura Vida Lane" for an existing public lane located south of Hallam Street extending between Delaware Avenue and Concord Avenue.
TE5.2adopted
This application proposes to remove the holding symbol ("H") for the lands identified in the site-specific Zoning By-law No. 229-2023 (OLT) for 35, 41, and 95 High Park Avenue and 66 and 102-116 Pacific Avenue. The application includes the demolition of 20 townhouses and the construction of three buildings being 35, 11, and 30-storeys in height with 366, 103, and 294 respective dwelling units. Four existing buildings containing 201, 320, 217 and 230 dwelling units will remain on site with existing and new buildings sharing two levels of underground parking. Site-specific Zoning By-law No. 229-2023 (OLT) includes a holding symbol which requires that certain conditions be fulfilled prior to development proceeding on site. Staff have reviewed the materials submitted in support of the application and are satisfied that the conditions have been fulfilled. The removal of the holding symbol is appropriate at this time. This report reviews and recommends approval of the application to amend Zoning By-law No. 229-2023 (OLT) to remove the holding symbol.
The Toronto and East York Community Council recommends that: 1. City Council amend Zoning By-law 229-2023 (OLT) for the lands at 35, 41 and 95 High Park Avenue and 66 and 102 Pacific Avenue substantially in accordance with the draft Zoning By-law Amendment included as Attachment 2 to the report (April 28, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the Zoning By-law Amendment as may be required.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 229-2023 (OLT) for the lands at 35, 41 and 95 High Park Avenue and 66 and 102 Pacific Avenue substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 2 to this report. 2. City Council authorizes the City Solicitor to make such stylistic and technical changes to the Zoning By-law Amendment as may be required.
TE5.3deferred
This report reviews and recommends approval of the application to amend the Zoning By-law to permit an eight-storey mixed-use building with 88 dwellings units and 230 square metres of commercial space on the ground floor. The proposal will provide a contextually appropriate Mid-Rise building that fits within the planned and existing context and appropriately transitions to lower scaled neighbourhood areas to the south of the site. The report also recomments approval of the application to demolish two rental dwelling units, subject to the conditions set out in this report.
The Toronto and East York Community Council adjourned the public meeting for 3239-3251 Dundas Street West - Zoning By-law Amendment and Rental Housing Demolition Application - Decision Report - Approval, until June 22, 2023 at 10:00 a.m.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 3239-3251 Dundas Street West substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 5 to this report. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required. 3. As part of the Site Plan Control process, the applicant must submit revised Architectural Plans with façade design and building materiality to the satisfaction of the Chief Planner and Executive Director of the City Planning Division. 4. City Council approve the Rental Housing Demolition Application File No. 21 247134 STE 04 RH in accordance with Chapter 667 of the Toronto Municipal Code and pursuant to Section 111 of the City of Toronto Act, 2006 which allows for the demolition of two (2) existing rental dwelling units located at 3251 Dundas Street West, subject to the following condition: a. the owner shall provide an acceptable Tenant Relocation and Assistance Plan to all Eligible Tenants of the two rental dwelling units proposed to be demolished, including addressing the provision of alternative accommodation at similar rents in the form of rent gap payments to assist in transitioning to market rental housing, and other assistance to mitigate hardship. The Tenant Relocation and Assistance Plan shall be to the satisfaction of the Chief Planner and Executive Director, City Planning; and b. the owner shall enter into, and register on title at 3239-3251 Dundas Street West, an agreement pursuant to Section 111 of the City of Toronto Act, 2006 to secure the condition outlined in Recommendation 5.a. above, all to the satisfaction of the City Solicitor and the Chief Planner and Executive Director, City Planning. 5. City Council authorize the Chief Planner and Executive Director, City Planning to issue Preliminary Approval of the Rental Housing Demolition Permit under Chapter 667 of the Toronto Municipal Code pursuant to Section 111 of the City of Toronto Act, 2006 for the demolition of two (2) existing rental dwelling units at 3251 Dundas Street West after all the following have occurred: a. All conditions in Recommendation 5 above have been fully satisfied and secured; b. the Zoning By-law Amendments have come into full force and effect; c. the issuance of the Notice of Approval Conditions for site plan approval by the Chief Planner and Executive Director, City Planning or designate, pursuant to Section 114 of the City of Toronto Act, 2006; d. the issuance of excavation and shoring permits (conditional or full permit) for the approved development on the site; e. the execution and registration of one or more agreements by the Owner, to the satisfaction of the City Solicitor, to secure the Tenant Relocation and Assistance Plan required in Recommendation 5 above and any other rental housing matters as deemed appropriate or necessary by the Chief Planner and Executive Director, City Planning; and f. written confirmation by the owner that all existing rental dwelling units are vacant. 6. City Council authorize the Chief Building Official and Executive Director, Toronto Building to issue a Rental Housing Demolition Permit under Chapter 667 of the Toronto Municipal Code after the Chief Planner and Executive Director, City Planning has given the Preliminary Approval referred to in Recommendation 6 above. 7. City Council authorize the Chief Building Official and Executive Director, Toronto Building to issue a Residential Demolition Permit under Section 33 of the Planning Act and Chapter 363 of the Toronto Municipal Code for 3239-3251 Dundas Street West after the Chief Planner and Executive Director, City Planning has given the Preliminary Approval referred to in Recommendation 6 above, which may be included in the Rental Housing Demolition Permit under Chapter 667 pursuant to section 6.2 of Chapter 363, on condition that: a. the owner removes all debris and rubble from the site immediately after demolition to the satisfaction of the Chief Building Official and Executive Director, Toronto Building; b. the owner erects solid construction hoarding to the satisfaction of the Chief Building Official and Executive Director, Toronto Building; c. the owner erects the proposed building no later than five years from the date on which the demolition of the existing rental dwelling units commences, subject to the timeframe being extended at the discretion of the Chief Planner and Executive Director, City Planning; and d. should the owner fail to complete the proposed development within the time specified the in Recommendation 8.c. above, the City Clerk shall be entitled to enter on the collector's roll, as with municipal property taxes, an amount equal to the sum of $20,000 per dwelling unit for which a demolition permit is issued, and that such amount shall, until payment, be a lien or charge upon the land for which the Residential Demolition Permit is issued.
TE5.4adopted
31-37 Gladstone Avenue - Zoning By-law Amendment Application - Decision Report - Approval
This report reviews and recommends approval of the application to amend the Zoning By-law to permit a 6-storey (20.5 metre, inclusive of mechanical penthouse) residential building containing 28 dwelling units. The proposal will provide a contextually appropriate mid-rise building that fits within the existing and planned context and appropriately transitions to lower scaled neighbourhood areas to the north and east. This report also recommends that the site be zoned with an (H) - Holding Symbol which can be lifted through the resolution of matters related to servicing the site.
The Toronto and East York Community Council recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 31-37 Gladstone substantially in accordance with the draft Zoning By-law Amendment included as Attachment 5 to the report (April 28, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 31-37 Gladstone substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 5 to this report. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.
TE5.5adopted
124 Bedford Road - Zoning By-law Amendment Application - Decision Report - Approval
This report reviews and recommends approval of the application to amend the Zoning By-law to permit an office use to occupy the entire house-form building at 124 Bedford Road.
The Toronto and East York Community Council recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 124 Bedford Road substantially in accordance with the draft Zoning By-law Amendment included as Attachment 4 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 124 Bedford Road substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 4 to this report. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.
TE5.6adopted
This report reviews and recommends approval of the application to amend the Official Plan and Zoning By-law to permit a 30.5-metre (8 floors plus 1 mechanical floor) residential building containing 143 units, and 98 vehicular and 143 bicycle parking spaces, at the southeast corner of Davenport Road and Kendal Avenue.
The Toronto and East York Community Council recommends that: 1. City Council amend the Official Plan for the lands at 555 Davenport Road, substantially in accordance with the draft Official Plan Amendment included as Attachment 5 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council amend Zoning By-law 569-2013 for the lands at 555 Davenport Road, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 6 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 3. City Council amend City of Toronto Zoning By-law 438-86 for the lands at 555 Davenport Road, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 7 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 4. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and Zoning By-law Amendments as may be required. 5. Before introducing the necessary Bills to City Council for enactment, City Council require the owner to: a. submit a Functional Servicing and Stormwater Management Report, Servicing Report Groundwater Summary, and Hydrological Review Summary Form for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and b. enter into a Municipal Infrastructure Agreement, to financially secure the construction of any improvements to the municipal infrastructure, should it be determined that upgrades and road improvements are required to support the development according to the transportation report, accepted by the General Manager, Transportation Services, and the Functional Servicing Report, accepted by the Chief Engineer and Executive Director, Engineering and Construction Services.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend the Official Plan, for the lands at 555 Davenport Road, substantially in accordance with the draft Official Plan Amendment included as Attachment No. 5 to this report. 2. City Council amend Zoning By-law 569-2013 for the lands at 555 Davenport Road, substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 6 to this report. 3. City Council amend City of Toronto Zoning By-law 438-86 for the lands at 555 Davenport Road, substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 7 to this report. 4. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and Zoning By-law Amendments as may be required. 5. Before introducing the necessary Bills to City Council for enactment, require the owner to: a. Submit a Functional Servicing and Stormwater Management Report, Servicing Report Groundwater Summary, and Hydrological Review Summary Form for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services. b. Enter into a Municipal Infrastructure Agreement, to financially secure the construction of any improvements to the municipal infrastructure, should it be determined that upgrades and road improvements are required to support the development according to the transportation report, accepted by the General Manager, Transportation Services, and the Functional Servicing Report, accepted by the Chief Engineer and Executive Director, Engineering and Construction Services.
TE5.7adopted
24-26 Imperial Street - Zoning By-law Amendment Application - Decision Report - Approval
This report reviews and recommends approval of the application to amend the Zoning By-law to permit a 9-storey (31.0-metre, plus an additional 5.0-metre mechanical penthouse) residential building at 24-26 Imperial Street. The building is proposed to contain 30 dwelling units totaling 4,000 square metres of gross floor area and 8 parking spaces in a single level underground parking garage.
The Toronto and East York Community Council recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 24-26 Imperial Street substantially in accordance with the draft Zoning By-law Amendment included as Attachment 5 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment, as may be required. 3. Before introducing the necessary Bills to City Council for enactment, City Council require the owner to: a. submit a Functional Servicing and Stormwater Management Report and Servicing Report Groundwater Summary for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and b. enter into a Municipal Infrastructure Agreement, to financially secure the construction of any improvements to the municipal infrastructure, should it be determined that upgrades and road improvements are required to support the development according to the transportation report accepted by the General Manager, Transportation Services and the Functional Servicing Report accepted by the Chief Engineer and Executive Director, Engineering and Construction Services.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 569-2013 for the lands at 24-26 Imperial Street substantially in accordance with the draft Zoning By-law Amendment included as Attachment 5 to this report. 2. City Council authorizes the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment, as may be required. 3. Before introducing the necessary bills to City Council for enactment, require the owner to: a. Submit a Functional Servicing and Stormwater Management Report and Servicing Report Groundwater Summary for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services. b. Enter into a Municipal Infrastructure Agreement, to financially secure the construction of any improvements to the municipal infrastructure, should it be determined that upgrades and road improvements are required to support the development according to the transportation report accepted by the General Manager of Transportation Services and the Functional Servicing Report accepted by the Chief Engineer and Executive Director of Engineering and Construction Services.
TE5.8adopted
This report reviews and recommends approval of the application to amend the Official Plan and Zoning By-law to permit a 30.5-metre (8 floors plus 1 mechanical floor) residential building containing 152 units, and 103 vehicular and 153 bicycle parking spaces, at the northeast corner of Macpherson Avenue and Kendal Avenue.
The Toronto and East York Community Council recommends that: 1. City Council amend the Official Plan for the lands at 500 Macpherson Avenue, substantially in accordance with the draft Official Plan Amendment included as Attachment 5 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council amend Zoning By-law 569-2013 for the lands at 500 Macpherson Avenue, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 6 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 3. City Council amend City of Toronto Zoning By-law 438-86 for the lands at 500 Macpherson Avenue, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 7 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 4. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and Zoning By-law Amendments as may be required. 5. Before introducing the necessary Bills to City Council for enactment, City Council require the owner to: a. submit a Functional Servicing and Stormwater Management Report, and Hydrological Review Summary Form for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and b. enter into a Municipal Infrastructure Agreement to financially secure the construction of any improvements to the municipal infrastructure, should it be determined that upgrades and road improvements are required to support the development according to the transportation report, accepted by the General Manager, Transportation Services and the Functional Servicing Report, accepted by the Chief Engineer and Executive Director, Engineering and Construction Services.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend the Official Plan, for the lands at 500 Macpherson Avenue, substantially in accordance with the draft Official Plan Amendment included as Attachment 5 to this report. 2. City Council amend Zoning By-law 569-2013, for the lands at 500 Macpherson Avenue, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 6 to this report. 3. City Council amend City of Toronto Zoning By-law 438-86 for the lands at 500 Macpherson Avenue, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 7 to this report. 4. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment and Zoning By-law Amendments as may be required. 5. Before introducing the necessary Bills to City Council for enactment, require the owner to: a. Submit a Functional Servicing and Stormwater Management Report, and Hydrological Review Summary Form for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services. b. Enter into a Municipal Infrastructure Agreement to financially secure the construction of any improvements to the municipal infrastructure, should it be determined that upgrades and road improvements are required to support the development according to the transportation report, accepted by the General Manager, Transportation Services, and the Functional Servicing Report, accepted by the Chief Engineer and Executive Director, Engineering and Construction Services.
TE5.9forwarded without recommendation
This report reviews and recommends approval of the application to amend the Zoning By-law to permit a 12-storey (47.5 metres including mechanical penthouse) mixed-use building containing 180 dwelling units. The proposal results in an appropriate built form that fits with the existing and planned context of the surrounding area. Staff recommend that Council support approval of the application.
The Toronto and East York Community Council forwards the item to City Council without recommendations.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend Zoning By-law 569-2013, for the lands at 880-882 and 888 Eastern Avenue and 74-80 Knox Avenue, substantially in accordance with the draft Zoning By-law Amendment included as Attachment 5 to the report.. 2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.
TE5.10amended
This report reviews and recommends refusal of the application to amend the Official Plan and Zoning By-law to permit a 94-storey mixed-use tower containing 1,262 dwelling units and 272 square metres of retail space. The application has not demonstrated that the proposed tall building can be accommodated on the site in a manner that is appropriate within the existing context. The development as proposed, does not conform with the Official Plan, the Downtown Secondary Plan, and, does not meet the intent of the Tall Building Design Guidelines.
The Toronto and East York Community Council recommends that: 1. City Council refuse the Official Plan and Zoning By-law Amendment application at 15-19 Bloor Street West for the reasons set out in the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor, together with appropriate staff, to appear before the Ontario Land Tribunal in support of City Council's decision to refuse the application, in the event the application is appealed to the Ontario Land Tribunal. 3. City Council direct the City Solicitor to request the Ontario Land Tribunal to withhold its order in the event that the project is approved in some form, until the following have been secured: a. the final form of the Official Plan Amendment and Zoning By-law Amendment are to the satisfaction of the Chief Planner and Executive Director, City Planning, and the City Solicitor; b. the owner has revised the Functional Servicing and Stormwater Management Report, Hydrogeological Report, Hydrological Review Summary, and Groundwater Summary to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; c. all comments from Engineering and Construction Services contained in their April 21, 2023 memorandum are addressed to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and d. the owner has made satisfactory arrangements for the construction of any improvements to the municipal infrastructure in connection with the Functional Servicing and Stormwater Management Report, to be resubmitted for review and acceptance by the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements to such infrastructure are required to support this development. 4. City Council authorize the City Solicitor and other appropriate staff to take any necessary steps to implement City Council's decision. 5. City Council receive the supplementary report ((May 16, 2023) from the Director, Community Planning, Toronto and East York District for information.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council refuse the Official Plan and Zoning By-law Amendment application at 15-19 Bloor Street West for the reasons set out in this report. 2. City Council authorize the City Solicitor, together with appropriate staff, to appear before the Ontario Land Tribunal in support of City Council's decision to refuse the application, in the event the application is appealed to the Ontario Land Tribunal. 3. City Council authorize the City Solicitor and other appropriate staff to take any necessary steps to implement City Council's decision. 4. City Council direct the City Solicitor to request that the Ontario Land Tribunal withhold its order in the event that the project is approved in some form, until the following have been secured: the final form of the Official Plan Amendment and Zoning By-law Amendment are to the satisfaction of the Chief Planner and Executive Director, City Planning, and the City Solicitor; the owner has revised the Functional Servicing and Stormwater Management Report, Hydrogeological Report, Hydrological Review Summary, and Groundwater Summary to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; all comments from Engineering and Construction Services contained in their April 21, 2023 memorandum are addressed to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and, the owner has made satisfactory arrangements for the construction of any improvements to the municipal infrastructure in connection with the Functional Servicing and Stormwater Management Report, to be resubmitted for review and acceptance by the Chief Engineer and Executive Director, Engineering and Construction Services, should it be determined that improvements to such infrastructure are required to support this development.
TE5.11adopted
33 and 39 Davies Avenue - Zoning By-law Amendment Application - Decision Report - Refusal
On May 27, 2021, a Zoning By-law Amendment application was submitted to permit a 19-storey office tower within an Employment Area on the east side of the Don Valley, north of Queen Street East. In response to feedback received from the community and City Planning the application was subsequently resubmitted on January 13, 2023, with a revised massing and height reduced to 15-storeys. This report reviews and recommends refusal of the revised application to amend the Zoning By-law, as the proposed built form is not appropriate for the site's location within a low- and mid-rise employment area adjacent to Neighbourhoods and Joel Weeks Park. The proposal does not conform with the Official Plan and should be refused.
The Toronto and East York Community Council recommends that: 1. City Council refuse the application for Zoning By-law Amendment at 33 and 39 Davies Avenue for the reasons set out in the report (May 1, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council authorize the City Solicitor, together with appropriate staff, to appear before the Ontario Land Tribunal in support of City Council's decision to refuse the application, in the event the application is appealed to the Ontario Land Tribunal. 3. City Council direct the City Solicitor to request the Ontario Land Tribunal to withhold its order in the event that the project is approved in some form, until the City Solicitor confirms that the following have been secured: a. the final form of the Zoning By-law Amendment is to the satisfaction of the Chief Planner and Executive Director, City Planning, and the City Solicitor, in consultation with the Chief Engineer and Executive Director, Engineering and Construction Services, and other appropriate Divisions; b. the owner has revised the Site Servicing and Stormwater Management Report to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and c. all comments contained in the Engineering and Construction Services memorandum dated December 31, 2021 are addressed to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, and the General Manager, Transportation Services. 4. City Council direct staff to continue to work with the applicant to resolve outstanding issues identified in the report (May 1, 2023) from the Acting Director, Community Planning, Toronto and East York District. 5. City Council authorize the City Solicitor and other appropriate staff to take any necessary steps to implement City Council's decision.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council refuse the application for Zoning By-law Amendment at 33 and 39 Davies Avenue for the reasons set out in this report. 2. City Council authorize the City Solicitor, together with appropriate staff, to appear before the Ontario Land Tribunal in support of City Council's decision to refuse the application, in the event the application is appealed to the Ontario Land Tribunal. 3. City Council direct the City Solicitor to request that the Ontario Land Tribunal withhold its order in the event that the project is approved in some form, until the City Solicitor confirms that the following have been secured: a. the final form of the Zoning By-law Amendment is to the satisfaction of the Chief Planner and Executive Director, City Planning, and the City Solicitor, in consultation with the Chief Engineer and Executive Director, Engineering and Construction Services, and other appropriate Divisions; b. the owner has revised the Site Servicing and Stormwater Management Report to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and c. all comments contained in the Engineering and Construction Services memorandum dated December 31, 2021 are addressed to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, and the General Manager, Transportation Services. 4. City Council authorize the City Solicitor and other appropriate staff to take any necessary steps to implement City Council's decision. 5. City council direct staff to continue to work with the applicant to resolve outstanding issues identified in this report.
TE5.12adopted
On June 29, 2020, a Zoning By-law Amendment application was submitted to permit a 50-storey (165 metres, including mechanical penthouse) mixed-use building at 353-355 Adelaide Street West and 46 Charlotte Street, and a 12-storey extension fronting 16 Oxley Street. The proposal included 293 residential units and 7,540 square metres of retail and office space. A 6-storey heritage building located at 355-359 Adelaide Street West was proposed to be incorporated into the development. Additional materials to make the application complete were submitted on October 6, 2020. A Site Plan Control application was submitted on August 19, 2021. In July 2022, a new owner purchased the subject property from the previous applicant. Subsequently, on October 27, 2022, the new owner appealed the Zoning By-law and Site Plan applications to the Ontario Land Tribunal ("OLT") as a result of City Council not making a decision within the timeframe legislated by the Planning Act. Further, in February 2023, the new owner submitted updated materials revising the Zoning Amendment application, increasing the proposed height of the building to 58 storeys (187 metres, including mechanical), revising the Oxley Street portion of the building to 6 storeys, increasing the number of residential units to 503 units and decreasing the amount of retail and office space to 2,802 square metres. The heritage building continues to be incorporated into the proposed development. The revised proposal is the subject of the appeal before the OLT and this report. This report recommends that the City Solicitor and appropriate City staff attend the OLT hearing to oppose the application in its current form and continue discussions with the applicant in an attempt to resolve outstanding issues.
The Toronto and East York Community Council recommends that: 1. City Council direct the City Solicitor and appropriate staff to attend the Ontario Land Tribunal in opposition to the current application regarding the Zoning By-law Amendment appeal for the lands at 353-355 Adelaide Street West, 46 Charlotte Street and 16 Oxley Street and to continue discussions with the applicant in an attempt to resolve the issues outlined in the report (May 3, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. In the event that the Ontario Land Tribunal allows the appeal in whole or in part, City Council authorize the City Solicitor to request that the issuance of any final order on the Zoning By-law Amendment be withheld until such time as the City Solicitor advises that: a. the proposed Zoning By-law Amendment is in a context and form satisfactory to the Chief Planner and Executive Director, City Planning, and the City Solicitor; and b. the owner has, at its sole expense: i. submitted a revised Functional Servicing Report and Stormwater Management Report, Hydrogeological Review, including the Foundation Drainage Report ("Engineering Reports") to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, in consultation with the General Manager, Toronto Water; ii. secured the design and provision of financial securities for any upgrades or required improvements to the existing municipal infrastructure identified in the accepted Engineering Reports, to support the development, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Toronto Water, should it be determined that improvements or upgrades are required to support the development, according to the accepted Engineering Reports, accepted by the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Toronto Water; iii. implemented the accepted Engineering Reports and any required changes have been made to the proposed amending By-laws to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor, including the use of a Holding ("H") By-law symbol regarding any new or upgrades to existing municipal servicing infrastructure, as may be required; iv. submitted a revised Pedestrian Level Wind Study, acceptable and satisfactory to the Director, Community Planning, Toronto and East York District; and v. submitted a revised Heritage Impact Assessment that includes a detailed conservation strategy for the property at 353-355 Adelaide Street West, to the satisfaction of the Senior Manager, Heritage Planning, Urban Design, City Planning. 3. City Council authorize the City Solicitor and City staff to take any necessary steps to implement City Council's decision.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council direct the City Solicitor and appropriate staff to attend the Ontario Land Tribunal in opposition to the current application regarding the Zoning By-law Amendment appeal for the lands at 353-355 Adelaide Street West, 46 Charlotte Street and 16 Oxley Street and to continue discussions with the applicant in an attempt to resolve the issues outlined in this report. 2. In the event that the Ontario Land Tribunal allows the appeal in whole or in part, City Council authorize the City Solicitor to request that the issuance of any final order on the Zoning By-law Amendment be withheld until such time as the City Solicitor advises that: a. the proposed Zoning By-law Amendment is in a context and form satisfactory to the Chief Planner and Executive Director, City Planning, and the City Solicitor; b. the owner has, at its sole expense: i. submitted a revised Functional Servicing Report and Stormwater Management Report, Hydrogeological Review, including the Foundation Drainage Report ("Engineering Reports") to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services, in consultation with the General Manager, Toronto Water; ii. secured the design and provision of financial securities for any upgrades or required improvements to the existing municipal infrastructure identified in the accepted Engineering Reports, to support the development, all to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Toronto Water, should it be determined that improvements or upgrades are required to support the development, according to the accepted Engineering Reports, accepted by the Chief Engineer and Executive Director, Engineering and Construction Services and the General Manager, Toronto Water; iii. implemented the accepted Engineering Reports and any required changes have been made to the proposed amending By-laws to the satisfaction of the Chief Planner, City Planning and the City Solicitor, including the use of a Holding ("H") By-law symbol regarding any new or upgrades to existing municipal servicing infrastructure, as may be required; iv. submitted a revised Pedestrian Level Wind Study, acceptable and satisfactory to the Director, Community Planning, Toronto and East York District; v. submitted a revised Heritage Impact Assessment that includes a detailed conservation strategy for the property at 353-355 Adelaide Street West, to the satisfaction of the Senior Manager, Heritage Planning, Urban Design, City Planning. 3. City Council authorizes the City Solicitor and City staff to take any necessary steps to implement City Council's decision.
TE5.13adopted
309 Armadale Avenue - Application to Remove a Private Tree
This report requests that Toronto and East York Community Council deny the request for a permit to remove one privately owned tree located on the boundary line between the properties of 309 Armadale Avenue and 307 Armadale Avenue. The applicant indicates the reason for requesting removal of the tree is due to its conflict with a fence on the property line, the potential negative impact to the growth of nearby oak trees and cedar hedge, and the desire to manage invasive species. The Norway maple tree, Acer platanoides, in question measures 42 cm in diameter. The City's Tree By-laws do not support the removal of this tree as it is healthy and maintainable. Community Council has delegated authority from City Council to make a final decision as to whether a permit may be issued when an applicant wishes to appeal the City's decision to deny a tree permit.
The Toronto and East York Community Council: 1. Denied the request for a permit to remove one privately owned tree located at 309 Armadale Avenue.
Staff recommendation as filed
The Director of Urban Forestry, Parks, Forestry and Recreation recommends that: 1. Toronto and East York Community Council deny the request for a permit to remove one privately owned tree located at 309 Armadale Avenue.
TE5.14adopted
38 Firstbrooke Road - Application to Remove a Private Tree
This report requests that Toronto and East York Community Council deny the request for a permit to remove one privately owned tree located at 38 Firstbrooke Road. The applicant indicates the reason for requesting removal of the tree is due to property damage and safety concerns related to falling branches and dropping acorns. The red oak tree, Quercus rubra, in question measures 113 cm in diameter. The City's Tree By-laws do not support the removal of this tree as it is healthy and maintainable. Community Council has delegated authority from City Council to make a final decision as to whether a permit may be issued when an applicant wishes to appeal the City's decision to deny a tree permit.
The Toronto and East York Community Council: 1. Denied the request for a permit to remove one privately owned tree located at 38 Firstbrooke Road.
Staff recommendation as filed
The Director of Urban Forestry, Parks, Forestry and Recreation recommends that: 1. Toronto and East York Community Council deny the request for a permit to remove one privately owned tree located at 38 Firstbrooke Road.
TE5.15deferred
104 Scarboro Beach Boulevard - Application to Injure a City Tree
This report requests that Toronto and East York Community Council deny the request for a permit to injure one City-owned tree located at 104 Scarboro Beach Boulevard. The applicant indicates the reason they are requesting to injure the tree is to facilitate transplanting it to an alternative location in order to construct a new parking pad. The red maple tree, Acer rubrum, in question measures 7 cm in diameter. The City's Tree By-laws do not support the injury of this tree as it is healthy and maintainable. Community Council has delegated authority from City Council to make a final decision as to whether a permit may be issued when an applicant wishes to appeal the City's decision to deny a tree permit.
The Toronto and East York Community Council: 1. Deferred consideration of the Item until the June 22, 2023 meeting of the Toronto and East York Community Council.
Staff recommendation as filed
The Director, Urban Forestry, Parks, Forestry and Recreation recommends that: 1. Toronto and East York Community Council deny the request for a permit to injure a City-owned tree located at 104 Scarboro Beach Boulevard.
TE5.16referred
319 High Park Avenue - Residential Demolition Application
This staff report is about a matter for which the Toronto and East York Community Council has delegated authority to make a final decision. In accordance with city-wide residential demolition control under Toronto Municipal Code, Ch. 363, under the authority of Section 33 of the Planning Act, the application for the demolition of an existing two-storey detached single family dwelling and detached garage at 319 High Park Avenue (Application No. 23 133710 DEM 00 DM) is being referred to the Toronto and East York Community Council for consideration to refuse or grant the application, including any conditions, if any, to be attached to the permit application because a building permit has not been issued for a replacement building.
The Toronto and East York Community Council: 1. Referred the Item back to the the Director and Deputy Chief Building Official for further consideration.
Staff recommendation as filed
The Director and Deputy Chief Building Official, Toronto Building, Toronto and East York District recommends that the Toronto and East York Community Council give consideration to the demolition application for 319 High Park Avenue, and decide to: 1. Refuse the application to demolish the two-storey detached single family dwelling and detached garage buildings because there is no permit application to replace the building on the site; or 2. Approve the application to demolish the two-storey detached single family dwelling and detached garage buildings without any conditions; or 3. Approve the application to demolish the two-storey detached single family dwelling and detached garage buildings with the following conditions: a. That construction fences be erected in accordance with the provisions of the Municipal Code, Chapter 363, Article 7, if deemed appropriate by the Chief Building Official; b. That all debris and rubble be removed immediately after demolition; c. That sod be laid on the site and that the site be maintained free of garbage and weeds, in accordance with the Municipal Code Chapter 629-10, paragraph B and 629-11; and d. That any holes on the property are backfilled with clean fill.
TE5.17deferred
95 and 99 Strachan Avenue - Residential Demolition Application
This staff report is regarding a matter for which the Toronto and East York Community Council has delegated authority to make a final decision. In accordance with city-wide residential demolition control under the Toronto Municipal Code Chapter 363, under the authority of Section 33 of the Planning Act, the applications for the demolition of the existing three storey townhouse dwellings at 95 and 99 Strachan Avenue (Application Nos. 23 126286 DEM 00 DM and 23 126460 DEM 00DM) are being referred to the Toronto and East York Community Council for consideration to refuse or grant the applications, including any conditions, if any, to be attached to the permit applications because a building permit has not been issued for a replacement building.
The Toronto and East York Community Council: 1. Deferred consideration of the Item until the June 22, 2023 meeting of the Toronto and East York Community Council.
Staff recommendation as filed
The Director and Deputy Chief Building Official, Toronto Building, Toronto and East York District recommends that the Toronto and East York Community Council give consideration to the demolition applications for 95 and 99 Strachan Avenue and decide to: 1. Refuse the applications to demolish the existing three storey townhouse dwellings because there is no permit to replace the buildings on the site at this time; or 2. Approve the applications to demolish the existing three storey townhouse dwellings without any conditions; or 3. Approve the applications to demolish the existing three storey townhouse dwellings with the following conditions: a. That construction fences be erected in accordance with the provisions of the Municipal Code, Chapter 363, Article 7, if deemed appropriate by the Chief Building Official; b. That all debris and rubble be removed immediately after demolition; c. That sod be laid on the site and that the site be maintained free of garbage and weeds, in accordance with the Municipal Code Chapter 629-10, paragraph B and 629- 11; and d. That any holes on the property are backfilled with clean fill.
TE5.18deferred
The purpose of this staff report is to report on the refusal to issue a permit by Municipal Licensing and Standards in the matter of an application for a Sidewalk Café permit at 1161 Queen Street East, Berkshire Avenue flankage.
The Toronto and East York Community Council: 1. Deferred consideration of the Item until the September 19, 2023 meeting of the Toronto and East York Community Council.
Staff recommendation as filed
The Director, Business Licensing and Regulatory Services, Municipal Licensing and Standards recommends that: 1. Toronto and East York Community Council deny the application for the proposed application Sidewalk Café permit at 1161 Queen Street East, Berkshire Avenue flankage.
TE5.19adopted
Appointments to Business Improvement Area Boards of Management
Toronto and East York Community Council has delegated authority to appoint and remove directors from the boards of Businesses Improvement Areas (BIAs) that fall within its geographic boundaries. The purpose of this report is to recommend that Toronto and East York Community Council appoint directors to the Bloor Annex, Danforth Mosaic, The Junction, Pape Village, Toronto Downtown West, and Trinity Bellwoods BIA Boards of Management, and remove directors from the Hillcrest Village BIA Board of Management.
The Toronto and East York Community Council: 1. Appointed, in accordance with the City's Public Appointments Policy, the following nominees to the Business Improvement Area Boards of Management set out below at pleasure of Toronto and East York Community Council, and for a term expiring at the end of the term of Council or as soon thereafter as successors are appointed: Bloor Annex: Koperdraad, Ron Quintas, Daniel Robinson, Brent Sdao, Larry Venetas, Peter Danforth Mosaic: Belisle, Michelle Borch, Natalie Dertilis, Billy Ferreira, Melanie Gaudel, Krishna Jannetta, Natalee Kinde, Banchi Lee, Jacqueline Lorefice, Enza Mangano, Basil Nakhuda,Yashmeen Reilly, Mary Thompson, Jennifer The Junction: Jimaleh, Maryan Pape Village: Ameen, Jwan Mohammed Toronto Downtown West: Manuel, Michael Trinity Bellwoods: Setton, Aaron Touidjine, Halim 2. Removed the following directors from the Business Improvement Area Boards of Management set out below: Hillcrest Village: Allagas Da Silva, Kathy 3. Directed that Schedule A of the Municipal Code Chapter 19, Business Improvement Areas, be amended by changing the number of directors of the following Boards of Management: Danforth Mosaic 15
Staff recommendation as filed
The General Manager, Economic Development and Culture recommends that Toronto and East York Community Council: 1. In accordance with the City's Public Appointments Policy, appoint the following nominees to the Business Improvement Area Boards of Management set out below at the pleasure of Toronto and East York Community Council, and for a term expiring at the end of the term of Council or as soon thereafter as successors are appointed: Bloor Annex: Koperdraad, Ron Quintas, Daniel Robinson, Brent Sdao, Larry Venetas, Peter Danforth Mosaic: Belisle, Michelle Borch, Natalie Dertilis, Billy Ferreira, Melanie Gaudel, Krishna Jannetta, Natalee Kinde, Banchi Lee, Jacqueline Lorefice, Enza Mangano, Basil Nakhuda,Yashmeen Reilly, Mary Thompson, Jennifer The Junction: Jimaleh, Maryan Pape Village: Ameen, Jwan Mohammed Toronto Downtown West: Manuel, Michael Trinity Bellwoods: Setton, Aaron Touidjine, Halim 2. Remove the following directors from the Business Improvement Area Boards of Management set out below: Hillcrest Village: Allagas Da Silva, Kathy 3. Direct that Schedule A of the Municipal Code Chapter 19, Business Improvement Areas, be amended by changing the number of directors of the following Boards of Management: Danforth Mosaic 15
TE5.20adopted
1-15 Delisle Avenue and 1496-1510 Yonge Street - Public Art Plan
The purpose of this staff report is to seek City Council approval of the 1-15 Delisle Avenue and 1496-1510 Yonge Street, Public Art Plan. The Plan, which is included as Attachment 1 of this report, outlines the method by which the owner will commission public art within the privately-owned, accessible area of the site. The Public Art Plan provides a framework and description of the commissioning of public art including: land acknowledgement for Toronto; introduction; owner; property; site location; site history and source of inspiration; the section 37 agreement; the development; public art vision; public art objectives; public art locations; artist research; artist shortlist; selection committee; mentorship program; community programming opportunity; estimated public art budget and schedule. The attached plan meets the objectives of the City's Percent for Public Art Guidelines and is supported by the Toronto Public Art Commission.
The Toronto and East York Community Council recommends that: 1. City Council approve 1-15 Delisle Avenue and 1496-1510 Yonge Street Public Art Plan in Attachment 1 to the report (May 3, 2023) from the Director, Urban Design.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council approve 1-15 Delisle Avenue and 1496-1510 Yonge Street Public Art Plan as attached (Attachment 1) to the report dated May 3, 2023 from the Director, Urban Design.
TE5.21adopted
1660 Bloor Street West - Construction Staging Area
As the Toronto Transit Commission (TTC) operates a transit service on Bloor Street West, City Council approval of this report is required. Mattamy (Bloor) Limited is constructing a 13-storey residential building at 1660 Bloor Street West. The site is located at the north-west corner of Bloor Street West and Indian Road. Transportation Services is requesting approval to temporarily close the north sidewalk and a portion of the westbound curb lane on Bloor Street West, and temporarily close the west sidewalk and a portion of the southbound curb lane on Indian Road, for a period of 30 months from June 15, 2023 to November 30, 2025, to facilitate construction staging operations. Pedestrian movements will be maintained on the north side of Bloor Street West and the west side of Indian Road abutting the site. The bike lane on the north side of Bloor Street West will also be maintained. The construction staging area will result in the temporary loss of two on-street parking machine spaces on the north side of Bloor Street West.
The Toronto and East York Community Council recommends that: 1. City Council authorize the closure of the north side sidewalk and westbound curb lane on Bloor Street West, between Indian Road and a point 77.0 west, and provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from June 15, 2023 to November 30, 2025. 2. City Council authorize the closure of the west sidewalk and a 1.6 metre wide portion of the southbound curb lane on Indian Road, between Bloor Street West and a point 54.0 metres north of Bloor Street west, and provision of a temporary pedestrian walkway within the closed portion of the southbound curb lane, from June 15, 2023 to November 30, 2025. 3. City Council rescind the existing parking machine regulation on the north side of Bloor Street West, between Indian Road and a point 77 metres west, from 8:00 a.m. to 6:00 p.m., Monday to Saturday, for a maximum period of three hours and at a rate of $2.00 per hour. 4. City Council rescind the existing no stopping prohibition on the north side of Bloor Street West, between a point 51.0 metres west of Indian Road and a point 83 metres east of Indian Road. 5. City Council prohibit stopping at all times on the north side of Bloor Street West, between a point 77 metres west of Indian Road and a point 83.0 metres east of Indian Road. 6. City Council rescind the existing no parking prohibition in effect during all times on both sides of Indian Road, between Bloor Street West and a point 54 metres north. 7. City Council prohibit stopping at all times on both sides of Indian Road, between Bloor Street West and a point 54 metres north. 8. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to construct (as per the City's Engineer approved specifications) and maintain a fully covered, protected and unobstructed walkway, compliant with the Accessibility for Ontarians with Disabilities Act, for all pedestrians, including for those with mobility devices for the entire duration of the construction staging area permit 10. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 11. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 12. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 15. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 16. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 17. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 18. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 19. City Council direct that Bloor Street West and Indian Road be returned to its pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the closure of the north side sidewalk and westbound curb lane on Bloor Street West, between Indian Road and a point 77.0 west, and provision of a temporary pedestrian walkway within the closed portion of the westbound curb lane, from June 15, 2023 to November 30, 2025. 2. City Council authorize the closure of the west sidewalk and a 1.6 metre wide portion of the southbound curb lane on Indian Road, between Bloor Street West and a point 54.0 metres north of Bloor Street west, and provision of a temporary pedestrian walkway within the closed portion of the southbound curb lane, from June 15, 2023 to November 30, 2025. 3. City Council rescind the existing parking machine regulation on the north side of Bloor Street West, between Indian Road and a point 77 metres west, from 8:00 a.m. to 6:00 p.m., Monday to Saturday, for a maximum period of three hours and at a rate of $2.00 per hour. 4. City Council rescind the existing no stopping prohibition on the north side of Bloor Street West, between a point 51.0 metres west of Indian Road and a point 83 metres east of Indian Road. 5. City Council prohibit stopping at all times on the north side of Bloor Street West, between a point 77 metres west of Indian Road and a point 83.0 metres east of Indian Road. 6. City Council rescind the existing no parking prohibition in effect during all times on both sides of Indian Road, between Bloor Street West and a point 54 metres north. 7. City Council prohibit stopping at all times on both sides of Indian Road, between Bloor Street West and a point 54 metres north. 8. City Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 9. City Council direct the applicant to construct (as per the City's engineer approved specifications) and maintain a fully covered, protected and unobstructed walkway, compliant with the Accessibility for Ontarians with Disabilities Act, for all pedestrians, including for those with mobility devices for the entire duration of the construction staging area permit 10. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 11. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 12. City Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 13. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 14. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 15. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 16. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 17. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 18. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 19. City Council direct that Bloor Street West and Indian Road be returned to its pre-construction traffic and parking regulations when the project is complete.
TE5.22amended
191-201 Church Street (Dalhousie Street) - Construction Staging Area Time Extension
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Church Street Limited Partnership is constructing a 39-storey mixed-use development at 191-201 Church Street. The site is located on the east side of Church Street, between Shuter Street and Dundas Street. A portion of the southbound curb lane and west sidewalk on Dalhousie Street is currently closed to accommodate construction staging operations for the development. Toronto and East York Community Council, at its meeting on February 16, 2022, approved the subject construction staging area on Dalhousie Street from April 1, 2022 to May 31, 2023. At the time, the developer indicated they would require the staging area for a total of 26 months, from April 1, 2022 to May 31, 2024. As the previous permit was only approved for a 14-month period, the developer has requested an extension of the duration of the construction staging area on Dalhousie Street in order to complete the construction of the development. Transportation Services is requesting authorization to extend the duration of the construction staging area on Dalhousie Street for an additional seven months, from June 1, 2023 to December 31, 2023, to allow for the construction of the development to be completed.
The Toronto and East York Community Council: 1. Authorized the continuation of the closure of the west sidewalk and a 2.8 metre wide portion of the southbound lane on Dalhousie Street, between a point 52 metres north of Shuter Street and a point 46 metres further north, from June 1, 2023 to December 31, 2023. 2. Directed the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Directed the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Directed the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Directed the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 6. Directed the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 7. Directed the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 8. Directed the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Directed the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Directed the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 12. Directed the applicant to continue to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent Neighbours and local resident groups. 13. Directed the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management. 14. Directed the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 15. Directed the applicant, in consultation with Transportation services, to install sharrow marking onto the roadway and display appropriate signage on the hoarding board to inform motorists and cyclists to safely share the road. 16. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the continuation of the closure of the west sidewalk and a 2.8 metre wide portion of the southbound lane on Dalhousie Street, between a point 52 metres north of Shuter Street and a point 46 metres further north, from June 1, 2023 to December 31, 2023. 2. Toronto and East York Community Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 3. Toronto and East York Community Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 4. Toronto and East York Community Council direct the applicant to continue sweeping the construction site daily and nightly, or more frequently as needed to be cleared of any construction debris and made safe. 5. Toronto and East York Community Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 6. Toronto and East York Community Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkway have proper lighting to ensure safety and visibility at all times of the day and night. 7. Toronto and East York Community Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 8. Toronto and East York Community Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 9. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 10. Toronto and East York Community Council direct the applicant to continue to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct that Dalhousie Street be returned to its pre-construction traffic and parking regulations when the project is complete. 12. Toronto and East York Community Council direct the applicant to continue to establish a construction management working group that meets monthly and invite local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent Neighbours, and local resident groups. 13. Toronto and East York Community Council direct the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association, and Business Improvement Area Board of Management.
TE5.23amended
234-250 King Street East and 162 Princess Street - Construction Staging Area
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Emblem Developments is constructing a 43-storey mixed-use condominium building with ground floor commercial space at 234-250 King Street East and 162 Princess Street. The site is located at the north-west corner of King Street East and Princess Street. Transportation Services is requesting approval to temporarily close the west sidewalk and a portion of the southbound curb lane on Princess Street, and temporarily close Duke Mews laneway, for a period of 53 months from August 1, 2023 to December 31, 2027, to facilitate construction staging operations.
The Toronto and East York Community Council: 1. Authorized the closure of the west side sidewalk and a 2.9 metre wide portion of the southbound curb lane on Princess Street, between King Street East a point 43.9 metres north, and provision of a temporary pedestrian walkway within the closed portion of Princess Street, from August 1, 2023 to August 1, 2024. 2. Temporarily closed Duke Mews laneway, from August 1, 2023 to August 1, 2024. 3. Prohibited stopping at all times on the west side of Princess Street, between King Street East and a point 43.9 metres north. 4. Rescinded the existing parking machine regulation on the west side of Princess Street, between King Street East and a point 43.9 metres north, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 5. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 6. Directed the applicant to construct (as per the City's engineer approved specifications) and maintain a fully covered, protected and unobstructed walkway, compliant with the Accessibility for Ontarians with Disabilities Act, for all pedestrians, including for those with mobility devices for the entire duration of the construction staging area permit 7. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 9. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. Directed the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 16. Directed the Director, Traffic Management, Transportation Services and the applicant to establish a Construction Management Working Group that meets monthly and invite local stakeholders including Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, local resident groups, local Business Improvement Areas and local school administration. 17. Directed the applicant not to schedule staging of construction vehicles on streets in the vicinity of the construction site, without approval from the City's Work Zone Coordinator. 18. Directed that the occupation permit for construction staging on Princess Street and Duke Mews laneway be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Directed the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 20. Directed the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 21. Directed the applicant to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council authorize the closure of the west side sidewalk and a 2.9 metre wide portion of the southbound curb lane on Princess Street, between King Street East a point 43.9 metres north, and provision of a temporary pedestrian walkway within the closed portion of Princess Street, from August 1, 2023 to December 31, 2027. 2. Toronto and East York Community Council temporarily close Duke Mews laneway, from August 1, 2023 to December 31, 2027. 3. Toronto and East York Community Council prohibit stopping at all times on the west side of Princess Street, between King Street East and a point 43.9 metres north. 4. Toronto and East York Community Council rescind the existing parking machine regulation on the west side of Princess Street, between King Street East and a point 43.9 metres north, from 8:00 a.m. to 9:00 p.m., Monday to Saturday and from 1:00 p.m. to 9:00 p.m. Sunday, for a maximum period of three hours and at a rate of $3.00 per hour. 5. Toronto and East York Community Council direct the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 6. Toronto and East York Community Council direct the applicant to construct (as per the City's engineer approved specifications) and maintain a fully covered, protected and unobstructed walkway, compliant with the Accessibility for Ontarians with Disabilities Act, for all pedestrians, including for those with mobility devices for the entire duration of the construction staging area permit 7. Toronto and East York Community Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 8. Toronto and East York Community Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 9. Toronto and East York Community Council direct the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 10. Toronto and East York Community Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 11. Toronto and East York Community Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 12. Toronto and East York Community Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 13. Toronto and East York Community Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 14. Toronto and East York Community Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 15. Toronto and East York Community Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes. 16. Toronto and East York Community Council direct the applicant to provide monthly community meetings, to discuss any concerns raised by the community. 17. Toronto and East York Community Council direct the applicant not to schedule staging of construction vehicles on streets in the vicinity of the construction site, without approval from the City's Work Zone Coordinator. 18. Toronto and East York Community Council direct that the occupation permit for construction staging on Princess Street and Duke Mews laneway be conditional, subject to there being no conflicts with Metrolinx transit project construction. 19. Toronto and East York Community Council direct that Princess Street and Duke Mews be returned to their pre-construction traffic and parking regulations when the project is complete.
TE5.24amended
6-16 Wellesley Street West and 5-7 St. Nicholas Street - Construction Staging Area Time Extension
As the Toronto Transit Commission (TTC) operates a transit service on Wellesley Street West, City Council approval of this report is required. Wellesley Street Nicholas Residences Limited Partnership is constructing a 55-storey residential development building at 6-16 Wellesley Street West and 5-7 St. Nicholas Street. The site is located on the north side of Wellesley Street West, west of Yonge Street between Bistro Lane and St. Nickolas Street. The north sidewalk and a 2.3-metre-wide portion of the westbound curb lane/cycle track on Wellesley Street West, between Bistro Lane and St. Nicholas Street is currently closed to accommodate construction staging operations for the development. In addition, St. Nicholas Street is closed in its entirety, between Wellesley Street West and a point 43 metres north. City Council, at its meeting on May 11, 2022, approved the subject construction staging areas from July 1, 2022 to June 30, 2023. At the time, the developer indicated they would require the staging area for a total of 31 months, from July 1, 2022 to January 31, 2025. As the previous permit was only approved for a 12-month period, the developer has requested an extension of the duration of the construction staging areas on Wellesley Street West and St. Nicholas Street in order to complete the construction of the development. Transportation Services is requesting authorization to extend the duration of the construction staging areas on Wellesley Street West and St. Nicholas Street for an additional 19 months, from July 1, 2023 to January 31, 2025, to allow for the construction of the development to be completed.
The Toronto and East York Community Council recommends that: 1. City Council authorize the continuation of the closure of the north sidewalk and a 2.3-metre-wide portion of the westbound curb lane on Wellesley Street West, between Bistro Lane and St. Nicholas Street, and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane from July 1, 2023 to July 1, 2024. 2. City Council authorize the continuation of the closure of all of St. Nicholas Street, between Wellesley Street West and a point 43 metres north, from July 1, 2023 to July 1, 2024. 3. City Council direct the applicant to pressure wash (or sweep during winter weather conditions) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 5. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications. 6. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 7. City Council direct the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 8. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 10. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. City Council direct the applicant to continue Construction Management Working Group monthly meetings, and inviting local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours and local resident groups. 13. City Council direct that Wellesley Street West and St. Nicholas Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. City Council direct the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association and Business Improvement Area Board of Management. 15. City Council direct the applicant to create a publicly accessible website with regular construction updates and post the website address on the construction site hoarding, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 16. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas, resident associations and local school administration in advance of any physical road modifications. 17. City Council direct the applicant to mitigate light pollution by installing a shield/barrier on any lighting standards in close proximity to adjacent residential properties, such as cranes. 18. City Council direct the applicant, in consultation with Transportation Services, to maintain any bike lanes, and install appropriate signage to inform drivers and cyclists of any changes to the cycling lanes.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. City Council authorize the continuation of the closure of the north sidewalk and a 2.3-metre-wide portion of the westbound curb lane on Wellesley Street West, between Bistro Lane and St. Nicholas Street, and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane from July 1, 2023 to January 31, 2025. 2. City Council authorize the continuation of the closure of all of St. Nicholas Street, between Wellesley Street West and a point 43 metres north, from July 1, 2023 to January 31, 2025. 3. City Council direct the applicant to pressure wash (or sweep during winter weather conditions) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe. 4. City Council direct the applicant to continue ensuring that the existing sidewalks or the proposed pedestrian walkways have proper enhanced lighting to ensure safety and visibility at all times of the day and night. 5. City Council direct the applicant to continue consulting and communicating all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications. 6. City Council direct the applicant to continue installing appropriate signage and converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times. 7. City Council direct the applicant to continue providing a sufficient number of traffic control persons as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public. 8. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Traffic Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public. 9. City Council direct the applicant to continue installing cane detection within the covered and protected walkway to guide pedestrians who are visually impaired. 10. City Council direct the applicant to continue posting a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 11. City Council direct the applicant to continue providing and installing public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 12. City Council direct the applicant to continue construction management working group monthly meetings, and inviting local stakeholders including Transportation Services, Municipal Licensing and Standards, Toronto Buildings, adjacent neighbours, and local resident groups. 13. City Council direct that Wellesley Street West and St. Nicholas Street be returned to its pre-construction traffic and parking regulations when the project is complete. 14. City Council direct the applicant to continue to email monthly construction progress reports to the local Councillor, local residents' association, and Business Improvement Area Board of Management.
TE5.25amended
Port Lands Flood Protection and Enabling Infrastructure - Construction Staging Time Extension
As the Toronto Transit Commission (TTC) operates a transit service on Commissioners Street, City Council approval is required. The TTC service has been rerouted along Villiers Street and Saulter Street South. Waterfront Toronto, City of Toronto, Toronto and Region Conservation Authority (TRCA) and the Toronto Port Lands Company (TPLC) have developed the Port Lands Flood Protection Project (PLFPP) to protect the Lower Don Lands and adjacent areas from potential loss of life and costly flood damage associated with a flood event, while triggering economic development. The solution involves creating two additional outlets for the Don River, which ultimately will be surrounded by new parks, green space and public realm enhancements. Several roads within the Port Lands area will be impacted. City Council, at its meeting on May 11 and 12, 2022, authorized a time extension of the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway; and traffic and parking regulation amendments on Commissioners Street, Don Roadway, Villiers Street and Saulter Street South, from May 17, 2022 to May 31, 2023. Waterfront Toronto has requested an extension of the duration of the full closure on Commissioners Street, in order to complete the road reconstruction. Based on the information provided by Waterfront Toronto, the site has experienced issues with equipment failure, high levels of groundwater infiltration coupled with poor soil conditions. Transportation Services is requesting authorization to extend the duration of the full closure of Commissioners Street until October 31, 2023.
The Toronto and East York Community Council recommend that: 1. City Council authorize the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway, from June 1, 2023 to October 31, 2023. 2. City Council designate the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only, from June 1, 2023 to October 31, 2023. 3. City Council designate the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, from June 1, 2023 to October 31, 2023. 4. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street, from June 1, 2023 to October 31, 2023. 5. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway, from June 1, 2023 to October 31, 2023. 6. City Council authorize an all way stop control at the intersection of Villiers Street and Saulter Street South, from June 1, 2023 to October 31, 2023. 7. City Council designate the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, from June 1, 2023 to October 31, 2023. 8. City Council designate the southerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound left turns only, from to June 1, 2023 9. City Council designate the northerly eastbound lane on Villiers Street, from Don Roadway to a point 30.5 metres west, for eastbound left turns only, from June 1, 2023 to October 31, 2023. 10. City Council designate the westerly southbound lane on Don Roadway, from Villiers Street to a point 30.5 metres north, for southbound left turns only, from June 1, 2023 to October 31, 2023. 11. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed. 12. City Council direct that prior to the extending the closure of Lakeshore East that the Memorandum of Understanding be updated to include and maintenance regime that ensures safe cycling every day, including that the maintenance log be provided to the office of the General Manager, Transportation Services and the local Councillor on a daily basis.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the temporary full closure of Commissioners Street to all road users from the east curb line of Cherry Street to a point 120 metres east of Don Roadway, from June 1, 2023 to October 31, 2023. 2. City Council designate the north branch of Villiers Street between Cherry Street and Don Roadway as one-way westbound traffic only, from June 1, 2023 to October 31, 2023. 3. City Council designate the south branch of Villiers Street, between Cherry Street and Don Roadway as one-way for eastbound traffic only, from June 1, 2023 to October 31, 2023. 4. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Cherry Street, from June 1, 2023 to October 31, 2023. 5. City Council authorize the installation of temporary traffic control signals at the intersection of Villiers Street and Don Roadway, from June 1, 2023 to October 31, 2023. 6. City Council authorize an all way stop control at the intersection of Villiers Street and Saulter Street South, from June 1, 2023 to October 31, 2023. 7. City Council designate the northerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound right turns only, from June 1, 2023 to October 31, 2023. 8. City Council designate the southerly westbound lane on Villiers Street, from Cherry Street to a point 40 metres east, for westbound left turns only, from to June 1, 2023 9. City Council designate the northerly eastbound lane on Villiers Street, from Don Roadway to a point 30.5 metres west, for eastbound left turns only, from June 1, 2023 to October 31, 2023. 10. City Council designate the westerly southbound lane on Don Roadway, from Villiers Street to a point 30.5 metres north, for southbound left turns only, from June 1, 2023 to October 31, 2023. 11. City Council direct that Commissioners Street, Don Roadway, Villiers Street and Saulter Street South be returned to pre-construction traffic and parking regulations when the project is completed.
TE5.26adopted
Accessible Parking Spaces - May 2023 (Delegated)
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval for the installation/removal of on-street accessible parking spaces for persons with disabilities.
The Toronto and East York Community Council: 1. Authorized the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 to the report ( May 5, 2023) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation/removal of on-street accessible parking spaces at the locations identified in Attachment 1 and attached to the report entitled "Accessible Parking Spaces-May 2023 (Delegated)" ( May 5, 2023) from the Director, Traffic Management, Transportation Services.
TE5.27adopted
Removal of On-Street Accessible Loading Zone - Shaw Street
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the removal of an on-street accessible loading zone located on the east side of Shaw Street, between a point 27.5 metres north of Garnet Avenue and a point 8 metres further north.
The Toronto and East York Community Council: 1. Rescinded the existing on-street accessible loading zone operating from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the east side of Shaw Street, between a point 27.5 metres north of Garnet Avenue and a point 8 metres further north.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council rescind the existing on-street accessible loading zone operating from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the east side of Shaw Street, between a point 27.5 metres north of Garnet Avenue and a point 8 metres further north.
TE5.28adopted
Delivery Vehicle Parking Zone - Balliol Street
This staff report is about a matter that Community Council has delegated authority from City Council to make the final decision. Transportation Services is recommending the conversion of an existing advisory courier loading zone to an enforceable Delivery Vehicle Parking Zone on the north side of Balliol Street, east of Yonge Street. During the course of the investigation, it was noted that there is a discrepancy between the posted signage and the existing parking regulations on the south side of Balliol Street, between Yonge Street and Mount Pleasant Road (west intersection). Recommendations 5 and 6 in this report will correct this inconsistency.
The Toronto and East York Community Council: 1. Designated a Delivery Vehicle Parking Zone to be in effect at all times for a maximum period of 20 minutes, on the north side of Balliol Street, between a point 17.7 metres east of Yonge Street and a point 19.1 metres further east. 2. Amended the existing parking prohibition in effect at all times, on the north side of Balliol Street, between Yonge Street and a point 93.3 metres east, to be in effect between Yonge Street and a point 17.7 metres east, and between a point 36.8 east of Yonge Street and a point 56.5 metres further east. 3. Rescinded the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Balliol Street, between Yonge Street and a point 179.5 metres west of Mount Pleasant Road (west intersection). 4. Amended the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Balliol Street, between a point 139.1 metres east of Yonge Street and Mount Pleasant Road (west intersection) to be in effect from a point 139.1 metres east of Yonge Street and a point 179.5 metres west of Mount Pleasant Road (west intersection). 5. Amended the existing parking prohibition in effect at all times, on the south side of Balliol Street, between Yonge Street and a point 185.5 metres west of Mount Pleasant Road (west intersection), to be in effect between a point 105 metres east of Yonge Street and a point 185.5 metres west of Mount Pleasant Road (west intersection). 6. Amended the existing standing prohibition in effect at all times, on the south side of Balliol Street, between Yonge Street and a point 105 metres east, to be in effect between Yonge Street and a point 23.5 metres east, and between a point 29 metres east of Yonge Street and a point 76 metres further east.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services, recommends that: 1. Toronto and East York Community Council designate a Delivery Vehicle Parking Zone to be in effect at all times for a maximum period of 20 minutes, on the north side of Balliol Street, between a point 17.7 metres east of Yonge Street and a point 19.1 metres further east. 2. Toronto and East York Community Council amend the existing parking prohibition in effect at all times, on the north side of Balliol Street, between Yonge Street and a point 93.3 metres east, to be in effect between Yonge Street and a point 17.7 metres east, and between a point 36.8 east of Yonge Street and a point 56.5 metres further east. 3. Toronto and East York Community Council rescind the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Balliol Street, between Yonge Street and a point 179.5 metres west of Mount Pleasant Road (west intersection). 4. Toronto and East York Community Council amend the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Balliol Street, between a point 139.1 metres east of Yonge Street and Mount Pleasant Road (west intersection) to be in effect from a point 139.1 metres east of Yonge Street and a point 179.5 metres west of Mount Pleasant Road (west intersection). 5. Toronto and East York Community Council amend the existing parking prohibition in effect at all times, on the south side of Balliol Street, between Yonge Street and a point 185.5 metres west of Mount Pleasant Road (west intersection), to be in effect between a point 105 metres east of Yonge Street and a point 185.5 metres west of Mount Pleasant Road (west intersection). 6. Toronto and East York Community Council amend the existing standing prohibition in effect at all times, on the south side of Balliol Street, between Yonge Street and a point 105 metres east, to be in effect between Yonge Street and a point 23.5 metres east, and between a point 29 metres east of Yonge Street and a point 76 metres further east.
TE5.29amended
Ladysmith Avenue - School Bus Loading Zone
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending the designation of a school bus loading zone on the east side of Ladysmith Avenue, adjacent to Greenwood School, located at 24 Mountjoy Avenue, to provide a safe pick-up/drop-off area for students. This designation will result in loss of five on-street parking spaces on Ladysmith Avenue during the weekday, daytime periods.
The Toronto and East York Community Council: 1. Designated a school bus loading zone to be in effect from 8:00 a.m. to 5:00 p.m., Monday to Friday, on the east side of Ladysmith Avenue, between a point 20.5 metres north of Mountjoy Avenue and a point 30 metres further north. 2. Amended the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Saturday, on the east side of Ladysmith Avenue, between Danforth Avenue and Mountjoy Avenue to be in effect, between Danforth Avenue and a point 50.5 metres north of Mountjoy Avenue. 3. Authorized parking for a maximum period of one hour from 8:00 a.m. to 6:00 p.m., Saturday, on the east side of Ladysmith Avenue, between a point 20.5 metres north of Mountjoy Avenue and a point 30 metres further north. 4. Authorized parking for a maximum period of 10 minutes from 8:00 a.m. to 9:00 a.m. and from 3:00 p.m. to 4:00 p.m., Monday to Friday, on the north side of Mountjoy Avenue, between Ladysmith Avenue and a point 54 metres east. 5. Prohibited parking from 9:00 a.m. to 3:00 p.m. and from 4:00 p.m. to 6:00 p.m., Monday to Friday, on the north side of Mountjoy Avenue, between Ladysmith Avenue and a point 54 metres east. 6. Amended the existing parking prohibition in effect from 8:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Mountjoy Avenue, between Ladysmith Avenue and Lamb Avenue to be in effect between a point 54 metres east of Ladysmith Avenue and Lamb Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council designate a school bus loading zone to be in effect from 8:00 a.m. to 5:00 p.m., Monday to Friday, on the east side of Ladysmith Avenue, between a point 20.5 metres north of Mountjoy Avenue and a point 30 metres further north. 2. Toronto and East York Community Council amend the existing maximum one-hour parking regulation in effect from 8:00 a.m. to 6:00 p.m., Monday to Saturday, on the east side of Ladysmith Avenue, between Danforth Avenue and Mountjoy Avenue to be in effect, between Danforth Avenue and a point 50.5 metres north of Mountjoy Avenue. 3. Toronto and East York Community Council authorize parking for a maximum period of one hour from 8:00 a.m. to 6:00 p.m., Saturday, on the east side of Ladysmith Avenue, between a point 20.5 metres north of Mountjoy Avenue and a point 30 metres further north.
TE5.30adopted
Vehicle Width Restriction - Lane south of Davenport Road, east of Perth Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is seeking authority to prohibit vehicles greater than two metres in width from travelling the lane south of Davenport Road, east of Perth Avenue. Prohibiting vehicles which have a width of two metres or more from travelling on the subject lane section would be beneficial in reducing the incidence of damage to the adjacent private property.
The Toronto and East York Community Council: 1. Prohibited vehicles over 2 metres in width from travelling on lane first south of Davenport Road, between Perth Avenue and lane west of Symington Avenue, north of Kingsley Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council prohibit vehicles over 2 metres in width from travelling on lane first south of Davenport Road, between Perth Avenue and lane west of Symington Avenue, north of Kingsley Avenue.
TE5.31adopted
Vehicle Width Restriction - Bob Fraser Lane
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is recommending that vehicles greater than two metres in width be prohibited from travelling Bob Fraser Lane. Prohibiting vehicles over two metres in width from travelling the subject lane would be beneficial in reducing the incidence of damage to adjacent private property.
The Toronto and East York Community Council: 1. Amended the existing width restriction of vehicles over two metres on the lane first south of Kingston Road, between Silver Birch Avenue and the north/south lane first south of Kingston Road, west of Silver Birch Avenue, to be in effect from Bob Fraser Lane, between Silver Birch Avenue and Bob Fraser Lane (north/south).
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council amend the existing width restriction of vehicles over two metres on the lane first south of Kingston Road, between Silver Birch Avenue and the north/south lane first south of Kingston Road, west of Silver Birch Avenue, to be in effect from Bob Fraser Lane, between Silver Birch Avenue and Bob Fraser Lane (north/south).
TE5.32adopted
Parking Amendments - Emily Street
This staff report is about a matter that Community Council has delegated authority to make a final decision. Transportation Services is recommending that standing be prohibited from Monday to Saturday on the west side of Emily Street, between King Street West and Wellington Avenue West. The proposed parking amendment will replace an existing parking prohibition and will improve traffic operations, traffic flow and sight lines exiting the various underground parking garages on this roadway. During the course of the investigation, it was noted that there is a discrepancy between posted signs and the existing parking regulations. Recommendations 1 and 4 will correct this inconsistency.
The Toronto and East York Community Council: 1. Rescinded the existing standing prohibition in effect from 6:30 p.m. to 12:00 midnight, Monday to Friday, and from 12:00 noon to 6:00 p.m., on Saturday, Sunday, and public holidays; from April. 1 to November 30 of the same year, inclusive, on the west side of Emily Street, between King Street West and Wellington Street West. 2. Rescinded the existing parking prohibition in effect at all times, Monday to Saturday, on the west side of Emily Street, between King Street West and Wellington Street West. 3. Prohibited standing at all times, Monday to Saturday on the west side of Emily Street, between King Street West and Wellington Street West. 4. Rescinded the existing parking prohibition in effect at all times on the east side of Emily Street, between a point 31 metres north of Wellington Street West and a point 47.5 metres south of King Street West.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council rescind the existing standing prohibition in effect from 6:30 p.m. to 12:00 midnight, Monday to Friday, and from 12:00 noon to 6:00 p.m., on Saturday, Sunday, and public holidays; from April. 1 to November 30 of the same year, inclusive, on the west side of Emily Street, between King Street West and Wellington Street West. 2. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times, Monday to Saturday, on the west side of Emily Street, between King Street West and Wellington Street West. 3. Toronto and East York Community Council prohibit standing at all times, Monday to Saturday on the west side of Emily Street, between King Street West and Wellington Street West. 4. Toronto and East York Community Council rescind the existing parking prohibition in effect at all times on the east side of Emily Street, between a point 31 metres north of Wellington Street West and a point 47.5 metres south of King Street West.
TE5.33adopted
Realignment of Permit Parking Area 5E to Exclude the Development Located at 208 Bloor Street West
As the Toronto Transit Commission (TTC) operates a transit service on Bloor Street West, City Council approval of this report is required. The purpose of this report is to respond to Toronto and East York Community Council's direction to review and report back on the realignment of Permit Parking Area 5E to exclude the development located at 208 Bloor Street West. Staff have determined the realignment of the Permit Parking Area 5E is feasible and has no objections to excluding the development located at 208 Bloor Street West. If Toronto and East York Community Council excludes this address from the subject Permit Parking Area, residents and visitors of this address will be prohibited from participating in the on-street permit parking program.
The Toronto and East York Community Council recommends that: 1. City Council amend Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "5E" as shown in Attachment 1 to the report (April 28, 2023) from the Director, Permits and Enforcement, Transportation Services, excluding the development currently located at 208 Bloor Street West.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. City Council approve the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "5E", as shown in Attachment 1 of the report dated April 28, 2023 from the Director, Permits and Enforcement, Transportation Services, excluding the development currently located at 208 Bloor Street West.
TE5.34adopted
Realignment of Permit Parking Area 8B to Exclude the Development Located at 485 Logan Avenue
As the Toronto Transit Commission (TTC) operates a transit service on Logan Avenue, City Council approval of this report is required. The purpose of this report is to respond to Toronto and East York Community Council's direction to review and report back on the realignment of Permit Parking Area 8B to exclude the development located at 485 Logan Avenue. Staff have determined the realignment of the Permit Parking Area 8B is feasible and has no objections to excluding the development located at 485 Logan Avenue. If Toronto and East York Community Council excludes this address from the subject Permit Parking Area, residents and visitors of this address will be prohibited from participating in the on-street permit parking program.
The Toronto and East York Community Council recommends that: 1. City Council amend Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "8B" as shown in Attachment 1 to the report (April 28, 2023) from the Director, Permits and Enforcement, Transportation Services, excluding the development currently located at 485 Logan Avenue.
Staff recommendation as filed
The Director, Permits and Enforcement, Transportation Services recommends that: 1. City Council approve the amendment to Schedule B of the City of Toronto Municipal Code, Chapter 925, Permit Parking, to incorporate a revised map of Permit Parking Area "8B", as shown in Attachment 1 of the report dated April 28, 2023 from the Director, Permits and Enforcement, Transportation Services, excluding the development currently located at 485 Logan Avenue.
TE5.35adopted
Compulsory Stop Control - Hazel Avenue and Balsam Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services is requesting approval to install a compulsory stop control at the uncontrolled "T" type intersection of Hazel Avenue and Balsam Avenue. Based on an assessment undertaken, the installation of compulsory stop control is recommended to clearly define the right-of-way and enhance safety for all road users.
The Toronto and East York Community Council: 1. Authorized a compulsory stop control for westbound traffic on Hazel Avenue at Balsam Avenue.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto East York Community Council authorize a compulsory stop control for westbound traffic on Hazel Avenue at Balsam Avenue.
TE5.36adopted
Traffic Control Signals - Dufferin Street and Croatia Street
As the Toronto Transit Commission (TTC) operates a transit service on Dufferin Street, City Council approval of this report is required. As per conditions of approval for the development at 1141 Bloor Street West, 980 Dufferin Street and 90 Croatia Street, the installation of traffic control signals at the intersection of Dufferin Street and Croatia Street is required. The technical justification for the installation of traffic control signals is satisfied, therefore, the installation of traffic control signals on Dufferin Street and Croatia Street is recommended. Transportation Services supports the installation of traffic control signals at the intersection of Dufferin Street and Croatia Street.
The Toronto and East York Community Council recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Dufferin Street and Croatia Street.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. City Council authorize the installation of traffic control signals at the intersection of Dufferin Street and Croatia Street.
TE5.37adopted
Speed Bumps - Public Lane north of Dupont Street, west of Osler Street
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed the feasibility and is recommending the installation of speed bumps in the public lane north of Dupont Street, west of Osler Street (north-south).
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the public lane, west of Osler Street, between lane north of Dupont Street, west of Osler Street (east-west) and lane south of Cariboo Avenue, west of Osler Street, as shown in Attachment 1, Drawing TC-136 dated April 2023, to the report (May 5, 2023) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the public lane, west of Osler Street, between lane north of Dupont Street, west of Osler Street (east-west) and lane south of Cariboo Avenue, west of Osler Street, as shown on Drawing No. TC-136, dated April 2023 and attached to the report entitled "Speed Bumps - Public Lane north of Dupont Street, west of Osler Street", (May 5, 2023) from the Director, Traffic Management, Transportation Services.
TE5.38adopted
Speed Bumps - Public Lane west of Gilbert Avenue, north of Innes Avenue
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed the feasibility and is recommending the installation of speed bumps in the public lane west of Gilbert Avenue, north of Innes Avenue.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the public lane west of Gilbert Avenue, between Innes Avenue and Rogers Road, as shown in Attachment 1, Drawing TC-137 dated April 2023, to the report (May 5, 2023) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the public lane west of Gilbert Avenue, between Innes Avenue and Rogers Road, as shown on Drawing No. TC-137, dated April 2023 and attached to the report entitled "Speed Bumps - Public Lane west of Gilbert Avenue, north of Innes Avenue", (May 5, 2023) from the Director, Traffic Management, Transportation Services.
TE5.39adopted
Speed Bumps - Public Lane west of Ossington Avenue south of Dupont Street
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision. Transportation Services has assessed the feasibility and is recommending the installation of speed bumps in the public lane west of Ossington Avenue, south of Dupont Street.
The Toronto and East York Community Council: 1. Authorized the installation of speed bumps in the public lane west of Ossington Avenue, between Dupont Street and Hallam Street, as shown in Attachment 1, Drawing TC-138 dated April 2023, to the report (May 5, 2023) from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
The Director, Traffic Management, Transportation Services recommends that: 1. Toronto and East York Community Council authorize the installation of speed bumps in the public lane west of Ossington Avenue, between Dupont Street and Hallam Street, as shown on Drawing No. TC-138, dated April 2023 and attached to the report entitled "Speed Bumps - Public Lane west of Ossington Avenue, south of Dupont Street", (May 5, 2023) from the Director, Traffic Management, Transportation Services.
TE5.40adopted
40 kilometres per hour Speed Limit on Major Arterial Roads
In our respective wards, Wards 4 (Parkdale-High Park), 9 (Davenport), 11 (University-Rosedale), 12 (Toronto-St. Paul's), 13 (Toronto Centre) and 14 (Toronto-Danforth), there are sections of arterial roads that are already 40 km/h due to the proximity to schools or because of the 2016 Council approval of the Road Safety Plan to reduce the number of road fatalities and serious injuries. However, there are still arterial roads that are 50 km/h. With staff support, we are looking to have all arterial roads, except Lake Shore Blvd, in our wards, be reduced to 40 km/h. The intent of this motion is to improve safety and provide consistency.
The Toronto and East York Community Council recommends that: 1. City Council authorize the reduction in the speed limit of all roads designated as major arterials that currently have a speed limit above 40 kilometres per hour down to 40 kilometres per hour within the confines of Ward 4 (Parkdale-High Park), Ward 9 (Davenport), Ward 11 (University-Rosedale), Ward 12 (Toronto-St. Paul's), Ward 13 (Toronto Centre) and Ward 14 (Toronto-Danforth), excluding Lake Shore Boulevard East, Lake Shore Boulevard West, Bayview Avenue and Don Valley Parkway/Bayview-Bloor Ramp located within the aforementioned Wards, excluding any major arterial roads that bound more than the Toronto and East York Community Council area, and excluding major arterial roads that bound Wards 10 (Spadina-Fort York) or 19 (Beaches-East York). 2. City Council amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, generally as outlined in Attachment 1 to the revised letter (May 17, 2023) from Councillor Gord Perks. 3. City Council authorize and direct the appropriate City Officials to take the necessary action to give effect to City Council's decision, including the introduction in City Council of any and all Bills that may be required.
Staff recommendation as filed
Councillor Gord Perks, Councillor Alejandra Bravo, Councillor Dianne Saxe, Councillor Josh Matlow, Councillor Chris Moise and Councillor Paula Fletcher recommend that: 1. City Council authorize the reduction in the speed limit of all roads designated as major arterials that currently have a speed limit above 40 km/h down to 40 km/h within the confines of Wards 4 (Parkdale-High Park), 9 (Davenport), 11 (University-Rosedale), 12 (Toronto-St. Paul's), 13 (Toronto Centre) and 14 (Toronto-Danforth), excluding Lake Shore Boulevard East, Lake Shore Boulevard West, Bayview Avenue and Don Valley Parkway/Bayview-Bloor Ramp located within the aforementioned wards, excluding any major arterial roads that bound more than the Toronto and East York Community Council area, and excluding major arterial roads that bound Wards 10 (Spadina-Fort York) or 19 (Beaches-East York). 2. City Council amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, generally as outlined in Attachment 1 to the letter May 17, 2023 from Councillor Perks. 3. City Council authorize and direct the appropriate City Officials to take the necessary action to give effect to City Council's decision, including the introduction in Council of any and all Bills that may be required.
TE5.41adopted
Parking and Traffic Regulations - 10 Armoury Street (New Ontario Court of Justice)
The Ontario government is opening a new courthouse in Toronto as part of its plan to modernize and improve access to the justice system. The fully accessible state-of-the-art courthouse will bring six Ontario Court of Justice (OCJ) criminal courts under one roof, including specialty courts, such as those for drug treatment, youth and mental health. Located at 10 Armoury Street, the new courthouse is bounded by Armoury Street, Centre Avenue and Chestnut Street. As part of this development, various on-street parking and traffic amendments have been proposed on these roadways in order to improve barrier free parking, curbside management and also to enhance safe traffic operations in this area. The following recommendation will address this matter.
The Toronto and East York Community Council: 1. Authorized the amendments to City of Toronto Municipal Code, Chapter 903, Chapter 910 and Chapter 950, parking regulations on Centre Avenue, Armoury Street, and Chestnut Street, as described in Attachment 1 to the letter (May 4, 2023) from Councillor Ausma Malik.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council authorize the amendments to City of Toronto Municipal Code, Chapter 903, Chapter 910 and Chapter 950, parking regulations on Centre Avenue, Armoury Street, and Chestnut Street, as described in "Attachment 1: Parking and Traffic Regulations - Centre Avenue, Armoury Street, and Chestnut Street".
TE5.42adopted
I am writing to request your support in directing Traffic Operations Staff to install a speed hump on Winona Drive before the intersection with Earlsdale Avenue. Local residents and concerned parents reach out to both my office and Councillor Bravo's office, advising that this intersection should have additional traffic calming measures. There is a stop sign, but as this section of Winona Drive is one-way and downhill between Vaughan Road and St. Clair Avenue, there are many vehicles passing through - many of which fail to stop properly. At a site visit with concerned residents, my staff were informed that a speed hump prior to the intersection would be a start in getting adequate traffic calming measures at this intersection.
The Toronto and East York Community Council: 1. Waive the polling requirement under the City's Traffic Calming Policy and authorized the installation of traffic calming (speed hump) on Winona Drive, between Holland Park Avenue and Earlsdale Avenue (north intersection). 2. Directed the City Solicitor to prepare a By-law to alter the roadway to install one speed hump on Winona Drive, between Holland Park Avenue and Earlsdale Avenue (north intersection), generally as shown on Drawing TC-145 dated May, 2023, from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
It is recommended that: 1. Toronto and East York Community Council waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed hump) on Winona Drive, between Holland Park Avenue and Earlsdale Avenue (north intersection). 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway to install one speed hump on Winona Drive, between Holland Park Avenue and Earlsdale Avenue (north intersection), generally as shown on 'Drawing No. TC-145' dated May, 2023 from the Director, Traffic Management, Transportation Services.
TE5.43adopted
No Stopping West Side of Logan Avenue south of Eastern Avenue
I have been contacted by a local businesses, a recording studio, who have been having persistent issues with their loading area being blocked. Their loading area is a legal boulevard parking spot that is often blocked by illegal parking. Transportation Services has provided language to change the regulations on this short stretch to "No-Stopping" which would ensure that this access is maintained. I look forward to your support for these recommendations.
The Toronto and East York Community Council: 1. Prohibited stopping at all times on the west side of Logan Avenue, between Eastern Avenue and a point 30 metres south.
Staff recommendation as filed
Councillor Fletcher recommends that: 1. Toronto and East York Community Council prohibit stopping at all times on the west side of Logan Avenue, between Eastern Avenue and a point 30 metres south.
TE5.44adopted
100 College Street - Revising Heritage Designation Status
On August 7, 2020, the Senior Manager, Heritage Planning, Urban Design, City Planning, recommended that City Council include the property at 100 College Street (the University of Toronto's Banting Institute) on the City of Toronto's Heritage Register, and state its intention to designate the property at 100 College Street under Part IV, Section 29 of the Ontario Heritage Act. On September 16, 2020, Toronto East York Community Council deferred consideration of this recommendation until consideration of a rezoning application for this address, or consideration of the University of Toronto Secondary Plan, whichever came first. Since that time, the city has approved the University of Toronto Secondary Plan. In accordance with the Plan, the University is now seeking a development partner to build a major, much-needed, new life sciences innovation centre at this address. This centre will be a major economic asset for the city, creating thousands of jobs, and attracting top talent from around the world. The University of Toronto has satisfied me that it is not adviseable to designate 100 College Street under the Ontario Heritage Act, because designation would impede the financing and construction of this important new life sciences innovation centre. In addition, ERA Architects have provided a persuasive case that the building itself does not merit designation under the Heritage Act in terms of the 9 criteria specified in Ont. Reg. 9/06 for heritage value assessment. ERA advises that this building does not meet any of the 9 criteria. In particular, it is not the building in which Banting and Best made their world-changing discoveries, it was simply built and named in Banting's honour after the fact. Commemorating Banting and Best's discoveries is important, both to the city and to the University. Through the attached letter from President Gertler, the University has committed to work with the city on a commemoration plan that will highlight this legacy. To preserve a physical reminder of the imposing brick buildings that were built along this part of College Street in the 1930s, the University has also committed to incorporate the current 100 College St. door in an external display. For these reasons I am recommending the following.
The Toronto and East York Community Council recommends that: 1. City Council decline to designate or list 100 College Street under the Ontario Heritage Act. 2. When a zoning application is received for 100 College Street, City Council request the Chief Planner and Executive Director, City Planning to secure the commitments set out in Attachment 1 to the revised letter (May 19, 2023) from Councillor Dianne Saxe, namely: a. a commemorative strategy for acknowledgement of the University of Toronto's discoveries in life sciences including Banting and Best's work on Insulin, Till and McCulloch's discovery of stem cells, and its continued work in the area of regenerative medicine, at the time of development; and b. preservation of the current 100 College Street door while prioritizing option for its inclusion in an external display.
Staff recommendation as filed
Councillor Saxe recommends that: 1. City Council decline to designate or list 100 College Street under the Ontario Heritage Act. 2. When a zoning application is received for 100 College Street, City Council request the Chief Planner and Executive Director, City Planning to secure the commitments set out in President Gertler's letter of May 3, 2023, namely: a. a commemorative strategy for acknowledgement of the University of Toronto's discoveries in life sciences including Banting and Best's work on Insulin, Till and McCulloch's discovery of stem cells, and its continued work in the area of regenerative medicine, at the time of development, and b. preservation of the current 100 College St. door while prioritizing option for its inclusion in an external display.
TE5.45amended
This report reviews and recommends approval of an application to amend the Zoning By-law to permit a 12-storey mixed use building at 374-390 Dupont Street. The building is proposed to contain 256 dwelling units and 1,000 square metres of non-residential gross floor area.
The City Planning Division recommends that: 1. City Council amend the Official Plan, for the lands at 374-390 Dupont Street substantially in accordance with the draft Official Plan Amendment included as Attachment 6 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 2. City Council amend Zoning By-law 569-2013, for the lands at 374-390 Dupont Street substantially in accordance with the draft Zoning By-law Amendment included as Attachment 7 to the report (May 5, 2023) from the Acting Director, Community Planning, Toronto and East York District. 3. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment or draft Zoning By-law Amendment as may be required. 4. Before introducing the necessary Bills to City Council for enactment, City Council require the owner to: a. submit a Functional Servicing and Stormwater Management Report for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and b. submit a revised Rail Safety Report for review and acceptance to the satisfaction of the Director, Community Planning, Toronto and East York District. 5. City Council direct the Chief Planner and Executive Director, City Planning, in consultation with the local Ward Councillor and the City Solicitor, to continue to work with the applicant to explore an in-kind community benefit package pursuant to 37(6) of the Planning Act that includes: a. streetscape improvements on Dupont Street in the vicinity of the lands at 374-390 Dupont Street, including wider sidewalks, bump outs, street trees and similar public realm improvements; and b. public realm improvements that enhance the Dupont TTC Subway Station entrances at the northwest and southeast corners of Spadina Road and Dupont Street, including seating, vegetation, wider sidewalks and public art; and to report back to City Council for further instruction on any offer of in-kind community benefits made by the owner. 6. City Council request that the owner make reasonable commercial efforts to convey off-site parkland to the City equal to the value of the on-site parkland dedication, in fulfilment of the parkland dedication requirements pursuant to Section 42 of the Planning Act, with the off-site parkland dedication to be acceptable to the General Manager, Parks, Forestry and Recreation and free and clear of any above or below grade encumbrances, with the exception of any encumbrances as may be otherwise approved by the General Manager, Parks, Forestry and Recreation, to be conveyed prior to the issuance of the first above grade building permit; and a. in the event that the off-site parkland dedication is less than the value of the on-site parkland dedication, then the owner will pay cash-in-lieu of parkland to make up for the shortfall in parkland dedication, prior to the issuance of the first above grade building permit; and b. in the event that the owner is unable to provide an acceptable off-site parkland dedication to the City, the owner will be required to satisfy the parkland dedication requirement through the payment of cash-in-lieu; and the value of the cash-in-lieu of parkland dedication will be appraised through Real Estate Services and payment will be required prior to the issuance of the first above grade building permit.
Staff recommendation as filed
The City Planning Division recommends that: 1. City Council amend the Official Plan, for the lands at 374-390 Dupont Street substantially in accordance with the draft Official Plan Amendment included as Attachment No. 6 to this report. 2. City Council amend Zoning By-law 569-2013, for the lands at 374-390 Dupont Street substantially in accordance with the draft Zoning By-law Amendment included as Attachment No. 7 to this report. 3. City Council authorizes the City Solicitor to make such stylistic and technical changes to the draft Official Plan Amendment or draft Zoning By-law Amendment as may be required. 4. Before introducing the necessary Bills to City Council for enactment, require the owner to: a. submit a Functional Servicing and Stormwater Management Report for review and acceptance to the satisfaction of the Chief Engineer and Executive Director, Engineering and Construction Services; and b. submit a revised Rail Safety Report for review and acceptance to the satisfaction of the Director, Community Planning, Toronto and East York District.
TE5.46amended
Report Back on Metrolinx's Ontario Line Construction within the Toronto and East York District
Metrolinx's Ontario Line will be approximately 15.6 kilometres in length and will include 15 stations along its route. The Ontario Line will connect to other higher-order transit options including the Eglinton Crosstown LRT, Line 1, Line 2, and to the GO network, in addition to numerous TTC streetcar and bus routes. The purpose of this report is to provide additional information requested by the Subcommittee on Metrolinx's Ontario Line Construction within the boundaries of Toronto and East York Community Council (TEYCC), including details on: - costs of awarded contracts and the companies that make up the consortiums delivering the work; - federal funding; - provincial plans for community benefits; - engagement with Business Improvement Areas and available supports for businesses along the alignment; - ongoing activities to manage traffic congestion, including traffic management plans and permit conditions, and other construction impacts; - noise and vibration levels; - plans for tree retention and to approaches to mitigate impacts to parks during construction; and - details of affordable housing plans and impacts to housing, amongst other matters.
The Toronto and East York Community Council recommends that: 1. City Council request that prior to Metrolinx accessing Jimmie Simpson Park to remove the retaining wall that the City receive a formal written undertaking for replacement of the wading pool, replacement of the playscape and without the public release of the planned replacement wall. 2. City Council direct the Deputy City Manager, Community and Social Services to report to the July 5, 2023 meeting of the Planning and Housing Committee on the current issues faced by Fontbonne Ministries and the tenants related to the construction of the above ground Ontario Line, and replacement of rooming houses and low income tenants facing eviction with the construction of the Ontario Line. 3. City Council request the Deputy City Manager, Infrastructure and Development Services to report back to the July 6, 2023 meeting of the Economic and Community Development Committee on how a formal project labour agreement for the Ontario Line can be secured to create measurable construction hour targets for apprentices and pre-apprentices from groups previously identified by the City.
Staff recommendation as filed
The Executive Director, Transit Expansion Division recommends that: 1. Toronto and East York Community Council receive this report for information.
TE5.47adopted
Reopening and Amending TE4.76 - Permit Parking Amendments on Mountjoy Avenue
Toronto and East York Community Council, at its meeting on April 12, 2023 adopted item TE4.76, entitled "Permit Parking Amendments on Mountjoy Avenue" and in doing so approved the extension of permit parking hours on Mountjoy Avenue. The purpose of this motion is to reopen this item to amend the original recommendation of the Toronto and East York Community Council's decision, to reflect the correct extents of the proposed change.
The Toronto and East York Community Council: 1. Re-opened Item TE4.76, entitled "Permit Parking Amendments on Mountjoy Avenue" with respect to Part 1 of the Toronto and East York Community Council's decision. 2. Deleted Part 1 of its decision with respect to Item TE4.76 and adopt the following: 1. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking 5:00 a.m. to 6:00 p.m., Monday to Friday, from Ladysmith Avenue to Lamb Avenue West, on the even (north) side of Mountjoy Avenue, from Greenwood Avenue to Craven Road, to be in effect from 12:01 a.m. to 7:00 a.m. daily, from Ladysmith Avenue to Craven Road except no parking 8:00 a.m. to 6:00 p.m., Monday to Friday, from Ladysmith Avenue to Lamb Avenue. 2. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 10:00 a.m. daily on the even (north) side of Mountjoy Avenue, from Greenwood Avenue to Ladysmith Avenue. 3. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking 8:00 a.m. to 6:00 p.m., Monday to Friday, from 48 metres east of the east curb line of Ladysmith Avenue to the lane first west of Lamb Avenue, on the odd (south) side of Mountjoy Avenue, from Greenwood Avenue to Craven Road, to be in effect from a point 48 metres east of Ladysmith Avenue to Craven Road. 4. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 10:00 a.m. daily on the odd (south) side of Mountjoy Avenue, from Greenwood Avenue to a point 48 metres east of Ladysmith Avenue.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. Toronto and East York Community Council reopen Item TE4.76, entitled "Permit Parking Amendments on Mountjoy Avenue" with respect to Recommendation 1 of the decision of the Toronto and East York Community Council. 2. Toronto and East York Community Council delete Recommendation 1 of its decision with respect to Item TE4.76 and adopt the following: 1. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking 5:00 a.m. to 6:00 p.m., Monday to Friday, from Ladysmith Avenue to Lamb Avenue West, on the even (north) side of Mountjoy Avenue, from Greenwood Avenue to Craven Road, to be in effect from 12:01 a.m. to 7:00 a.m. daily, from Ladysmith Avenue to Craven Road except no parking 8:00 a.m. to 6:00 p.m., Monday to Friday, from Ladysmith Avenue to Lamb Avenue. 2. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 10:00 a.m. daily on the even (north) side of Mountjoy Avenue, from Greenwood Avenue to Ladysmith Avenue. 3. Toronto and East York Community Council amend the existing permit parking regulation in effect from 12:01 a.m. to 7:00 a.m. daily, except no parking 8:00 a.m. to 6:00 p.m., Monday to Friday, from 48 metres east of the east curb line of Ladysmith Avenue to the lane first west of Lamb Avenue, on the odd (south) side of Mountjoy Avenue, from Greenwood Avenue to Craven Road, to be in effect from a point 48 metres east of Ladysmith Avenue to Craven Road. 4. Toronto and East York Community Council authorize permit parking to be in effect from 12:01 a.m. to 10:00 a.m. daily on the odd (south) side of Mountjoy Avenue, from Greenwood Avenue to a point 48 metres east of Ladysmith Avenue.
TE5.48adopted
Speed Humps on Ladysmith Avenue
Ladysmith Avenue is a residential street located south of Danforth Avenue and east of Greenwood Avenue. It is directly adjacent to a new school and I have heard from residents concerned about the volume and speed of traffic that will use this street when the new school opens. I have polled the street and local residents support the installation of speed humps on Ladysmith Avenue.
The Toronto and East York Community Council: 1. Waived the polling requirement under the City's Traffic Calming Policy and authorized the installation of traffic calming (speed humps) on Ladysmith Avenue, between Danforth Avenue and Mountjoy Avenue 2. Directed the City Solicitor to prepare a by-law to alter the roadway to install three speed humps on Ladysmith Avenue, between Danforth Avenue and Mountjoy Avenue, generally as shown on the attached Drawing No. TC-143, dated April 2023 from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. Toronto and East York Community Council waive the polling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Ladysmith Avenue, between Danforth Avenue and Mountjoy Avenue 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway to install three speed humps on Ladysmith Avenue, between Danforth Avenue and Mountjoy Avenue, generally as shown on the attached Drawing No. TC-143, dated April 2023 from the Director, Traffic Management, Transportation Services.
TE5.49adopted
Parking Amendments - Sammon Avenue between Coxwell Avenue and Durant Avenue
I have been contacted by a local residents of Sammon Avenue who have been having ongoing issues with access to permit parking on their street. This section of Sammon Avenue, between Coxwell and Durant is also used for student pick-up and drop-off at the adjacent elementary school and is often used for short term parking for visitors to Michael Garron Hospital too. Transportation Services has provided language to change the regulations on this block of Sammon Avenue to allow for a few additional permit parking spaces for residents. I look forward to your support for these recommendations.
The Toronto and East York Community Council: 1. Amended the existing parking prohibition in effect from 9:00 a.m. to 11:00 a.m., 1:30 p.m. to 3:00 p.m., 4:00 p.m. to 6:00 p.m., Monday to Friday., except public holidays, on the north side of Sammon Avenue, between Durant Avenue and Coxwell Avenue, to be in effect from 9:00 a.m. to 3:00 p.m. and 4:00 p.m. to 6:00 p.m., Monday to Friday., except public holidays, between a point 46 metres west of Coxwell Avenue and a point 63 metres further west. 2. Amended the existing maximum 15-minute parking regulation in effect from 8:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:30 p.m., 3:00 p.m. to 4:00 p.m., Monday to Friday., except public holidays, on the north side of Sammon Avenue, between Durant Avenue and Coxwell Avenue, to be in effect 8:00 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday., except public holidays, between a point 46 metres west Coxwell Avenue and a point 63 metres further west. 3. Prohibited parking at all times on the north side of Sammon Avenue, between Coxwell Avenue and a point 46 metres west.
Staff recommendation as filed
Councillor Paula Fletcher recommends that: 1. Toronto and East York Community Council amend the existing parking prohibition in effect from 9:00 a.m. to 11:00 a.m., 1:30 p.m. to 3:00 p.m., 4:00 p.m. to 6:00 p.m., Monday to Friday., except public holidays, on the north side of Sammon Avenue, between Durant Avenue and Coxwell Avenue, to be in effect from 9:00 a.m. to 3:00 p.m. and 4:00 p.m. to 6:00 p.m., Monday to Friday., except public holidays, between a point 46 metres west of Coxwell Avenue and a point 63 metres further west. 2. Toronto and East York Community Council amend the existing maximum 15-minute parking regulation in effect from 8:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:30 p.m., 3:00 p.m. to 4:00 p.m., Monday to Friday., except public holidays, on the north side of Sammon Avenue, between Durant Avenue and Coxwell Avenue, to be in effect 8:00 a.m. to 9:00 a.m. and 3:00 p.m. to 4:00 p.m., Monday to Friday., except public holidays, between a point 46 metres west Coxwell Avenue and a point 63 metres further west. 3. Toronto and East York Community Council prohibit parking at all times on the north side of Sammon Avenue, between Coxwell Avenue and a point 46 metres west.
TE5.50adopted
Parking Amendments - Sammon Avenue between Coxwell Avenue and Knight Street
As a part of construction, Michael Garron Hospital has installed a temporary parking layby on the north side of Sammon Avenue, east of Coxwell Avenue. In order for the bylaw to reflect these changes, staff suggest the below recommendations.
The Toronto and East York Community Council: 1. Prohibited standing at all times on the north side of Sammon Avenue, between a point 42.5 metres east of Coxwell Avenue and a point 65 metres further east. 2. Amended the existing parking machine regulation in effect from 6:00 p.m. to 9:00 p.m., Monday to Friday and from 9:00 a.m. to 9:00 p.m., Saturday and Sunday, at a rate of $3.00 per hour and for a maximum period of three hours, on the north side of Sammon Avenue, between a point 30.5 metres east of Coxwell Avenue and point of 26 metres further east, to be in effect between 30.5 metres east of Coxwell Avenue and point 12 metres further east. 3. Amended the existing no stopping prohibition in effect from 7:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Sammon Avenue, between 30.5 metres east of Coxwell Avenue and a point 26 metres further east, to be in effect between 30.5 metres east of Coxwell Avenue and a point 12 metres further east. 4. Amended the existing no stopping prohibition in effect at all times on the north side of Sammon Avenue, between 56.5 metres east of Cowell Avenue and a point 74.5 metres further east, to be in effect between 107.5 metres east of Coxwell Avenue and a point 23.5 further east
Staff recommendation as filed
Councillor Brad Bradford recommends that: 1. Toronto and East York Community Council prohibit standing at all times on the north side of Sammon Avenue, between a point 42.5 metres east of Coxwell Avenue and a point 65 metres further east. 2. Toronto and East York Community Council amend the existing parking machine regulation in effect from 6:00 p.m. to 9:00 p.m., Monday to Friday and from 9:00 a.m. to 9:00 p.m., Saturday and Sunday, at a rate of $3.00 per hour and for a maximum period of three hours, on the north side of Sammon Avenue, between a point 30.5 metres east of Coxwell Avenue and point of 26 metres further east, to be in effect between 30.5 metres east of Coxwell Avenue and point 12 metres further east. 3. Toronto and East York Community Council amend the existing no stopping prohibition in effect from 7:00 a.m. to 6:00 p.m., Monday to Friday, on the north side of Sammon Avenue, between 30.5 metres east of Coxwell Avenue and a point 26 metres further east, to be in effect between 30.5 metres east of Coxwell Avenue and a point 12 metres further east. 4. Toronto and East York Community Council amend the existing no stopping prohibition in effect at all times on the north side of Sammon Avenue, between 56.5 metres east of Cowell Avenue and a point 74.5 metres further east, to be in effect between 107.5 metres east of Coxwell Avenue and a point 23.5 further east
TE5.51adopted
All-way stop controls around Secord Elementary School
Toronto and East York Community Council, at its meeting on February 16, 2022 adopted item TE31.95, entitled "Road Safety Improvements around Secord Elementary School" and approved the installation all-way stop controls at a number of local streets in the vicinity of Secord Elementary School. The purpose of this motion is to revise Recommendations 1 to 6, to accommodate the by-law requirements necessary to ensure the already authorized signage is enforceable.
The Toronto and East York Community Council: 1. Authorized an all-way compulsory stop control at the intersection of Chisholm Avenue and Lumsden Avenue (north intersection). 2. Authorized an all-way compulsory stop control at the intersection of Chisholm Avenue and Lumsden Avenue (south intersection). 3. Authorized an all-way compulsory stop control at the intersection of Secord Avenue and Eastdale Avenue. 4. Authorized an all-way compulsory stop control at the intersection of Palmer Avenue and Dentonia Park Avenue. 5. Authorized an all-way compulsory stop control at the intersection of Dentonia Park Avenue and Maryland Boulevard. 6. Rescinded the existing compulsory stop control at the intersection of Dentonia Park Avenue and Avonlea Boulevard. 7. Authorized an all-way compulsory stop control at the intersection of Avonlea Boulevard and Dentonia Park Avenue (north intersection). 8. Authorized an all-way compulsory stop control at the intersection of Avonlea Boulevard and Dentonia Park Avenue (south intersection) 9. Authorized a compulsory stop control for northbound traffic on Sibley Avenue at Dentonia Park Avenue.
Staff recommendation as filed
Councillor Brad Bradford recommends that: 1. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Chisholm Avenue and Lumsden Avenue (north intersection). 2. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Chisholm Avenue and Lumsden Avenue (south intersection). 3. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Secord Avenue and Eastdale Avenue. 4. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Palmer Avenue and Dentonia Park Avenue. 5. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Dentonia Park Avenue and Maryland Boulevard. 6. Toronto and East York Community Council rescind the existing compulsory stop control at the intersection of Dentonia Park Avenue and Avonlea Boulevard. 7. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Avonlea Boulevard and Dentonia Park Avenue (north intersection). 8. Toronto and East York Community Council authorize an all-way compulsory stop control at the intersection of Avonlea Boulevard and Dentonia Park Avenue (south intersection) 9. Toronto and East York Community Council authorize a compulsory stop control for northbound traffic on Sibley Avenue at Dentonia Park Avenue.
TE5.52adopted
Traffic Calming - Wolverleigh Boulevard, between Glebemount Avenue and Woodbine Avenue
Residents have reached out to my office with concerns about road safety and speeding along Wolverleigh Blvd. My office polled local residents and the majority were in favour. In order to make our community safer for all, I recommend installing speed humps on this street.
The Toronto and East York Community Council: 1. Waived the poling requirement under the City's Traffic Calming Policy and authorized the installation of traffic calming (speed humps) on Wolverleigh Boulevard, between Glebemount Avenue and Woodbine Avenue. 2. Directed the City Solicitor to prepare a by-law to alter the roadway to install three speed humps on Wolverleigh Boulevard, between Glebemount Avenue and Woodbine Avenue, generally as shown on the attached Drawing 421G-3902, dated August 2021, from the Director, Traffic Management, Transportation Services.
Staff recommendation as filed
Councillor Brad Bradford recommends that: 1. Toronto and East York Community Council waive the poling requirement under the City's Traffic Calming Policy and authorize the installation of traffic calming (speed humps) on Wolverleigh Boulevard, between Glebemount Avenue and Woodbine Avenue. 2. Toronto and East York Community Council direct the City Solicitor to prepare a by-law to alter the roadway to install three speed humps on Wolverleigh Boulevard, between Glebemount Avenue and Woodbine Avenue, generally as shown on the attached Drawing No. 421G-3902, dated August 2021 from the Director, Traffic Management, Transportation Services.
TE5.53adopted
40 kilometre per hour Speed Limit on Minor Arterial Roads
In our respective wards, Wards 4 (Parkdale-High Park), 9 (Davenport), 11 (University-Rosedale), 12 (Toronto-St. Paul's), 13 (Toronto Centre) and 14 (Toronto-Danforth), there are sections of arterial roads that are already 40 km/h due to the proximity to schools or because of the 2016 Council approval of the Road Safety Plan to reduce the number of road fatalities and serious injuries. However, there are still arterial roads that are 50 km/h. With staff support, we are looking to have all arterial roads, except Lake Shore Blvd, in our wards, be reduced to 40 km/h. The intent of this motion is to improve safety and provide consistency.
The Toronto and East York Community Council: 1. Authorized the reduction in the speed limit of all roads designated as minor arterials that currently have a speed limit above 40 kilometres per hour down to 40 kilometres per hour within the confines of Ward 4 (Parkdale-High Park), Ward 9 (Davenport), Ward 11 (University-Rosedale), Ward 12 (Toronto-St. Paul's), Ward 13 (Toronto Centre) and Ward 14 (Toronto-Danforth), excluding any minor arterial roads that bound more than the Toronto and East York Community Council area, and excluding minor arterial roads that bound Ward 10 (Spadina-Fort York) or Ward19 (Beaches-East York). 2. Amended City of Toronto Municipal Code Chapter 950, Traffic and Parking, generally as outlined in Attachment 1 to the letter (May 17, 2023) from Councillor Perks. 3. Authorized and directed the appropriate City Officials to take the necessary action to give effect to Toronto and East York Community Council's decision, including the introduction of any and all Bills that may be required.
Staff recommendation as filed
Councillor Gord Perks, Councillor Alejandra Bravo, Councillor Saxe, Councillor Josh Matlow, Councillor Chris Moise and Councillor Paula Fletcher recommend that: 1. Toronto and East York Community Council authorize the reduction in the speed limit of all roads designated as minor arterials that currently have a speed limit above 40 km/h down to 40 km/h within the confines of Wards 4 (Parkdale-High Park), 9 (Davenport), 11 (University-Rosedale), 12 (Toronto-St. Paul's), 13 (Toronto Centre) and 14 (Toronto-Danforth), excluding any minor arterial roads that bound more than the Toronto and East York Community Council area, and excluding minor arterial roads that bound Wards 10 (Spadina-Fort York) or 19 (Beaches-East York). 2. Toronto and East York Community Council amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, generally as outlined in Attachment 1 to the letter May 17th, 2023 from Councillor Perks. 3. Toronto and East York Community Council authorize and direct the appropriate City Officials to take the necessary action to give effect to City Council's decision, including the introduction in Council of any and all Bills that may be required.
TE5.54adopted
Parking relief for Wheeler Ave (Norway Avenue and Williamson Road - Parking Changes)
Toronto Water will complete watermain repair work on Wheeler Avenue, north of Norway Avenue, which is scheduled to take place until October 31, 2023. The work will result in the loss of on-street permit parking spaces on Wheeler Avenue. In order to ensure accessibility for residents requiring accessible parking during this project, City staff have requested the following amendments to parking regulations on Norway Avenue and on Williamson Road. Cycling will be maintained on Norway Avenue via shared lane.
The Toronto and East York Community Council: 1. Rescinded all existing parking prohibition in effect at all times on both sides of Norway Avenue between Lee Avenue and Kennilworth Avenue. 2 Rescinded all permit parking on both sides of Norway Avenue, between Lee Avenue and Kennilworth Avenue. 3. Designated permit parking, from 12:01 a.m. to 7:00 a.m., on both sides of Norway Avenue, between Lee Avenue and Kennilworth Avenue. 4. Rescinded the school bus loading zone on the north side of Williamson Road, between a point 9 metres west of a point opposite Wineva Avenue and a point 29 metres further west, for the period from July 1, 2023 to August 31, 2023. 5. Rescinded the parking for restricted periods on the north side of Williamson Road, between a point opposite Hambly Avenue and a point 38 metres west of a point opposite Wineva Avenue, for the period from July 1, 2023 to August 31, 2023. 6. Rescinded the no standing on the north side of Williamson Road, between a point opposite Hambly Avenue and a point 15 metres east of Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 7. Rescinded the no stopping on the north side of Williamson Road, between a point opposite Wineva Avenue and a point 38 metres west of Wineva Avenue, for the period from July 1, 2023 to August 31, 2023. 8. Designated permit parking, from 12:01 a.m. to 7:00 a.m., on the north side of Williamson Road, between a point opposite Wineva Avenue and a point opposite Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 9. Directed that Norway Avenue be returned to pre-construction traffic and parking regulations when the project is complete.
Staff recommendation as filed
Councillor Brad Bradford recommends that the Toronto and East York Community Council: 1. Rescind all existing parking prohibition in effect at all times on both sides of Norway Avenue between Lee Avenue and Kennilworth Avenue. 2 Rescind all permit parking on both sides of Norway Avenue, between Lee Avenue and Kennilworth Avenue. 3. Designate permit parking, from 12:01 a.m. to 7:00 a.m., on both sides of Norway Avenue, between Lee Avenue and Kennilworth Avenue. 4. Rescind the school bus loading zone on the north side of Williamson Road, between a point 9 metres west of a point opposite Wineva Avenue and a point 29 metres further west, for the period from July 1, 2023 to August 31, 2023. 5. Rescind the parking for restricted periods on the north side of Williamson Road, between a point opposite Hambly Avenue and a point 38 metres west of a point opposite Wineva Avenue, for the period from July 1, 2023 to August 31, 2023. 6. Rescind the no standing on the north side of Williamson Road, between a point opposite Hambly Avenue and a point 15 metres east of Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 7. Rescind the no stopping on the north side of Williamson Road, between a point opposite Wineva Avenue and a point 38 metres west of Wineva Avenue, for the period from July 1, 2023 to August 31, 2023. 8. Designate permit parking, from 12:01 a.m. to 7:00 a.m., on the north side of Williamson Road, between a point opposite Wineva Avenue and a point opposite Hambly Avenue, for the period from July 1, 2023 to August 31, 2023. 9. Direct that Norway Avenue be returned to pre-construction traffic and parking regulations when the project is complete.
TE5.55adopted
Toronto and East York Community Council will introduce bills.
General Bills Toronto and East York Community Council enacted By-laws 508-2023 to 533-2023. Confirmatory Bill Toronto and East York Community Council passed a Confirmatory Bill as By-law 534-2023.